Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Sewer Replacement No 30
0% in published scope
Public Works · Sewer, water or power · Design · Starts 12 Apr 2027, ends 19 Jul 2028
2 of the project's 3 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 12th Ave, 14th Ave, 15th Ave, 16th Ave, 18th Ave, 21st Ave
- Planned bikeway
- Shared street, 0.64 mi on 12th Ave, 34th Ave, Rivera St
- Would reach
- 2,710 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 2 street segments that lack one. Closer in: 2,849 residents with none within about one block (440 feet) today would have one; 2,914 residents with none within about two blocks (880 feet) today would have one
- Scope
- “2566i”
- Dates
Start End Public consultation not published not published Construction Apr 2027 Jul 2028 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
8 decisions on the same streets, not naming this project
- Award Grant Agreement No. PRO.0300 (G), Demonstration Garden Programming and Maintenance to Earth Island Institute, acting as the fiscal sponsor for Garden for the Environment, to operate a public demonstration garden an…11 Mar 2025 · SFPUC Commission · approve the Consent Calendar Item Nos. 6a, 6b, and 6c
- Award Contract No. WW-743, Geary Boulevard Sewer and Water Improvements Phase 2, to the responsible bidder that submitted the lowest responsive bid, Cratus, Inc., in the amount of $45,957,035, and with a duration of 1,03…25 Jun 2024 · SFPUC Commission
- Approve an increase of 115 calendar days to the contract duration contingency for Contract No. WW-684, 45th, 46th, 47th Aves, Vicente and, Wawona Streets, and Sloat Blvd Sewer Replacement, with Precision Engineering, Inc…26 Mar 2024 · SFPUC Commission · approve items 6a through 6e
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 15th Avenue, north side, from 5 feet to 67 feet west of Portola Drive (62-foot bike share station) (Supervisor District 7) (Approvable by the City T…22 Mar 2024 · Engineering hearing · Item withdrawn.
- ESTABLISH – SIDEWALK BIKE SHARE STATION 14th Avenue, east side, from 5 feet to 78 feet south of Geary Boulevard (72 feet 6 inch bike share station with a 20-foot red zone daylighting at the northern end of the station) (…18 Aug 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve the plans and specifications and award Contract No. WW-684, 45th, 46th, 47th Aves, Vicente, Wawona Streets and Sloat Blvd. Sewer Replacement, in the amount of $7,342,613, and with a duration of 375 consecutive ca…8 Nov 2022 · SFPUC Commission · approve the Consent Calendar, with the amendment to the date on the
- Approve an increase of 280 calendar days to the contract duration contingency for Contract No. WW-691, Sunset Boulevard Greenway – Phase II, Irving Street to Ulloa Street with Minerva Construction, Inc.; and authorize th…27 Apr 2021 · SFPUC Commission · approve Consent Calendar items 9a and 9b
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 14th Avenue, east side, from Geary Boulevard to 82 feet southerly (72-foot bike share station with red zones on either side) (Supervisor District 1) …4 Oct 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 3 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Outer Sunset Traffic Management ProjectSFMTA · Completed · 7 shared street segments
- WD-2922: 8-inch Ductile Iron Water Main Replacement on Lincoln Way from Sunset to La Playa St and Various Side StreetsSFPUC · Design · 6 shared street segments
- Street Resurfacing Program- BBSR Paving FY 26-27Public Works · Construction · 4 shared street segments
- N-JudahSFMTA · Planning · 4 shared street segments
- PEFWS Pipeline Contract C - 24-inch 42nd (between Lawton & Irving)SFPUC · Planning · 3 shared street segments
- Slow StreetsSFMTA · Construction · 3 shared street segments
- WD-2922: 8-inch Ductile Iron Water Main Replacement on Lincoln Way and Irving St from Sunset Blvd to 19th Ave and Various Side StreetsSFPUC · Design · 3 shared street segments
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 2 shared street segments