Northern Waterfront Electrical Improvements (NWEI)

0% in published scope

SFPUC · Sewer, water or power · Planning · Under way, ends 31 Dec 2026

5 of the project's 18 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
Beale St, Folsom St, Fremont St, Harrison St, Howard St, Main St
Planned bikeway
Separated bikeway, 3.6 mi on The Embarcadero, Folsom St, Beale St, Howard St
Would reach
No one new would be within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 5 street segments that lack one. Closer in: 0 residents (2020 census), 1 school with none within about one block (440 feet) today would have one
Scope
“The project will expand Power Enterprise’s electrical network by building a new switchyard at sea wall lot 328 and constructing duct banks from PG&E substation to SWL 328 and from SWL 328 to the Downtown Ferry Terminal. A future Phase 2 of this project would construct a new substation at SWL 328 and extend duct banks from SWL 328 to SFPUC switchyard located at Embarcadero/Bay St.”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionApr 2023Dec 2026
Sources disagree
The start date has passed (2023-04-01) while the phase is still Planning, per the coordination feed.
Official source
No SFPUC page for this job, and no closest official source found: SFPUC's sitemap lists no page for the Northern Waterfront Electrical Improvements (read 2026-09-29), and its site search answers only in a browser.
Records
Interagency coordination feed record (DataSF row)

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

27 decisions on the same streets, not naming this project

Construction on these street segments

2023202420252026202720282029todayNorthern Waterfront Electrical Impro…Central Embarcadero Safety ProjectTransbay Howard Streetscape Improvem…Stormwater Trash CaptureStormwater Trash Capture Phase 2Central Embarcadero Safety Project: construction 2026 to 31 Dec 2028Transbay Howard Streetscape Improvement Project: construction 2026 to 31 Dec 2028Stormwater Trash Capture: construction 28 Jun 2027 to 24 Mar 2028Stormwater Trash Capture Phase 2: construction 29 Nov 2027 to 29 Jul 2028Northern Waterfront Electrical Improvements (NWEI): construction 1 Apr 2023 to 31 Dec 20261 Apr 2023 – 31 Dec 20262026 – 31 Dec 20282026 – 31 Dec 202828 Jun 2027 – 24 Mar 202829 Nov 2027 – 29 Jul 2028

Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.

8 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.