Various Locations Sewer Replacement No 30

0% in published scope

Public Works · Sewer, water or power · Design · Starts 12 Apr 2027, ends 19 Jul 2028

Early enough to change: Public Works gives its phase as Design. No meeting on it is posted for the next 60 days.

2 of the project's 3 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
12th Ave, 14th Ave, 15th Ave, 16th Ave, 18th Ave, 21st Ave
Planned bikeway
Shared street, 0.64 mi on 12th Ave, 34th Ave, Rivera St
Would reach
2,710 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 2 street segments that lack one. Closer in: 2,849 residents with none within about one block (440 feet) today would have one; 2,914 residents with none within about two blocks (880 feet) today would have one
Scope
“2566i”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionApr 2027Jul 2028
Records
Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

8 decisions on the same streets, not naming this project

Construction on these street segments

20252026202720282029203020312032todayVarious Locations Sewer Replacement …PW As Needed Spot Sewer Replacement …Street Resurfacing Program- BBSR Pav…WD-2922: 8-inch Ductile Iron Water M…WD-2922: 8-inch Ductile Iron Water M…PEFWS Pipeline Contract C - 24-inch …PW As Needed Spot Sewer Replacement No 47: construction 22 Sep 2025 to 26 Oct 2026Street Resurfacing Program- BBSR Paving FY 26-27: construction 1 Jul 2026 to 7 Jul 2027WD-2922: 8-inch Ductile Iron Water Main Replacement on Lincoln Way and Irving St from Sunset Blvd to 19th Ave and Various Side Streets: construction 7 Aug 2026 to 29 Sep 2030WD-2922: 8-inch Ductile Iron Water Main Replacement on Lincoln Way from Sunset to La Playa St and Various Side Streets: construction 25 Jun 2028 to 6 Nov 2029PEFWS Pipeline Contract C - 24-inch 42nd (between Lawton & Irving): construction 1 Jan 2029 to 31 Dec 2031Various Locations Sewer Replacement No 30: construction 12 Apr 2027 to 19 Jul 202812 Apr 2027 – 19 Jul 202822 Sep 2025 – 26 Oct 20261 Jul 2026 – 7 Jul 202725 Jun 2028 – 6 Nov 20291 Jan 2029 – 31 Dec 20317 Aug 2026 – 29 Sep 2030

Construction start and end as each department publishes them; a dot where only one is published. 3 other projects on these street segments publish no construction dates.

8 other projects on these street segments