Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
As Needed City-wide Pavement Preservation 6 (General As-Needed Contract G29)
0% in published scope
Public Works · Spot repairs · Construction · Under way, ends 27 Dec 2027
All 6 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 35th Ave, 39th Ave, 40th Ave, 41st Ave, 46th Ave, Amazon Ave
- Planned bikeway
- Shared street, 0.5 mi on Chenery St, Wilder St, Ottawa Ave, Brunswick St
- Would reach
- 3,911 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 6 street segments that lack one. Closer in: 2,948 residents, 1 school, 1 library with none within about one block (440 feet) today would have one; 4,505 residents, 1 school with none within about two blocks (880 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation not published not published Construction Apr 2025 Dec 2027 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
7 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING ANY TIME, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 41st Avenue, east side, from 5 feet to 68 feet north of Quintara Street (63-foot station) (Supervisor District 4) (Approvable by the City T…20 Sep 2024 · Engineering hearing · Continued.
- Approve an increase in the amount of $450,000 to the cost contingency and an increase of 60 calendar days to the duration contingency for Contract No. WD-2843, 16-, 12-, and 8-Inch Ductile Iron Water Main Replacement on …14 May 2024 · SFPUC Commission
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 41st Avenue, west side, from 5 feet to 61 feet north of Irving Street (53-foot bike share station with red zones on each side of the station) (Superv…6 Jan 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – TRAFFIC SIGNAL 39th Avenue, Skyline Boulevard, and Sloat Boulevard (Supervisor Districts 4 and 7) (Approvable by the City Traffic Engineer) Corbin Skerrit, [staff email removed — see the order] A new traffic …23 Sep 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 41st Avenue, west side, from 5 feet to 61 feet north of Irving Street (53-foot bike share station with red zones on each side of the station) (Superv…18 Feb 2022 · Engineering hearing · Item withdrawn.
- Accept work performed by Cratus, Inc. for Contract No. WD-2614, 8-Inch Ductile Iron Water Main Replacement on Green Street from Gough Street to Broderick Street; approve Modification No. 2 (Final), decreasing the contrac…8 Jun 2021 · SFPUC Commission · approve the Consent Calendar 8a through 8e
- Hearing of persons interested in or objecting to a Statutory Exemption by the Planning Department under the California Environmental Quality Act issued September 1, 2022, for the proposed Municipal Transportation Agency …Undated · Board of Supervisors · Killed
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 5 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- District 11-Wide Traffic Calming ProjectSFMTA · 26 shared street segments
- Bayview Community Based Transportation PlanSFMTA · Planning · 11 shared street segments
- Visitacion Valley and Portola Community Based Transportation PlanSFMTA · Planning · 9 shared street segments
- Excelsior Neighborhood Traffic Calming ProjectSFMTA · Completed · 8 shared street segments
- Western Addition Community Based Transportation Plan ImplementationSFMTA · Current · 2 shared street segments
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 2 shared street segments
- Nibbi Ctother · Planning · 2 shared street segments
- Minnesota Slow StreetSFMTA · Legislated · 1 shared street segment