Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Sewer Replacement No 24
0% in published scope
Public Works · Sewer, water or power · Design · Starts 25 Mar 2027, ends 26 Mar 2028
The project's one street segment on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 15th Ave, 18th Ave, 20th St, 21st St, 25th St, 33rd Ave
- Planned bikeway
- Shared street, 0.11 mi on Mendell St
- Would reach
- 488 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's street segment that lack one. Closer in: 1,088 residents with none within about one block (440 feet) today would have one; 1,497 residents with none within about two blocks (880 feet) today would have one
- Scope
- “2504i, WW-771”
- Dates
Start End Public consultation not published not published Construction Mar 2027 Mar 2028 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
4 decisions on the same streets, not naming this project
- Approve an increase in the amount of $450,000 to the cost contingency and an increase of 60 calendar days to the duration contingency for Contract No. WD-2843, 16-, 12-, and 8-Inch Ductile Iron Water Main Replacement on …14 May 2024 · SFPUC Commission
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 15th Avenue, north side, from 5 feet to 67 feet west of Portola Drive (62-foot bike share station) (Supervisor District 7) (Approvable by the City T…22 Mar 2024 · Engineering hearing · Item withdrawn.
- ESTABLISH – RED ZONE A. 25th Street, south side, from Connecticut Street to 29 feet easterly (removes 1 parking space) B. 25th Street, south side, from 184 feet to 306 feet east of Connecticut Street (removes 6 parking s…8 Jul 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation. # (only 16(b) is reviewable by BOS)
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 18th Avenue, west side, from 241 feet to 310 feet north of California Street (62-foot bike share station with red zones on either side) (Supervisor D…21 Feb 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Bayview Community Based Transportation PlanSFMTA · Planning · 3 shared street segments
- 8 & 12-Inch Ductile Iron Water Main Replacement on Palou, Quesada and Revere From 3rd St to Griffith StPublic Works · Construction · 3 shared street segments
- WD-2921 8- and 12-inch Ductile Iron Water Main Replacement on Palou, Quesada, and Revere Ave from 3rd St to Griffith StSFPUC · Construction · 3 shared street segments
- Bayview Multimodal ProjectPublic Works · Design · 2 shared street segments
- District 11-Wide Traffic Calming ProjectSFMTA · 2 shared street segments
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 2 shared street segments
- Various Locations Pavement Renovation No 105Public Works · Planning · 1 shared street segment
- 21st Street Water Main Replacement ProjectSFPUC · Bid & Award · 1 shared street segment