PEFWS Pipeline Contract B - 36-inch Welded Steel Pipe

0% in published scope

SFPUC · Sewer, water or power · Design · Under way, ends 1 Mar 2028

All 16 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
36th Ave, 37th Ave, Sloat Blvd, Wawona St
Planned bikeway
Separated bikeway, 0.99 mi on Sloat Blvd
Would reach
No one new would be within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 16 street segments that lack one. Closer in: 44 residents (2020 census) with none within about one block (440 feet) today would have one
Scope
“None”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionApr 2024Mar 2028
Sources disagree
The coordination feed gives construction starting 2024-04-01; SFPUC's project page text gives 2027 (“2027”).
The start date has passed (2024-04-01) while the phase is still Design, per the coordination feed.
Records
SFPUC project page · Interagency coordination feed record (DataSF row)

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

10 decisions on the same streets, not naming this project

Construction on these street segments

202420252026202720282029203020312032todayPEFWS Pipeline Contract B - 36-inch …Street Resurfacing Program- BBSR Pav…Various Locations Sewer Replacement …Various Locations Sewer Replacement …Sunset Irrigation Recycled WaterWD-2922: 8-inch Ductile Iron Water M…PEFWS Pipeline Contract C - 24-inch …Street Resurfacing Program- BBSR Paving FY 26-27: construction 1 Jul 2026 to 7 Jul 2027Various Locations Sewer Replacement No 27: construction 19 Feb 2027 to 19 Feb 2028Various Locations Sewer Replacement No 30: construction 12 Apr 2027 to 19 Jul 2028Sunset Irrigation Recycled Water: construction 29 Jun 2027 to 2 Mar 2029WD-2922: 8-inch Ductile Iron Water Main Replacement on Lincoln Way from Sunset to La Playa St and Various Side Streets: construction 25 Jun 2028 to 6 Nov 2029PEFWS Pipeline Contract C - 24-inch 42nd (between Lawton & Irving): construction 1 Jan 2029 to 31 Dec 2031PEFWS Pipeline Contract B - 36-inch Welded Steel Pipe: construction 1 Apr 2024 to 1 Mar 20281 Apr 2024 – 1 Mar 20281 Jul 2026 – 7 Jul 202719 Feb 2027 – 19 Feb 202812 Apr 2027 – 19 Jul 202829 Jun 2027 – 2 Mar 202925 Jun 2028 – 6 Nov 20291 Jan 2029 – 31 Dec 2031

Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.

8 other projects on these street segments