Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Tenderloin Traffic Signal Upgrades
Not stated
SFMTA · Bike, walk or safety · Detailed Design · Starts Spring 2027 - Summer 2029, ends 31 Aug 2029
1 of the project's 8 street segments on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA lists it as a bike project, but does not say whether it builds that bikeway.
- Streets
- Dr Carlton B Goodlett Pl, Polk St, Golden Gate Ave, Turk St
- Planned bikeway
- Separated bikeway, 0.74 mi on Dr Carlton B Goodlett Pl, Polk St, Golden Gate Ave, Turk St
- Scope
- “n/a”
- Dates
Start End Public consultation not published not published Construction Spring 2027 - Summer 2029 Aug 2029 - Sources disagree
- The coordination feed gives construction ending 2028-12-31; SFMTA's project page gives 2029-08-31, which is shown.
SFMTA gives the phase as Detailed Design; the coordination feed gives Design. - Records
- SFMTA project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
3 milestones and events from the project's own page
- ConstructionSpring 2027 - Summer 2029 · Project page timeline · Pending
- Solicit Bids from ContractorsFall 2026 - Winter 2026/27 · Project page timeline · Pending
- DesignSpring 2023 - Summer 2026 · Project page timeline · Pending
7 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKESHARE STATION Jones Street, west side, from Sacramento Street to 35 feet northerly (Supervisor District 3) (Approvable by the City Traffic Engineer)12 Jun 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Bush Street, north side, from 5 feet to 58 feet east of Leavenworth Street (Supervisor District 3) (Approvable by the City Traffic Engineer)16 May 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase of 155 calendar days to the duration contingency for Contract No. WW-705, Various Locations Sewer Replacement No. 10, with Mitchell Engineering, for SFPUC DECEMBER 10, 2024 MEETING MINUTES Page 6 of 1…10 Dec 2024 · SFPUC Commission · approve Item 13
- Approve an increase of 90 calendar days to the duration contingency and increase of $200,000 to the amount contingency for Contract No. WW-705, Various Locations Sewer Replacement No. 10, with Mitchell Engineering, for a…25 Jun 2024 · SFPUC Commission
- RESCIND - GENERAL METERED PARKING ESTABLISH - NO PARKING ANYTIME EXCEPT BICYCLES (BIKE CORRAL) Hyde Street, east side, from 69 feet to 91 feet north of Golden Gate Avenue (Supervisor District 6) (Approvable by the City T…1 Oct 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- 12(a). ESTABLISH – CLASS IV BIKEWAY (PROTECTED BIKEWAY) Golden Gate Avenue, eastbound, south side, between Polk Street and Taylor/Market Street 12(b). ESTABLISH – NO TURN ON RED EXCEPT BICYCLES Golden Gate Avenue, eastbo…16 Apr 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. # footnote applies to items #12(d), 12(e), 12(f), 12(g), 12(h) and 12(i).
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Hyde Street, east side, from Post Street to 82 feet southerly (72-foot station with red zones on either side) (Supervisor District 6) Project Contact…4 Sep 2020 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 7 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Tenderloin Traffic Signal UpgradePublic Works · Design · 9 shared street segments
- Various Locations Pavement Renovation No 80 and Sewer ReplacementPublic Works · Construction · 7 shared street segments
- Bikeway HardeningSFMTA · Planning · 6 shared street segments
- Polk Streetscape ProjectSFMTA · Completed · 5 shared street segments
- Turk Street Safety ProjectSFMTA · Completed · 4 shared street segments
- Dr. Carlton B. Goodlett Place Quick-Build ProjectSFMTA · Completed · 4 shared street segments
- Bush St Pavement RenovationPublic Works · Design · 4 shared street segments
- Golden Gate Avenue Quick-BuildSFMTA · Completed · 4 shared street segments
How we built this: About the Data