SF WorksMobility Improving The Bike Network Improving The Bike NetworkSafer School Trips Current Repaving Projects Other Bike PlansCurrent Repaving Projects

Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

Various Locations Sewer Replacement No 24

0% in published scope

Public Works · Sewer, water or power · Design · Starts 25 Mar 2027, ends 26 Mar 2028

Early enough to change: Public Works gives its phase as Design. No meeting on it is posted for the next 60 days.

The project's one street segment on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
15th Ave, 18th Ave, 20th St, 21st St, 25th St, 33rd Ave
Planned bikeway
Shared street, 0.11 mi on Mendell St
Would reach
488 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's street segment that lack one. Closer in: 1,088 residents with none within about one block (440 feet) today would have one; 1,497 residents with none within about two blocks (880 feet) today would have one
Scope
“2504i, WW-771”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionMar 2027Mar 2028
Records
Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

4 decisions on the same streets, not naming this project

Construction on these street segments

20222024202620282030203220342036todayVarious Locations Sewer Replacement …Bayview Community Based Transportati…PW As Needed Spot Sewer Replacement …WD-2921 8- and 12-inch Ductile Iron …8 & 12-Inch Ductile Iron Water Main …Bayview Multimodal ProjectVarious Locations Pavement Renovatio…PW As Needed Spot Sewer Replacement No 47: construction 22 Sep 2025 to 26 Oct 2026WD-2921 8- and 12-inch Ductile Iron Water Main Replacement on Palou, Quesada, and Revere Ave from 3rd St to Griffith St: construction 1 Apr 2026 to 1 Apr 20288 & 12-Inch Ductile Iron Water Main Replacement on Palou, Quesada and Revere From 3rd St to Griffith St: construction 6 Apr 2026 to 4 Apr 2028Bayview Multimodal Project: construction 30 Jun 2027 to 31 Dec 2028Various Locations Pavement Renovation No 105: construction 28 Oct 2033 to 11 Jan 2035Bayview Community Based Transportation Plan: construction 2022 to end not publishedVarious Locations Sewer Replacement No 24: construction 25 Mar 2027 to 26 Mar 202825 Mar 2027 – 26 Mar 2028from 202222 Sep 2025 – 26 Oct 20261 Apr 2026 – 1 Apr 20286 Apr 2026 – 4 Apr 202830 Jun 2027 – 31 Dec 202828 Oct 2033 – 11 Jan 2035

Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.

8 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.