Bayview Community Pathway
Not stated
SFMTA · Bike, walk or safety · Planning · Starts 2028, ends 31 Dec 2028
16 of the project's 18 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA lists it as a bike project, but does not say whether it builds that bikeway.
- Streets
- Cargo Way, Mendell St, Keith St, Underwood Ave, Carroll Ave, Lane St
- Planned bikeway
- Separated bikeway, 2 mi on Cargo Way
Shared street, 1.9 mi on Mendell St, Keith St, Underwood Ave, Carroll Ave - Would reach
- 5,277 residents (2020 census), 2 schools would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 16 street segments that lack one. Closer in: 5,570 residents with none within about one block (440 feet) today would have one; 7,839 residents with none within about two blocks (880 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation not published October 17, 2026 Construction 2028 2028 - Not yet checked
- The latest public consultation shown, 2026-10-17, was read from the words “October 17, 2026” on SFMTA's project page by a model, and a person has not confirmed it.
- Records
- SFMTA project page
City decisions naming this project
- Approving various traffic and parking modifications to improve safety for people walking, bicycling, and riding transit near Third Street as part of the Bayview Community Pathway project Approving various traffic and par…2 Dec 2025 · SFMTA Board · ADOPTED — 7 ayes (Resolution 251202-117)
- Approving various traffic and parking modifications to improve safety for people walking, bicycling, and riding transit near Third Street as part of the Bayview Community Pathway project Approving various traffic and par…4 Nov 2025 · SFMTA Board · ADOPTED — 5 ayes, 2 nays
7 milestones and events from the project's own page
- Construction2028 · Project page timeline · Pending
- District 10 Health Fest: Bayview in Motion17 Oct 2026 · Project page event
- Board of Directors Meeting, November 4, 20254 Nov 2025 · Project page event
- Education and Encouragement2025-2028 · Project page timeline · Pending
- Planning and Design2024-2026 · Project page timeline · Pending
- Project Proposal and Grant Application2022 · Project page timeline · Pending
- Bayview Community-Based Transportation Plan2018-2020 · Project page timeline · Pending
7 decisions on the same streets, not naming this project
- Approve an increase of 180 consecutive calendar days to the contract duration contingency for Contract No. WW-696, Cargo Way Flush Line, with JMB Construction, Inc.; and authorize the General Manager to approve future mo…14 Dec 2021 · SFPUC Commission · approve Consent Calendar items 10a through 10g
- ESTABLISH - NO PARKING ANYTIME EXCEPT BICYCLES 3rd Street, east side, from 390 feet to 420 feet north of 23rd Street (Supervisor District 10) (Approvable by the City Traffic Engineer) Pallavi Panyam, [staff email removed…4 Jun 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Approve an increase of 96 calendar days to the contract duration contingency for Contract No. WW-696, Cargo Way Flush Line; and authorize the General Manager to approve future modifications to the contract for a total co…9 Mar 2021 · SFPUC Commission · approve Consent items 9c, d, f, and h
- RESCIND - GENERAL METER PARKING, 1-HOUR TIME LIMIT, 9 AM TO 6 PM, MONDAY THROUGH SATURDAY 3rd St, west side, from 82 feet south to 102 feet south of Bayview Ave Sustainable Streets Division 10(b). ESTABLISH - NO PARKING …12 Jun 2020 · Engineering hearing · On hold pending further community outreach. Public Comments: Comments received in support and opposition.
- Ordinance ordering the street vacation of the entirety of Seawall Lot 337 (located east of Third Street between China Basin Channel and Mission Rock Street, including China Basin Park) and portions of Terry A. Francois B…10 Sep 2019 · Board of Supervisors · Passed
- Hearing of the Board of Supervisors sitting as a Committee of the Whole on September 3, 2019, at 3:00 p.m., to hold a public hearing to consider the proposed Ordinance (File No. 190654) ordering the street vacation of th…3 Sep 2019 · Board of Supervisors · Filed
- Resolution declaring the intent of the Board of Supervisors to order the street vacation for the entirety of Seawall Lot 337 (located east of Third Street between China Basin Channel and Mission Rock Street, including Ch…16 Jul 2019 · Board of Supervisors · Passed
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published.
8 other projects on these street segments
- Bayview Community Based Transportation PlanSFMTA · Planning · 35 shared street segments
- Bayview Multimodal ProjectPublic Works · Design · 18 shared street segments
- WD-2937 2425-003: 8-inch Ductile Iron Water Main Replacement on Underwood, Thomas, and Shafter Aves from 3rd St to Griffith StSFPUC · Design · 5 shared street segments
- PW StreetResurfacingPro-BBSR Pavement Prese FY 26-27Public Works · Construction · 3 shared street segments
- Various Locations Sewer Replacement No 39Public Works · Design · 2 shared street segments
- Various Locations Pavement Renovation No 82Public Works · Design · 2 shared street segments
- WD-2921 8- and 12-inch Ductile Iron Water Main Replacement on Palou, Quesada, and Revere Ave from 3rd St to Griffith StSFPUC · Construction · 1 shared street segment
- 8 & 12-Inch Ductile Iron Water Main Replacement on Palou, Quesada and Revere From 3rd St to Griffith StPublic Works · Construction · 1 shared street segment
6 documents on the project page
- Bayview Pathway - Fact Sheet (Winter/Spring 2026)
- Proposed Design - Bayview Community Pathway
- Bayview Corridor Fact Sheet (Spring 2024) (PDF)
- Bayview Community Pathway Engagement Pop-up Flyer 11/20/25
- Bayview Transportation Open House, Oct 2025
- Bayview Community Pathway: SFMTA Board of Directors and Public Hearing