Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
6th Street Pedestrian Safety Project
Not stated
SFMTA · Bike, walk or safety · Current · Under way, ends 31 Aug 2025
1 of the project's 2 street segments on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA lists it as a bike project, but does not say whether it builds that bikeway.
- Streets
- Folsom St
- Planned bikeway
- Separated bikeway, 0.13 mi on Folsom St
- Scope
- None published.
- Dates
Start End Public consultation Winter 2013 - 11 Dec 2019 Construction January 2022 August 2025 - Sources disagree
- The project page's timeline and event cards give the latest public consultation as 2019-12-11; the page's text gives 2019-07-25 (“July 25, 2019”).
Public Works' page gives its status as Completed; SFMTA's project layer gives Current.
The published end date, 2025-08-31, has passed; SFMTA's project layer still gives it as Current. - Records
- SFMTA project page · Public Works project page (6th Street Pedestrian Safety Project)
City decisions naming this project
- 6th Street Pedestrian Safety Project, Contract 1000015023 – Contract Modification3 Nov 2023 · Public Works Commission
- Adopting a Resolution of Local Support for the 6th Street Pedestrian Safety Project, to be funded in part from a 2019 Regional ATP Cycle 4 grant in the amount of up to $6,000,000 from the Metropolitan Transportation Comm…21 May 2019 · SFMTA Board · ADOPTED — 4 ayes (Resolution 190514-052)
3 milestones and events from the project's own page
- District 6 Bicycle and Pedestrian Safety Open House11 Dec 2019 · Project page event
- 6th Street and Taylor Street Urban Design Open House25 Jul 2019 · Project page event
- 6th Street Pedestrian Safety Project Streetscape Open House27 Jun 2018 · Project page event
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Brannan Street Safety ProjectSFMTA · Completed · 7 shared street segments
- Folsom-Howard Streetscape ProjectSFMTA · Current · 4 shared street segments
- Various Locations Pavement Renovation No 87Public Works · Design · 3 shared street segments
- Joint - Streetscape Lead - Folsom St 10032072Public Works · Construction · 2 shared street segments
- PW Folsom Streetscape ProjectPublic Works · Construction · 2 shared street segments
- Mission Bay Blvd Quick-Build ProjectSFMTA · Implementation / Construction · 2 shared street segments
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 1 shared street segment
- Dogpatch-Central Waterfront Area Transit Connections StudySFMTA · Current · 1 shared street segment
How we built this: About the Data