Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
PEFWS Pipeline Contract B - 36-inch Welded Steel Pipe
0% in published scope
SFPUC · Sewer, water or power · Design · Under way, ends 1 Mar 2028
All 16 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 36th Ave, 37th Ave, Sloat Blvd, Wawona St
- Planned bikeway
- Separated bikeway, 0.99 mi on Sloat Blvd
- Would reach
- No one new would be within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 16 street segments that lack one. Closer in: 44 residents (2020 census) with none within about one block (440 feet) today would have one
- Scope
- “None”
- Dates
Start End Public consultation not published not published Construction Apr 2024 Mar 2028 - Sources disagree
- The coordination feed gives construction starting 2024-04-01; SFPUC's project page text gives 2027 (“2027”).
The start date has passed (2024-04-01) while the phase is still Design, per the coordination feed. - Records
- SFPUC project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
10 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKESHARE STATION Sloat Boulevard, south side, from 47th Avenue to 57 feet westerly (in the buffer adjacent to the two- way bikeway) (Supervisor District 7) (Approvabl…12 Jun 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING ANY TIME, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 37th Avenue, east side, from 5 feet to 68 feet north of Rivera Street (63-foot station) (Supervisor District 4) (Approvable by the City Tra…20 Sep 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Sloat Boulevard, north side, from 10 feet to 20 feet east of 45th Avenue (Supervisor District 4 and 7) (Approvable by the City Traffic Engineer) Grant Brokl, [staff email …17 May 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase of 115 calendar days to the contract duration contingency for Contract No. WW-684, 45th, 46th, 47th Aves, Vicente and, Wawona Streets, and Sloat Blvd Sewer Replacement, with Precision Engineering, Inc…26 Mar 2024 · SFPUC Commission · approve items 6a through 6e
- ESTABLISH – CLASS IV BIKEWAY Sloat Boulevard, eastbound and westbound, from 47th Avenue to Skyline Boulevard (two-way protected bikeway on south side of roadway)* 10(b). RESCIND – CLASS II BIKEWAY Sloat Boulevard, eastbo…16 Jun 2023 · Engineering hearing · Lengthened and relocated taxi zone and adjusted passenger loading and blue zone locations based on public hearing feedback. Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 36th Avenue, west side, from Ortega Street to 62 feet northerly (52-foot bike share station with red zones on either end) (Supervisor District 4) (Ap…6 Jan 2023 · Engineering hearing · Item withdrawn. Item #36 is a duplicate of item #28.
- Approve the plans and specifications and award Contract No. WW-684, 45th, 46th, 47th Aves, Vicente, Wawona Streets and Sloat Blvd. Sewer Replacement, in the amount of $7,342,613, and with a duration of 375 consecutive ca…8 Nov 2022 · SFPUC Commission · approve the Consent Calendar, with the amendment to the date on the
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 36th Avenue, west side, from Ortega Street to 62 feet northerly (52-foot bike share station with red zones on either end) (Supervisor District 4) (Ap…18 Feb 2022 · Engineering hearing · Item withdrawn.
- Accept work performed by JDB & Sons Construction for Contract No. WW-611, Cutler Avenue, Lower Great Highway, Sloat Boulevard, and Wawona Street Sewer Replacement; approve Modification No. 6 (Final) decreasing the contra…23 Nov 2021 · SFPUC Commission · approve Consent Calendar items 10a, 10c, 10d, and 10e
- Authorize the General Manager to execute a Project Partnership Agreement with the Army Corps of Engineers (ACOE) for the construction of the Ocean Beach Beneficial Use of Dredged Materials Project to place sand dredged f…23 Feb 2021 · SFPUC Commission · approve Consent Item 22
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Outer Sunset Traffic Management ProjectSFMTA · Completed · 15 shared street segments
- Sunset Irrigation Recycled WaterPublic Works · Design · 6 shared street segments
- Various Locations Sewer Replacement No 27Public Works · Design · 3 shared street segments
- Vicente Street Bicycle and Pedestrian Safety ProjectSFMTA · Completed · 2 shared street segments
- Various Locations Sewer Replacement No 30Public Works · Design · 1 shared street segment
- Street Resurfacing Program- BBSR Paving FY 26-27Public Works · Construction · 1 shared street segment
- WD-2922: 8-inch Ductile Iron Water Main Replacement on Lincoln Way from Sunset to La Playa St and Various Side StreetsSFPUC · Design · 1 shared street segment
- PEFWS Pipeline Contract C - 24-inch 42nd (between Lawton & Irving)SFPUC · Planning · 1 shared street segment
How we built this: About the Data