Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

Broadway, Pacific Ave and Vallejo St Pavement Renovation

0% in published scope

Public Works · Repaving · Planning · Starts 28 May 2029, ends 10 Aug 2030

Early enough to change: Public Works gives its phase as Planning; its project page may list a contact. No meeting on it is posted for the next 60 days.

All 2 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
Bartol St, Broadway, Kearny St, Montgomery St, Pacific Ave, Pollard Pl
Planned bikeway
Shared street, 0.091 mi on Pacific Ave
Would reach
3,039 residents (2020 census), 1 school would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 2 street segments that lack one. Closer in: 869 residents, 1 school with none within about one block (440 feet) today would have one; 1,205 residents, 1 school with none within about two blocks (880 feet) today would have one
Scope
None published.
Dates
StartEnd
Public consultationnot publishednot published
ConstructionMay 2029Aug 2030
Records
Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

8 decisions on the same streets, not naming this project

Construction on these street segments

2025202620272028202920302031todayBroadway, Pacific Ave and Vallejo St…PW As Needed Spot Sewer Replacement …WD-2877 As Needed Water Main Replace…Various Locations Sewer Replacement …Chinatown and SOMA Large Diameter Se…PW As Needed Spot Sewer Replacement No 47: construction 22 Sep 2025 to 26 Oct 2026WD-2877 As Needed Water Main Replacement No.3: construction 1 Jan 2026 to 1 Jan 2029Various Locations Sewer Replacement No 29: construction 12 Jun 2027 to 13 Dec 2028Chinatown and SOMA Large Diameter Sewer Improvements: construction 31 Jul 2027 to 30 Jul 2028Broadway, Pacific Ave and Vallejo St Pavement Renovation: construction 28 May 2029 to 10 Aug 203022 Sep 2025 – 26 Oct 20261 Jan 2026 – 1 Jan 202912 Jun 2027 – 13 Dec 202831 Jul 2027 – 30 Jul 202828 May 2029 – 10 Aug 2030

Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.

5 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.