Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

Various Locations Sewer Replacement No 36

0% in published scope

Public Works · Sewer, water or power · Design · Starts 30 Jan 2028, ends 1 Apr 2029

Early enough to change: Public Works gives its phase as Design. No meeting on it is posted for the next 60 days.

The project's one street segment on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
17th St, Alma St, Aquavista Way, Belvedere St, Beulah St, Bigler Ave
Planned bikeway
Bikeway of undecided type, 0.32 mi on Clarendon Ave
Would reach
3,030 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's street segment that lack one. Closer in: 1,249 residents with none within about one block (440 feet) today would have one; 1,255 residents with none within about two blocks (880 feet) today would have one
Scope
“2689i”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionJan 2028Apr 2029
Records
Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

7 decisions on the same streets, not naming this project

Construction on these street segments

202520262027202820292030todayVarious Locations Sewer Replacement …PW Various Locations Sewer Replaceme…Various Locations Pavement Renovatio…Various Locations Pavement Renovatio…Various Location Sewer Replacement N…Street Resurfacing Program-BBSR Pavi…PW Various Locations Sewer Replacement No 18: construction 25 Jun 2025 to 26 Oct 2026Various Locations Pavement Renovation No 69: construction Oct 2025 to 12 Oct 2027Various Locations Pavement Renovation No 85: construction Jul 2026 to 31 May 2027Various Location Sewer Replacement No 22: construction 24 Aug 2026 to 24 Aug 2027Street Resurfacing Program-BBSR Paving FY 27-28: construction 1 Jul 2027 to 30 Jun 2028Various Locations Sewer Replacement No 36: construction 30 Jan 2028 to 1 Apr 202925 Jun 2025 – 26 Oct 2026Oct 2025 – 12 Oct 2027Jul 2026 – 31 May 202724 Aug 2026 – 24 Aug 202730 Jan 2028 – 1 Apr 20291 Jul 2027 – 30 Jun 2028

Construction start and end as each department publishes them; a dot where only one is published. 3 other projects on these street segments publish no construction dates.

8 other projects on these street segments