Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Spot Main Sewer Replacement No 2
0% in published scope
Public Works · Spot repairs · Design · Starts 15 Mar 2027, ends 12 Mar 2028
2 of the project's 6 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 18th Ave, 28th Ave, 28th St, 30th Ave, 31st Ave, 38th Ave
- Planned bikeway
- Bikeway of undecided type, 0.52 mi on 6th Ave
Shared street, 0.42 mi on Sanchez St, Golden Gate Ave, Anza St
Separated bikeway, 0.12 mi on Clement St - Would reach
- 749 residents (2020 census), 2 schools would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 2 street segments that lack one. Closer in: 2,202 residents with none within about one block (440 feet) today would have one; 1,477 residents, 1 school with none within about two blocks (880 feet) today would have one
- Scope
- “2560i, WW-792”
- Dates
Start End Public consultation not published not published Construction Mar 2027 Mar 2028 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
13 decisions on the same streets, not naming this project
- Accept work performed by M Squared Construction, Inc., under Contract No. WD-2874, 8- and 16-Inch Ductile Iron Water Main Replacement on Joost Avenue from Ridgewood Avenue to Congo Street and Various Side Streets; approv…24 Mar 2026 · SFPUC Commission · approve the Consent Calendar
- Accept work performed by M. Squared Construction, Inc., under Contract No. WD- 2896, 12-Inch Ductile Iron Water Main Installation on Webster Street from Grove Street to Eddy Street; approve Modification No. 3 (Final) dec…10 Nov 2025 · SFPUC Commission · approve the Consent Calendar
- Award Contract No. WW-757R, Laguna, Howard, and Mission Creek Combined Sewer Discharge Improvements, to the responsible bidder that submitted the lowest responsive bid, Pullman SST, Inc., in the amount of $7,296,786, wit…13 May 2025 · SFPUC Commission · approve the Consent Calendar
- Approve an increase of 155 calendar days to the duration contingency for Contract No. WW-705, Various Locations Sewer Replacement No. 10, with Mitchell Engineering, for SFPUC DECEMBER 10, 2024 MEETING MINUTES Page 6 of 1…10 Dec 2024 · SFPUC Commission · approve Item 13
- Award Contract No. WD-2844, 12-Inch Ductile Iron Water Main Installation on Parnassus Avenue, from Stanyan Street to 6th Avenue, on Lawton Street from 7th Avenue to Funston Avenue, and Various Street Locations, to the re…24 Sep 2024 · SFPUC Commission · approve the Consent Calendar
- Approve an increase of 90 calendar days to the duration contingency and increase of $200,000 to the amount contingency for Contract No. WW-705, Various Locations Sewer Replacement No. 10, with Mitchell Engineering, for a…25 Jun 2024 · SFPUC Commission
- Award Contract No. WW-743, Geary Boulevard Sewer and Water Improvements Phase 2, to the responsible bidder that submitted the lowest responsive bid, Cratus, Inc., in the amount of $45,957,035, and with a duration of 1,03…25 Jun 2024 · SFPUC Commission
- Approve an increase in the amount of $450,000 to the cost contingency and an increase of 60 calendar days to the duration contingency for Contract No. WD-2843, 16-, 12-, and 8-Inch Ductile Iron Water Main Replacement on …14 May 2024 · SFPUC Commission
- Approve an increase of 185 calendar days to the contract duration contingency for Contract No. WW-705, Various Locations Sewer Replacement No. 10, with Mitchell Engineering, for a new contract duration limit of up to 570…26 Mar 2024 · SFPUC Commission · approve items 6a through 6e
- Award Contract No. WD-2896, 12-Inch Ductile Iron Water Main Installation on Webster Street from Grove Street to Eddy Street, to the responsible bidder that submitted the lowest responsive bid, M. Squared Construction, In…9 Jan 2024 · SFPUC Commission · approve items 6a through 6i
- Award Contract No. WD-2874, 8-Inch & 16-Inch Ductile Iron Water Main Replacement on Joost Avenue from Ridgewood Avenue to Congo Street and Various Side Streets, to the responsible bidder that submitted the lowest respons…14 Nov 2023 · SFPUC Commission · approve the Consent Calendar
- Accept work performed by Cratus, Inc. for Contract No. WD-2614, 8-Inch Ductile Iron Water Main Replacement on Green Street from Gough Street to Broderick Street; approve Modification No. 2 (Final), decreasing the contrac…8 Jun 2021 · SFPUC Commission · approve the Consent Calendar 8a through 8e
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Clement Street, north side, from 62 feet to 131 feet west of 32nd Avenue (62-foot bike share station with red zones on either side) (Supervisor Distr…21 Feb 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support.
8 other projects on these street segments
- N-JudahSFMTA · Planning · 4 shared street segments
- Dogpatch-Central Waterfront Area Transit Connections StudySFMTA · Current · 3 shared street segments
- Joint - MTA Lead - Judah St Pavement RenovationPublic Works · Planning · 3 shared street segments
- Western Addition Community Based Transportation Plan ImplementationSFMTA · Current · 2 shared street segments
- Fulton Street Safety and Transit ProjectSFMTA · Completed · 2 shared street segments
- 17th Street Bicycle Safety ProjectSFMTA · Completed · 1 shared street segment
- Geary BRT Sewer Improvements Phase 2Public Works · Construction · 1 shared street segment
- WD-2708: Geary Street Phase 2SFPUC · Construction · 1 shared street segment