Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Pavement Renovation No 86B
Already built
Public Works · Repaving · Planning · Starts 30 Oct 2030, ends 12 Jan 2032
All 2 of the project's street segments on planned bikeway streets already have an all-ages bikeway.
- Streets
- Bay St, Beach St, Card Aly, Edgardo Pl, Edith St, Fisher Aly
- Planned bikeway
- Separated bikeway, 0.36 mi on Beach St
- Scope
- None published.
- Dates
Start End Public consultation not published not published Construction Oct 2030 Jan 2032 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
6 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKESHARE STATION Beach Street, north side, from Divisadero Street to 20 feet easterly (in existing red zone) Divisadero Street, east side, from Beach Street to 21 fee…24 Jul 2026 · Engineering hearing · On hold.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Taylor Street, west side, from 5 feet to 58 feet north of Sacramento Street (Supervisor District 3) (Approvable by the City Traffic Engineer)16 May 2025 · Engineering hearing · Item on hold.
- Approving various parking and traffic modifications along Beach Street between Van Ness Avenue and The Embarcadero to improve transportation safety and connectivity17 Dec 2024 · SFMTA Board · ADOPTED — 6 ayes (Resolution 241217-146)
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION North Point Street, north side, from 10 feet to 95 feet east of Taylor Street (Supervisor District 3) (Approvable by the City Traffic Engineer) Laura…3 Feb 2023 · Engineering hearing · Held pending the outcome of further stakeholder discussion.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION North Point Street, north side, from 141 feet to 225 feet east of Powell Street (75-foot bike share station with red zones on either side) (Approvabl…18 Jun 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION North Point Street, north side, from 4.5 feet to 61 feet west of Grant Avenue (53-foot bike share station with red zones at either end) (Supervisor D…7 Feb 2020 · Engineering hearing · On hold for further discussions with Fisherman’s Wharf Community Benefit District and bike rental companies. Public Comments: Comments received in opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.
7 other projects on these street segments
- Various Locations Sewer Replacement No 29Public Works · Design · 3 shared street segments
- Various Locations Sewer Replacement No 35Public Works · Design · 3 shared street segments
- PW StreetResurfacingPro-BBSR Pavement Prese FY 26-27Public Works · Construction · 1 shared street segment
- Beach Street Quick-Build ProjectSFMTA · Implementation / Construction · 1 shared street segment
- Chinatown and SOMA Large Diameter Sewer ImprovementsPublic Works · Design · 1 shared street segment
- PW Various Locations Sewer Replacement No 13Public Works · Construction · 1 shared street segment
- PW Various Locations Sewer Replacement (JV VL PR No 71)Public Works · Construction · 1 shared street segment
How we built this: About the Data