Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
PEFWS Pipeline - 36- & 42-inch Welded Steel Pipe
0% in published scope
SFPUC · Sewer, water or power · Design · Under way, ends 1 Dec 2026
2 of the project's 13 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 23rd Ave, Lake Merced Blvd, Middlefield Dr, Ocean Ave
- Planned bikeway
- Shared-use path, 1.3 mi on Lake Merced Blvd
Shared street, 0.77 mi on Ocean Ave
Separated bikeway, 0.71 mi on Lake Merced Blvd - Scope
- “None”
- Dates
Start End Public consultation not published not published Construction Apr 2024 Dec 2026 - Sources disagree
- The coordination feed gives construction starting 2024-04-01; SFPUC's project page text gives 2027 (“2027”).
The start date has passed (2024-04-01) while the phase is still Design, per the coordination feed. - Records
- SFPUC project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
3 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING ANY TIME, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 23rd Avenue, east side, from 10 feet to 73 feet south of Sloat Boulevard (63-foot station) (Supervisor District 4) (Approvable by the City …20 Sep 2024 · Engineering hearing · Continued.
- Approve and recommend to the Board of Supervisors the conditional termination of certain sewer and water easements encumbering San Francisco Blocks 7332, 7333, 7333A, and 7333B located within Parkmerced near Lake Merced …24 May 2022 · SFPUC Commission · approve Item 14
- ESTABLISH - NO TURN ON RED, EXCEPT BICYCLES Ocean Avenue, westbound, at Alemany Boulevard (Approvable by City Traffic Engineer) (Supervisor District 11) Winnie Lee, [staff email removed — see the order]2 Apr 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. Sustainable Streets Division
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.
6 other projects on these street segments
- Lake Merced Quick-Build ProjectSFMTA · Completed · 7 shared street segments
- Holloway Ave and Lake Merced Blvd Pavement RenovationPublic Works · Planning · 5 shared street segments
- Parkmerced ProjectSFMTA · Planning · 3 shared street segments
- Winston Drive Quick-Build ProjectSFMTA · Implementation / Construction · 2 shared street segments
- Various Locations Sewer Replacement No 38Public Works · Design · 1 shared street segment
- Various Locations Pavement Renovation No 68Public Works · Construction · 1 shared street segment
How we built this: About the Data