Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Northern Waterfront Electrical Improvements (NWEI)
0% in published scope
SFPUC · Sewer, water or power · Planning · Under way, ends 31 Dec 2026
5 of the project's 18 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- Beale St, Folsom St, Fremont St, Harrison St, Howard St, Main St
- Planned bikeway
- Separated bikeway, 3.6 mi on The Embarcadero, Folsom St, Beale St, Howard St
- Would reach
- No one new would be within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 5 street segments that lack one. Closer in: 0 residents (2020 census), 1 school with none within about one block (440 feet) today would have one
- Scope
- “The project will expand Power Enterprise’s electrical network by building a new switchyard at sea wall lot 328 and constructing duct banks from PG&E substation to SWL 328 and from SWL 328 to the Downtown Ferry Terminal. A future Phase 2 of this project would construct a new substation at SWL 328 and extend duct banks from SWL 328 to SFPUC switchyard located at Embarcadero/Bay St.”
- Dates
Start End Public consultation not published not published Construction Apr 2023 Dec 2026 - Sources disagree
- The start date has passed (2023-04-01) while the phase is still Planning, per the coordination feed.
- Official source
- No SFPUC page for this job, and no closest official source found: SFPUC's sitemap lists no page for the Northern Waterfront Electrical Improvements (read 2026-09-29), and its site search answers only in a browser.
- Records
- Interagency coordination feed record (DataSF row)
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
27 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKESHARE STATION Beale Street, east side, from 5 feet to 155 feet south of Howard Street (in hatched area) (Supervisor District 6) (Approvable by the City Traffic Eng…24 Jul 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – SIDEWALK BIKESHARE STATION Main Street, west side, from 56 feet to 109 feet north of Howard Street (Supervisor District 6) (Approvable by the City Traffic Engineer)12 Jun 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Spear Street, east side, from 48 feet to 146 feet south of Howard Street (Supervisor District 6) (Approvable by the City Traffic Engineer)16 Jan 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, north side, from 30 feet to 125 feet west of 1st Street (Supervisor District 6) (Approvable by the City Traffic Engineer)14 Nov 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- RESCIND – YELLOW METERED ZONE, COMMERCIAL LOADING, 30-MINUTE TIME LIMIT, 7 AM TO 6 PM, MONDAY THROUGH FRIDAY ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Spear Street, east side, from 164 feet …11 Jul 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Award Contract No. WW-757R, Laguna, Howard, and Mission Creek Combined Sewer Discharge Improvements, to the responsible bidder that submitted the lowest responsive bid, Pullman SST, Inc., in the amount of $7,296,786, wit…13 May 2025 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, west side, from 35 feet to 87 feet north of 21st Street (52-foot station) (Supervisor District 9) (Approvable by the City Traffic Eng…7 Mar 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Main Street, west side, from 70 feet to 140 feet south of Market Street (Supervisor District 6) (Approvable by the City Traffic Engineer)7 Feb 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – BLUE ZONE Folsom Street, south side, from 9 feet to 31 feet east of Mabini Street Folsom Street, south side, from 7 feet to 29 feet east of Hawthorne Street 10(b). ESTABLISH – METERED YELLOW ZONE, COMMERCIAL …2 Aug 2024 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- Approving Class IV protected bikeway on Howard Street between The Embarcadero and 4th Street; and approving various traffic and parking modifications ESTABLISH – LEFT LANE MUST TURN LEFT – Howard Street, westbound, from …16 Apr 2024 · SFMTA Board · ADOPTED — 7 ayes (Resolution 240416-044)
- RESCIND – NO STOPPING, EXCEPT BICYCLES RESCIND – BIKE SHARE STATION Folsom Street, north side, from 105 feet to 185 feet west of Main Street (80-foot bike share station) 12(b). ESTABLISH – NO STOPPING, EXCEPT BICYCLES ES…8 Mar 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- RESCIND – CLASS IV BIKEWAY (PARKING PROTECTED BIKEWAY) Howard Street, westbound, north side, between The Embarcadero and 4th Street (curbside bike lane with buffer and floating parking) 12(b). ESTABLISH – CLASS IV BIKEWA…2 Feb 2024 · Engineering hearing · Noted approval path. Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- ESTABLISH - NO PARKING ANY TIME, EXCEPT BICYCLES Howard Street, south side, from 45 feet to 66 feet east of 2nd Street (Supervisor District 6) (Approvable by the City Traffic Engineer) Jason Hyde, [staff email removed — …19 May 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Accept work performed by D’Arcy & Harty Construction, Inc for Contract No. WW-712, New Montgomery, Jessie, Minna, and Mission Street Brick Sewer Rehabilitation, for a total contract amount of $6,891,778, and with a total…9 May 2023 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – CLASS IV BIKEWAY (PARKING PROTECTED BIKEWAY) Main Street, northbound, east side, from Folsom Street to Market Street 12(b). ESTABLISH – NO RIGHT TURN ON RED, EXCEPT BICYCLES A. Main Street, northbound, at How…17 Feb 2023 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- ESTABLISH – NO RIGHT TURN ON RED Harrison Street, westbound, at 7th Street (Supervisor District 6) (Approvable by the City Traffic Engineer) Alison Mathews, [staff email removed — see the order]20 Jan 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Harrison Street, west side, from 9 feet to 66 feet north of 14th Street (Supervisor District 9) (Approvable by the City Traffic Engineer) Laura Stone…21 Oct 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Howard Street, north side, from 19 feet to 54 feet east of Grace Street (35-foot bike share station in floating parking lane) (Supervisor District 6)…4 Mar 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Approve an increase of $2,250,000 to the contract cost contingency, and an increase of 180 consecutive calendar days to the contract duration contingency for Contract No. WW-712, New Montgomery, Jessie, Minna, and Missio…8 Feb 2022 · SFPUC Commission · approve Item 10
- Approve an increase of 30 consecutive calendar days to the contract duration contingency for Contract No. WW-703, Mission Street, 16th to Cesar Chavez Street, Brick Sewer Rehabilitation; and authorize the General Manager…14 Dec 2021 · SFPUC Commission · approve Consent Calendar items 10a through 10g
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, north side, from 106 feet to 186 feet west of Main Street (73-foot bike share station with space on either end) 20(b). RESCIND – YELLO…5 Nov 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Approve the plans and specifications, and award Contract No. WW-712, New Montgomery, Jessie, Minna, and Mission Streets Brick Sewer Rehabilitation, in the amount of $4,888,750, and with a duration of 390 consecutive cale…11 May 2021 · SFPUC Commission · approve Consent Calendar items 8c, 8d, and 8g
- Approving the following traffic modifications 102 A. ESTABLISH –TOW-AWAY, NO PARKING ANYTIME –Howard Street, north side, from Beale Street to 51 feet westerly5 Jan 2021 · SFMTA Board · ADOPTED — 5 ayes (Resolution 210105-002)
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, south side, from 183 feet to 250 feet west of 2nd Street (66-foot bike share station) (Supervisor District 6) Pallavi Panyam, [staff e…16 Oct 2020 · Engineering hearing · Approved by the City Traffic Engineer for implementation. The Environmental Review citation, Case 2015-005492ENV, is accurate since temporary station installation and/or relocation are included in the bike share system.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Howard Street, north side, from 165 feet to 239 feet east of 6th Street (74-foot bike share station) (Supervisor District 6) Project Contact: Laura S…12 Jun 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: No comments received.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, south side, from 41 feet to 92 feet west of 7th Street (51-foot bike share station in the floating parking lane) (Supervisor District …15 Nov 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
- TWO-WAY PROTECTED BIKEWAY AND TRANSIT-ONLY LANE ESTABLISH – MUNI AND GOLDEN GATE TRANSIT ONLY LANE Beale Street, southbound, from Market Street to Natoma Street (converts general purpose lane from Market to Mission and r…13 Sep 2019 · Engineering hearing · Approved by City Traffic Engineer to send to SFMTA Board for legislation after environmental clearance has been obtained. Public Comments: Comments received in support.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- SF Bay Ferry Downtown Ferry Terminal Electrification Projectother · Design · 43 shared street segments
- Central Embarcadero Safety ProjectSFMTA · 10 shared street segments
- Stormwater Trash CapturePublic Works · Design · 9 shared street segments
- Transbay Howard Streetscape Improvement ProjectSFMTA · Implementation / Construction · 7 shared street segments
- Stormwater Trash Capture Phase 2Public Works · Planning · 5 shared street segments
- Train Control Upgrade Project - Phase 1Public Works · Design · 5 shared street segments
- The Embarcadero 2020 Quick-Build ProjectsSFMTA · Project Evaluation · 5 shared street segments
- Mission Street Safety Improvements ProjectPublic Works · Design · 5 shared street segments
How we built this: About the Data