Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
13th Street Safety Project
Builds 79%
SFMTA with Public Works · Bike, walk or safety · Implementation / Construction · Under way, ends 31 Dec 2026
10 of the project's 15 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA's bikeway layer and project page show it building or upgrading 0.76 mi of the plan's bikeway.
- Streets
- 13th St, Duboce Ave, Valencia St, Folsom St
- Planned bikeway
- Separated bikeway, 1.5 mi on 13th St, Duboce Ave, Valencia St, Folsom St
- Would reach
- No one new would be within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 10 street segments that lack one. Closer in: 2 residents (2020 census) with none within about one block (440 feet) today would have one
- Scope
- “Installation of new bulbouts, sidewalk, traffic signals and bike lanes”
- Dates
Start End Public consultation 2022-04-18 – 2022-04-30 2022-04-18 – 2022-04-30 Construction Feb 2025 Dec 2026 - Sources disagree
- SFMTA's project page gives construction starting 2025, a stage it still marks Pending; the coordination feed gives 2025-02-03, which is shown.
The coordination feed gives construction ending 2026-11-14; SFMTA's project page gives 2026-12-31, which is shown.
Public Works' page gives its status as In progress; SFMTA's project layer gives Implementation / Construction.
SFMTA gives the phase as Implementation / Construction; the coordination feed gives Construction. - Records
- SFMTA project page · Public Works project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
- Authorizing the SFMTA, through its Director of Transportation (or designee), to accept and expend up to $942,286 in Fiscal Years 2024 and 2025 Transportation Development Act (TDA) Article 3 funds for the 13th Street Safe…3 Dec 2024 · SFMTA Board · ADOPTED — 6 ayes (Resolution 241203-136)
- 13th Street Safety Improvement Project – Contract Award Staff Recommendation: Award 13th Street Safety Improvement Project, Sourcing Event ID No. 0000007339, to NTK Construction, Inc in the amount of $8,976,980.00 with $…17 Oct 2024 · Public Works Commission
- Parking and traffic modifications associated with the 13th Street Safety Project: Items 11A through 11S ESTABLISH - NO TURN ON RED, EXCEPT BICYCLES - Duboce Avenue18 Oct 2022 · SFMTA Board · ADOPTED — 5 ayes (Resolution 221018-097)
- ESTABLISH – CLASS IV BIKEWAY (PARKING PROTECTED BIKEWAY) A. Duboce Avenue, westbound, north side, between Valencia Street and Otis Street B. Duboce Avenue, eastbound, south side, between Valencia Street and Mission Stree…19 Aug 2022 · Engineering hearing · Revised approval path. Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
9 milestones and events from the project's own page
- Construction2025 - 2026 · Project page timeline · Pending
- Board of Directors meeting, October 18, 202218 Oct 2022 · Project page event
- Public Hearing Notice: SFMTA Board of Directors Meeting, October 18, 20228 Oct 2022 · Project page notice
- Legislation & Environmental ReviewFall 2022 · Project page timeline · Pending
- Engineering Public Hearing Meeting, August 19, 202219 Aug 2022 · Project page notice
- Engineering Public Hearing Meeting, August 19, 202219 Aug 2022 · Project page event
- 13th Street Safety Project Virtual Open House18 Apr 2022 · Project page event
- Detailed DesignWinter 2022 to Spring 2024 · Project page timeline · Pending
- Planning & Conceptual DesignFall 2021 to Spring 2022 · Project page timeline · Pending
33 decisions on the same streets, not naming this project
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Valencia Street, east side, from 175 feet to 195 feet south of 21st Street (for 20-foot corral) (Supervisor District 9) (Approvable by the City Traffic Engineer) Grant Bro…4 Sep 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, north side, from 30 feet to 125 feet west of 1st Street (Supervisor District 6) (Approvable by the City Traffic Engineer)14 Nov 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approving revisions to the side-running protected bikeway and parking and traffic modifications on Valencia Street between 15th and 23rd streets Approving revisions to the side-running protected bikeway and parking and t…15 Apr 2025 · SFMTA Board · ADOPTED — 7 ayes (Resolution 250415-036)
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, west side, from 35 feet to 87 feet north of 21st Street (52-foot station) (Supervisor District 9) (Approvable by the City Traffic Eng…7 Mar 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING ANY TIME, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION A. Valencia Street, west side, from 90 feet to 149 feet south of 18th Street (59-foot bike share station) B. Valencia Street, west side, fr…7 Feb 2025 · Engineering hearing · Revised description. Approved by the City Traffic Engineer for implementation.
- Hearing of persons interested in or objecting to the Statutory Exemption determination by the Planning Department under the California Environmental Quality Act issued on November 4, 2024, for the proposed Municipal Tran…28 Jan 2025 · Board of Supervisors · Filed
- Approving a side-running protected bikeway and parking and traffic modifications on Valencia Street between 15th and 23rd streets and side streets, as set forth in Items A through NN, to improve safety for all modes of t…19 Nov 2024 · SFMTA Board · ADOPTED — 6 ayes (Resolution 241119-129)
- ESTABLISH – BLUE ZONE Folsom Street, south side, from 9 feet to 31 feet east of Mabini Street Folsom Street, south side, from 7 feet to 29 feet east of Hawthorne Street 10(b). ESTABLISH – METERED YELLOW ZONE, COMMERCIAL …2 Aug 2024 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- Receiving an update on the Valencia Bikeway Project, also known as the Mid-Valencia Bikeway Pilot, which seeks to improve safety, preserve economic vitality, and ensure movement and access of goods and people on Valencia…18 Jun 2024 · SFMTA Board · ADOPTED — 5 ayes (Resolution 240618-071)
- ESTABLISH – NO PARKING ANYTIME EXCEPT BICYCLES Mission Street, west side, from 47 feet to 60 feet south of 21st Street (removes General Metered Parking Space #2506) (Supervisor District 9) (Approvable by the City Traffic…22 Mar 2024 · Engineering hearing · Item withdrawn by staff.
- RESCIND – NO STOPPING, EXCEPT BICYCLES RESCIND – BIKE SHARE STATION Folsom Street, north side, from 105 feet to 185 feet west of Main Street (80-foot bike share station) 12(b). ESTABLISH – NO STOPPING, EXCEPT BICYCLES ES…8 Mar 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Valencia Street, east side, from 60 feet to 119 feet north of the northern crosswalk at Duncan Street (59-foot bike share station) (Supervisor Distri…2 Feb 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase of $215,000 to the contract cost contingency and an increase of 50 calendar days to the contract duration contingency for Contract No. WW-707R, Various Locations Sewer Replacement No. 11, with Basset …26 Sep 2023 · SFPUC Commission · approve the Consent Calendar
- Accept work performed by D’Arcy & Harty Construction, Inc for Contract No. WW-712, New Montgomery, Jessie, Minna, and Mission Street Brick Sewer Rehabilitation, for a total contract amount of $6,891,778, and with a total…9 May 2023 · SFPUC Commission · approve the Consent Calendar
- Approving a center-running protected bikeway and traffic modifications using reversible and/or adjustable elements and curb regulations to provide more access for people and goods on Valencia Street between 15th and 23rd…4 Apr 2023 · SFMTA Board · ADOPTED — 6 ayes (Resolution 230404-029)
- RESCIND – NO PARKING ANY TIME EXCEPT BICYCLES ESTABLISH – GENERAL METERED PARKING Mission Street, west side, from 3 feet to 24 feet south of Kingston Street (restore parking meter #3424) 8(b). ESTABLISH – NO PARKING ANY …17 Feb 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH - RESIDENTIAL PERMIT PARKING AREA I (Eligibility only, no signs) 2812-2814 Mission Street (Supervisor District 9) (Requires approval by the SFMTA Board) Gerry Porras, [staff email removed — see the order] This …19 Aug 2022 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- Approving various routine parking and traffic modifications on Valencia Street, Mission Street, 26th Street, Oakdale Avenue, Kimball Place, and Spear Street2 Aug 2022 · SFMTA Board · ADOPTED — 4 ayes (Resolution 220802-074)
- Approve an increase of $2,250,000 to the contract cost contingency, and an increase of 180 consecutive calendar days to the contract duration contingency for Contract No. WW-712, New Montgomery, Jessie, Minna, and Missio…8 Feb 2022 · SFPUC Commission · approve Item 10
- ESTABLISH – NO RIGHT TURN ON RED, EXCEPT BICYCLES Duboce Avenue, eastbound, at Valencia Street (Supervisor District 6) (Approvable by the City Traffic Engineer) Winnie Lee, [staff email removed — see the order]4 Feb 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Approve an increase of 30 consecutive calendar days to the contract duration contingency for Contract No. WW-703, Mission Street, 16th to Cesar Chavez Street, Brick Sewer Rehabilitation; and authorize the General Manager…14 Dec 2021 · SFPUC Commission · approve Consent Calendar items 10a through 10g
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, north side, from 106 feet to 186 feet west of Main Street (73-foot bike share station with space on either end) 20(b). RESCIND – YELLO…5 Nov 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- RESCIND – GENERAL METERED PARKING ESTABLISH – NO PARKING ANYTIME EXCEPT BICYCLES (BIKE CORRAL) Valencia Street, west side, from 10 feet to 30 feet north of 19th Street (removes general metered space #770) (Approvable by …3 Sep 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Approve the plans and specifications, and award Contract No. WW-712, New Montgomery, Jessie, Minna, and Mission Streets Brick Sewer Rehabilitation, in the amount of $4,888,750, and with a duration of 390 consecutive cale…11 May 2021 · SFPUC Commission · approve Consent Calendar items 8c, 8d, and 8g
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, south side, from 183 feet to 250 feet west of 2nd Street (66-foot bike share station) (Supervisor District 6) Pallavi Panyam, [staff e…16 Oct 2020 · Engineering hearing · Approved by the City Traffic Engineer for implementation. The Environmental Review citation, Case 2015-005492ENV, is accurate since temporary station installation and/or relocation are included in the bike share system.
- Approving a parking protected bikeway and parking and traffic modifications, along Valencia Street between Market and 15th streets as part of the Valencia Street Improvement Project as follows Approving a parking protect…16 Jun 2020 · SFMTA Board · ADOPTED — 4 ayes
- Ordinance ordering the vacation of the sidewalk portion of streets on the south side of Mission Street at the intersection of Mission and Fremont Streets and on the east side of Fremont Street at the same intersection to…10 Mar 2020 · Board of Supervisors · Passed
- Hearing of the Board of Supervisors sitting as a Committee of the Whole on March 3, 2020, at 3:00 p.m., to hold a public hearing to consider the proposed Ordinance (File No. 191253) ordering the vacation of the sidewalk …3 Mar 2020 · Board of Supervisors · Filed
- ESTABLISH – CLASS IV BIKEWAY (PARKING PROTECTED BIKEWAY) Division Street, eastbound, south side, between San Bruno Avenue and Vermont Street (curbside bike lane with buffer and floating parking) Division Street, westboun…21 Feb 2020 · Engineering hearing · Approved by the City Traffic Engineer to send to SFMTA Board for legislation. # footnote applies to item 12(c). Public Comments: No comments received.
- ESTABLISH – TOW-AWAY, NO STOPPING ANYTIME Townsend Street, south side, from 3rd Street to 209 feet westerly (removes 5 general meter parking spaces) 26(b). ESTABLISH – CLASS IV BIKEWAY (PROTECTED BIKEWAY) Townsend Street…24 Jan 2020 · Engineering hearing · Approved by the City Traffic Engineer to send to send items 26(a) through 26(f) to the SFMTA Board for legislation. 26(g) and 26(h) amended as underlined per follow-up with public hearing attendees and approved by the City Traffic Engineer for implementation. # note applies to item 26(g). Public Com
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, south side, from 41 feet to 92 feet west of 7th Street (51-foot bike share station in the floating parking lane) (Supervisor District …15 Nov 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
- Approving various parking and traffic modifications along Mission Street associated with the Mission Street Excelsior Safety Project17 Sep 2019 · SFMTA Board · ADOPTED — 5 ayes
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Townsend Street, north side, from 27 feet 124 feet west of 5th Street (expanding existing bike share station to the west by 15 feet) ♦ 11(b). ESTABLI…13 Sep 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: One comment in opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 6 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Division/13th Street Safety ProjectSFMTA · Completed · 9 shared street segments
- Bikeway HardeningSFMTA · Planning · 5 shared street segments
- Better Market StreetSFMTA · Current · 3 shared street segments
- 11th Street Improvement ProjectSFMTA · Completed · 3 shared street segments
- Bryant Street Bike Network Improvement ProjectSFMTA · Completed · 3 shared street segments
- Upper Market Street Safety ProjectSFMTA · Implementation / Construction · 2 shared street segments
- Octavia Boulevard Enhancement ProgramSFMTA · Current · 2 shared street segments
- Western Addition Community Based Transportation Plan ImplementationSFMTA · Current · 1 shared street segment