Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
WD-2936 8-, 12- & 16-inch Ductile Iron Water Main Replacement on Geary Boulevard from Stanyan Street to Presidio Avenue & on Post Street from Presidio Avenue to Scott Street & on Various Side Streets
0% in published scope
SFPUC · Sewer, water or power · Design · Starts 4 Feb 2027, ends 4 Feb 2029
4 of the project's 6 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- Beaumont Ave, Commonwealth Ave, Emerson St, Euclid Ave, Fillmore St, Geary Blvd
- Planned bikeway
- Shared street, 0.46 mi on Euclid Ave
Bikeway of undecided type, 0.14 mi on Presidio Ave
Separated bikeway, 0.084 mi on Geary Blvd - Would reach
- 166 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 4 street segments that lack one. Closer in: 2,121 residents with none within about one block (440 feet) today would have one; 1,250 residents with none within about two blocks (880 feet) today would have one
- Scope
- “Geary Blvd from Stanyan to Presidio Avenues and on Post St from Presidio Ave to Scott St”
- Dates
Start End Public consultation not published not published Construction Feb 2027 Feb 2029 - Records
- Interagency coordination feed record (DataSF row) · No SFPUC page for this job; closest official source: Water Main Replacement Process
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
13 decisions on the same streets, not naming this project
- RESCIND – UNMETERED MOTORCYCLE PARKING ESTABLISH – RED ZONE Scott Street, east side, from Grove Street northern crosswalk to 10 feet southerly 11(b). ESTABLISH – RED ZONE Scott Street, east side, from Grove Street southe…16 May 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO PARKING ANYTIME EXCEPT BICYCLES Scott Street, east side, from Haight Street to 19 feet southerly (for 9-foot corral and red zones). (Supervisor District 5) (Approvable by the City Traffic Engineer) Grant B…6 Dec 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Award Contract No. WW-743, Geary Boulevard Sewer and Water Improvements Phase 2, to the responsible bidder that submitted the lowest responsive bid, Cratus, Inc., in the amount of $45,957,035, and with a duration of 1,03…25 Jun 2024 · SFPUC Commission
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Post Street, south side, from 23 feet 9 inches to 43 feet 9 inches east of Pierce Street (Supervisor District 5) (Approvable by the City Traffic Engineer) Grant Brokl, [st…17 May 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Steiner Street, west side, from 10 feet to 20 feet north of Post Street (Supervisor District 5) (Approvable by the City Traffic Engineer) Grant Brokl, [staff email removed…17 May 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO RIGHT TURN, EXCEPT BICYCLES Stanyan Street, northbound, at Page Street (Approvable by the City Traffic Engineer) 12(b). ESTABLISH – NO LEFT TURN, EXCEPT BICYCLES Stanyan Street, southbound, at Page Street …8 Jul 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Amending Transportation Code, Division II, Sections 601 and 602, to designate full-time transit-only areas along the 43 Masonic and 44 O’Shaughnessy transit lines on Presidio Avenue, southbound, from Bush Street to Sutt …18 Jan 2022 · SFMTA Board
- Accept work performed by M Squared Construction, Inc., Contract No. WD-2692, 16-inch and 8-inch Ductile Iron Water Main Installation and Sewer Replacement on Geary Boulevard from 32nd to 48th Avenues, for a total contrac…23 Nov 2021 · SFPUC Commission · approve Consent Calendar items 10a, 10c, 10d, and 10e
- Accept work performed by JMB Construction, Inc. for Contract No. WW-674R, Geary Boulevard Sewer and Water Improvements; approve Modification No. 2 (final) decreasing the contract amount by $494,459, for a total contract …10 Aug 2021 · SFPUC Commission · approve Consent Calendar items 8a, 8b, and 8d
- Approve increase of $100,000 to the contract cost contingency, and increase of 70 calendar days to the contract duration contingency, for Contract No. WD- 2692, 16-Inch And 8-Inch Ductile Iron Water Main Installation, Se…11 May 2021 · SFPUC Commission · approve Consent Calendar items 8c, 8d, and 8g
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Fillmore Street, east side along median, from Jefferson Street to 53 feet southerly (bike share station in angled parking stalls) (Supervisor Distric…17 Jul 2020 · Engineering hearing · Approved by the City Traffic Engineer for implementation. Public Comments: Received comments in support and opposition.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Post Street, north side, from Baker Street to 88 feet easterly (75-foot bike share station with red zones on either side) (Supervisor District 5) Pro…12 Jun 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in opposition.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Post Street, north side, from 14 feet to 99 feet west of Webster Street (84-foot bike share station with red zones on either side) (Supervisor Distri…24 Jan 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Western Addition Community Based Transportation Plan ImplementationSFMTA · Current · 8 shared street segments
- Various Locations Pavement Renovation No 81 and Sewer ReplacementPublic Works · Construction · 7 shared street segments
- Laurel Heights/Jordan Park Traffic Calming ProjectSFMTA · Implementation / Construction · 7 shared street segments
- Geary BRT Sewer Improvements Phase 2Public Works · Construction · 4 shared street segments
- PLN 2526-001: 8-inch Ductile Iron Water Main Replacement on Sutter from Divisadero to Webster, on Pine from Pierce to Gough St, and Various Side StreetsSFPUC · Planning · 3 shared street segments
- PW Various Locations Sewer Replacement No 31Public Works · Design · 3 shared street segments
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 2 shared street segments
- PW StreetResurfacingPro-BBSR Pavement Prese FY 26-27Public Works · Construction · 2 shared street segments
How we built this: About the Data