Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Sewer Replacement No 26
Already built
Public Works · Sewer, water or power · Design · Starts 31 Aug 2027, ends 30 Aug 2028
The project's one street segment on a planned bikeway street already has an all-ages bikeway.
- Streets
- Alemany Blvd, Athens St, Belle Ave, Brazil Ave, Brighton Ave, Caine Ave
- Planned bikeway
- Shared street, 0.064 mi on Holloway Ave
- Scope
- “2506i, WW-773”
- Dates
Start End Public consultation not published not published Construction Aug 2027 Aug 2028 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
6 decisions on the same streets, not naming this project
- RESCIND – CLASS II BIKEWAY Alemany Boulevard, westbound, from Congdon Street to 520 feet easterly (on freeway overpass) (Requires approval by the SFMTA Board) 35(b). ESTABLISH – CLASS IV PROTECTED BIKEWAY Alemany Bouleva…8 Nov 2024 · Engineering hearing · Clarified approval path, location of 35(a), and 35(b) is a reclassification of an existing Class II facility to a Class IV facility. Items 35(b), 35(c) and 35(d) approved by the City Traffic Engineer for implementation. Item 35(a) approved by the City Traffic Engineer to forward to the SFMTA Board f
- ESTABLISH - NO STOPPING EXCEPT BICYCLES ESTABLISH - BIKE SHARE STATION Brighton Avenue, east side, from 11 feet to 68 feet south of Ocean Avenue (53-foot station with red zones either side) (Supervisor District 7) Daniel…19 Mar 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH - CLASS IV BIKEWAY (TWO-WAY PROTECTED) Alemany Boulevard from Stoneybrook Ave/Cambridge Ave to Crescent Ave/Putnam Ave Installed a concrete barrier to protect the existing bikeway on Alemany Boulevard between S…8 Jan 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Alemany Boulevard, east side, from 53 feet to 122 feet south of Francis Street (62-foot bike share station with red zones on either end) (Supervisor …12 Jun 2020 · Engineering hearing · On hold at the request of the District 11 Supervisor. Public Comments: Comments received in support and opposition.
- Resolution approving the First Amendment to the Freeway Maintenance Agreement between the City and County of San Francisco and the California Department of Transportation, to include City's maintenance of bicycle lanes a…9 Jun 2020 · Board of Supervisors · Passed
- ESTABLISH – NO PARKING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Alemany Boulevard, north side, from 100.5 feet to 159.5 feet east of Silver Avenue (52’-5” bike share station with red zones on end of the station) (S…6 Dec 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- District 11-Wide Traffic Calming ProjectSFMTA · 24 shared street segments
- Excelsior Neighborhood Traffic Calming ProjectSFMTA · Completed · 9 shared street segments
- PW StreetResurfacingPro-BBSR Pavement Prese FY 26-27Public Works · Construction · 2 shared street segments
- PW - M & J Lines - Muni Forward ProjectPublic Works · Design · 1 shared street segment
- M Ocean View Transit and Safety ProjectSFMTA · Quick-Build Implementation and Detailed Design · 1 shared street segment
- As Needed City-wide Pavement Preservation 6 (General As-Needed Contract G29)Public Works · Construction · 1 shared street segment
- Various Locations Sewer Replacement No 38Public Works · Design · 1 shared street segment
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 1 shared street segment
How we built this: About the Data