Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
PW As Needed Spot Sewer Replacement No 47
0% in published scope
Public Works · Spot repairs · Construction · Under way, ends 26 Oct 2026
28 of the project's 49 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 11th Ave, 14th Ave, 15th Ave, 16th Ave, 16th St, 17th St
- Planned bikeway
- Shared street, 5.9 mi on 47th Ave, 8th Ave, Cabrillo St, Geneva Ave
Separated bikeway, 1.4 mi on 17th St, Harney Way, Bay Shore Blvd, 3rd St
Shared-use path, 0.26 mi on Great Hwy
Level 3 shared street, 0.18 mi on Connecticut St
Bikeway of undecided type, 0.091 mi on Sutter St - Would reach
- 29,883 residents (2020 census), 13 schools, 1 library would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 28 street segments that lack one. Closer in: 25,184 residents, 2 schools, 1 library with none within about one block (440 feet) today would have one; 26,811 residents, 2 schools with none within about two blocks (880 feet) today would have one
- Scope
- “2533i”
- Dates
Start End Public consultation not published not published Construction Sep 2025 Oct 2026 - Records
- SFPUC contract page (WW-783 As-Needed Spot Sewer Replacement No. 47) · Interagency coordination feed record (DataSF row)
City decisions naming this project
- Award Contract No. WW-783, As-Needed Spot Sewer Replacement No. 47, to the sole, responsible bidder that submitted a responsive bid, J. Flores Construction Company, Inc., in the amount of $11,378,108 and with a duration …22 Jul 2025 · SFPUC Commission · approve the Consent Calendar
29 decisions on the same streets, not naming this project
- Award Contract No. WW-795, Sansome Street Outfall Improvements, to the responsible bidder that submitted the lowest responsive bid, R&S Construction Management, Inc., in the amount of $3,322,700 and with a duration of 30…9 Dec 2025 · SFPUC Commission · approve the Consent Calendar
- Accept work performed by M. Squared Construction, Inc., under Contract No. WD- 2896, 12-Inch Ductile Iron Water Main Installation on Webster Street from Grove Street to Eddy Street; approve Modification No. 3 (Final) dec…10 Nov 2025 · SFPUC Commission · approve the Consent Calendar
- Award Contract No. WW-757R, Laguna, Howard, and Mission Creek Combined Sewer Discharge Improvements, to the responsible bidder that submitted the lowest responsive bid, Pullman SST, Inc., in the amount of $7,296,786, wit…13 May 2025 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Shotwell Street, east side, from 20th Street to 24 feet southerly (for 17-foot corral and red zones) (Supervisor District 9) (Approvable by the City Traffic Engineer) Gran…6 Dec 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Award Contract No. WW-743, Geary Boulevard Sewer and Water Improvements Phase 2, to the responsible bidder that submitted the lowest responsive bid, Cratus, Inc., in the amount of $45,957,035, and with a duration of 1,03…25 Jun 2024 · SFPUC Commission
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Sacramento Street, north side, from 172 feet to 192 feet east of Spruce Street (removes stall #3630 for a 17-foot bike corral and 3-foot red zone) (Supervisor District 2) …17 May 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase in the amount of $2,500,000 to the cost contingency and an increase of 100 calendar days to the duration contingency for Contract No. WW-736, Castro and Mission Districts Sewer Improvements, with Prec…14 May 2024 · SFPUC Commission
- Award Contract No. WD-2765, 8-Inch and 16-Inch Ductile Iron Water Main Replacement on Jersey Street from Douglass Street to Church Street and Various Street Locations, to the responsible bidder that submitted the lowest …9 Apr 2024 · SFPUC Commission · approve the Consent Calendar
- Approve an increase of 185 calendar days to the contract duration contingency for Contract No. WW-705, Various Locations Sewer Replacement No. 10, with Mitchell Engineering, for a new contract duration limit of up to 570…26 Mar 2024 · SFPUC Commission · approve items 6a through 6e
- Accept work performed by Pipe and Plant Solutions, Inc., under Contract No. WW-675, 5th/18th/Upper Larkin Street Sewer Inspection; approve Modification No. 2 (Final) decreasing contract amount by $10,000, for a total con…12 Mar 2024 · SFPUC Commission · approve the Consent Calendar
- Accept work performed by Trinet Construction, Inc. for Contract No. WW-737, Baker St. Combined Sewer Discharge Baffle Improvements & Backflow Valve Repair; approve Modification No. 1 (Final) decreasing the Contract amoun…23 Jan 2024 · SFPUC Commission · approve items 7a through 7i
- Award Contract No. WD-2896, 12-Inch Ductile Iron Water Main Installation on Webster Street from Grove Street to Eddy Street, to the responsible bidder that submitted the lowest responsive bid, M. Squared Construction, In…9 Jan 2024 · SFPUC Commission · approve items 6a through 6i
- ESTABLISH – SIDEWALK BIKE SHARE STATION 14th Avenue, east side, from 5 feet to 78 feet south of Geary Boulevard (72 feet 6 inch bike share station with a 20-foot red zone daylighting at the northern end of the station) (…18 Aug 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Accept work performed by D’Arcy & Harty Construction, Inc for Contract No. WW-712, New Montgomery, Jessie, Minna, and Mission Street Brick Sewer Rehabilitation, for a total contract amount of $6,891,778, and with a total…9 May 2023 · SFPUC Commission · approve the Consent Calendar
- Approve an increase of $180,000 to the contract cost contingency, and an increase of 180 calendar days to the contract duration contingency, for Contract No. WW-675, 5th/18th/Upper Larkin Street Sewer Inspection; and aut…28 Feb 2023 · SFPUC Commission · approve Consent Calendar Items 6a through 6d
- Award Contract No. WW-737, Baker St. Combined Sewer Discharge Baffle Improvements & Backflow Valve Repair, in the amount of $566,000, and with a duration of 240 consecutive calendar days, to the responsible bidder that s…10 Jan 2023 · SFPUC Commission · Approve Consent Calendar Items 6a through 6j
- Approve the plans and specifications and award Contract No. WW-684, 45th, 46th, 47th Aves, Vicente, Wawona Streets and Sloat Blvd. Sewer Replacement, in the amount of $7,342,613, and with a duration of 375 consecutive ca…8 Nov 2022 · SFPUC Commission · approve the Consent Calendar, with the amendment to the date on the
- Approve an increase of $2,250,000 to the contract cost contingency, and an increase of 180 consecutive calendar days to the contract duration contingency for Contract No. WW-712, New Montgomery, Jessie, Minna, and Missio…8 Feb 2022 · SFPUC Commission · approve Item 10
- Approve an increase of 30 consecutive calendar days to the contract duration contingency for Contract No. WW-703, Mission Street, 16th to Cesar Chavez Street, Brick Sewer Rehabilitation; and authorize the General Manager…14 Dec 2021 · SFPUC Commission · approve Consent Calendar items 10a through 10g
- Accept work performed by JDB & Sons Construction for Contract No. WW-611, Cutler Avenue, Lower Great Highway, Sloat Boulevard, and Wawona Street Sewer Replacement; approve Modification No. 6 (Final) decreasing the contra…23 Nov 2021 · SFPUC Commission · approve Consent Calendar items 10a, 10c, 10d, and 10e
- Accept work performed by Mitchell Engineering for Contract No. WD-2719, 8-Inch Ductile Iron Pipe and 12-Inch Earthquake Resistant Ductile Iron Pipe Water Main Installation on 22nd Street from Fair Oaks Street to Hampshir…24 Aug 2021 · SFPUC Commission · approve Item 10
- Accept work performed by JMB Construction, Inc. for Contract No. WW-674R, Geary Boulevard Sewer and Water Improvements; approve Modification No. 2 (final) decreasing the contract amount by $494,459, for a total contract …10 Aug 2021 · SFPUC Commission · approve Consent Calendar items 8a, 8b, and 8d
- Accept work performed by Cratus, Inc. for Contract No. WD-2614, 8-Inch Ductile Iron Water Main Replacement on Green Street from Gough Street to Broderick Street; approve Modification No. 2 (Final), decreasing the contrac…8 Jun 2021 · SFPUC Commission · approve the Consent Calendar 8a through 8e
- Approve the plans and specifications, and award Contract No. WW-712, New Montgomery, Jessie, Minna, and Mission Streets Brick Sewer Rehabilitation, in the amount of $4,888,750, and with a duration of 390 consecutive cale…11 May 2021 · SFPUC Commission · approve Consent Calendar items 8c, 8d, and 8g
- Approve an increase of 280 calendar days to the contract duration contingency for Contract No. WW-691, Sunset Boulevard Greenway – Phase II, Irving Street to Ulloa Street with Minerva Construction, Inc.; and authorize th…27 Apr 2021 · SFPUC Commission · approve Consent Calendar items 9a and 9b
- ESTABLISH - CLASS 2 BIKE LANE Geneva Avenue, both directions, between Prague Street and Brookdale Avenue Dusson Yeung, [staff email removed — see the order] (Supervisor Districts 10 & 11) Upgrade narrow shoulders to 5-fo…16 Apr 2021 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- RESCIND – TRAFFIC ISLANDS Sickles Avenue, west median island from Alemany Boulevard to 30 feet westerly Sustainable Streets Division Sickles Avenue, east median island from Alemany Boulevard to 30 feet easterly 10(b). ES…30 Oct 2020 · Engineering hearing · Item 10(c) approved by the City Traffic Engineer to forward to the SFMTA Board for approval and implementation. All other items approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Arlington Street, south side, from Roanoke Street to 65 feet westerly (53-foot bike share station with red zones) (Supervisor District 8) Project Con…12 Jun 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 14th Avenue, east side, from Geary Boulevard to 82 feet southerly (72-foot bike share station with red zones on either side) (Supervisor District 1) …4 Oct 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 5 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- District 11-Wide Traffic Calming ProjectSFMTA · 22 shared street segments
- Excelsior Neighborhood Traffic Calming ProjectSFMTA · Completed · 14 shared street segments
- Outer Sunset Traffic Management ProjectSFMTA · Completed · 11 shared street segments
- Visitacion Valley and Portola Community Based Transportation PlanSFMTA · Planning · 11 shared street segments
- Bayview Community Based Transportation PlanSFMTA · Planning · 8 shared street segments
- Dogpatch-Central Waterfront Area Transit Connections StudySFMTA · Current · 8 shared street segments
- Slow StreetsSFMTA · Construction · 6 shared street segments
- Mission District Sewer Rehabilitation (VLLD2B)Public Works · Design · 5 shared street segments
How we built this: About the Data