Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
FASIP Harrison/Treat Box Sewer and Connecting Auxiliary Sewers
0% in published scope
SFPUC · Sewer, water or power · Design · Under way, ends 31 Aug 2029
The project's one street segment on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 17th St, 18th St, Berry St, Florida St, Harrison St, Treat Ave
- Planned bikeway
- Bikeway of undecided type, 0.074 mi on 17th St
- Scope
- “Categorical exemption”
- Dates
Start End Public consultation December 2 December 2 Construction Jan 2026 Aug 2029 - Sources disagree
- The coordination feed gives construction starting 2026-01-01; SFPUC's project page text gives 2023 (“late 2023”).
The coordination feed gives construction ending 2029-08-31; SFPUC's project page text gives 2030 (“2030”).
The start date has passed (2026-01-01) while the phase is still Design, per the coordination feed. - Records
- SFPUC project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
- Award professional services Contract No. PRO.0271, Harrison/Treat Box Sewer Construction Management Staff Augmentation Services, to Jacobs-Avila, a Joint Venture, in the amount not to exceed $4,985,000 and with a duratio…14 Oct 2025 · SFPUC Commission · approve the Consent Calendar
11 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING ANY TIME, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Treat Avenue, west side, from 10 feet to 72 feet north of 23rd Street (62-foot station) (Supervisor District 9) (Approvable by the City Tra…20 Sep 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase in the amount of $2,500,000 to the cost contingency and an increase of 100 calendar days to the duration contingency for Contract No. WW-736, Castro and Mission Districts Sewer Improvements, with Prec…14 May 2024 · SFPUC Commission
- Approving parking and traffic modifications along 17th Street between Potrero Avenue and Mississippi Street to improve transportation safety and connectivity5 Mar 2024 · SFMTA Board · ADOPTED — 7 ayes (Resolution 240305-020)
- Accept work performed by M Squared Construction, Inc., under Contract No. WD-2811, 8- Inch and 16-Inch Ductile Iron Water Main Replacement on 17th Street from Clayton Street to Douglass Street and Various Side Streets; a…9 Jan 2024 · SFPUC Commission · approve items 6a through 6i
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES 18th Street, north side, from 82 feet to 101 feet west of Guerrero Street (Supervisor District 8) (Approvable by the City Traffic Engineer) Jason Hyde, [staff email remove…8 Dec 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – CLASS IV BIKEWAY 17th Street, eastbound and westbound, between Potrero Avenue and Mississippi Street (Approvable by the City Traffic Engineer) 4(b). ESTABLISH – STOP SIGNS 17th Street, eastbound and westbound…1 Sep 2023 · Engineering hearing · Item 4(a) corrected to reflect approvability by the City Traffic Engineer. Item 4(c) updated to TOW AWAY NO STOPPING ANY TIME as originally proposed. Items 4(a) through 4(s) approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- ESTABLISH – NO RIGHT TURN ON RED Harrison Street, westbound, at 7th Street (Supervisor District 6) (Approvable by the City Traffic Engineer) Alison Mathews, [staff email removed — see the order]20 Jan 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Harrison Street, west side, from 9 feet to 66 feet north of 14th Street (Supervisor District 9) (Approvable by the City Traffic Engineer) Laura Stone…21 Oct 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Hearing of persons interested in or objecting to the determination of exemption from environmental review under the California Environmental Quality Act issued as a Statutory Exemption by the Planning Department on June …13 Sep 2021 · Board of Supervisors · Filed without a hearing
- ESTABLISH – CLASS IV PROTECTED BIKEWAY Berry Street, westbound, north side, between 3rd Street and 4th Street 20(b). ESTABLISH – TOW-AWAY, NO STOPPING ANYTIME Berry Street, north side, from 4th Street to 449 feet easterl…21 Feb 2020 · Engineering hearing · Approved by the City Traffic Engineer to send to SFMTA Board for legislation after environmental clearance has been obtained. # comment applies to items 20(c) – 20(f). Public Comments: Comments received in support and opposition.
- ESTABLISH – SPEED TABLES 17th Street, between Market Street and Diamond Street (2 speed tables) 17(b). ESTABLISH – CROSSWALK 17th Street, midblock between Diamond Street and Castro Street 17(c). ESTABLISH – CLASS IV BIKE…18 Oct 2019 · Engineering hearing · Approved by the City Traffic Engineer to send to SFMTA Board for legislation. Public Comments: Comments received in opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.
5 other projects on these street segments
- 7th St, 8th St and Folsom St Pavement RenovationPublic Works · Planning · 4 shared street segments
- Mission District Sewer Rehabilitation (VLLD2B)Public Works · Design · 3 shared street segments
- Slow StreetsSFMTA · Construction · 1 shared street segment
- 16th St, 17th St, and 18th St Pavement RenovationPublic Works · Planning · 1 shared street segment
- Street Resurfacing Program- BBSR Paving FY 26-27Public Works · Construction · 1 shared street segment
How we built this: About the Data