Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Pavement Renovation No 68
0% in published scope
Public Works · Repaving · Construction · Under way, ends 30 Sep 2026
All 3 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- Bright St, Broadmoor Dr, Cargo Way, Holloway Ave, Jennings St, Lake Merced Blvd
- Planned bikeway
- Separated bikeway, 0.26 mi on Jennings St, Holloway Ave
- Would reach
- 259 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 3 street segments that lack one. Closer in: 216 residents with none within about one block (440 feet) today would have one; 224 residents with none within about two blocks (880 feet) today would have one
- Scope
- “1947I”
- Dates
Start End Public consultation not published not published Construction November 2024 Sep 2026 - Sources disagree
- The coordination feed gives construction starting 2024-08-05; Public Works' project page (Start “Winter, 2024”; text “November 2024”), 2024-11, which is shown.
The coordination feed gives construction ending 2026-09-30, which is shown; Public Works' project page (Completion “Spring, 2026”; text “Spring, 2026”) gives 2026-05-31, an end that has passed while the page still gives the job as In progress. - Records
- Public Works project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
- Various Locations Pavement Renovation No.68: Extend contract duration by 50 calendar days18 Feb 2026 · Delegated contract change (Public Works) · Contract change approved by the Director
- Various Locations Pavement Renovation No. 68 - Contract Award11 Mar 2024 · Public Works Commission
4 decisions on the same streets, not naming this project
- Approve and recommend to the Board of Supervisors the conditional termination of certain sewer and water easements encumbering San Francisco Blocks 7332, 7333, 7333A, and 7333B located within Parkmerced near Lake Merced …24 May 2022 · SFPUC Commission · approve Item 14
- Approve an increase of 180 consecutive calendar days to the contract duration contingency for Contract No. WW-696, Cargo Way Flush Line, with JMB Construction, Inc.; and authorize the General Manager to approve future mo…14 Dec 2021 · SFPUC Commission · approve Consent Calendar items 10a through 10g
- Approve an increase of 96 calendar days to the contract duration contingency for Contract No. WW-696, Cargo Way Flush Line; and authorize the General Manager to approve future modifications to the contract for a total co…9 Mar 2021 · SFPUC Commission · approve Consent items 9c, d, f, and h
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Holloway Avenue, north side, from 13 feet to 101 feet east of Arellano Avenue (82-foot station with red zones on either side) (Supervisor District 7)…4 Sep 2020 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.
5 other projects on these street segments
- Various Locations Sewer Replacement No 38Public Works · Design · 3 shared street segments
- Parkmerced ProjectSFMTA · Planning · 1 shared street segment
- Stormwater Trash CapturePublic Works · Design · 1 shared street segment
- PEFWS Pipeline - 36- & 42-inch Welded Steel PipeSFPUC · Design · 1 shared street segment
- Holloway Ave and Lake Merced Blvd Pavement RenovationPublic Works · Planning · 1 shared street segment