Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Geary Boulevard Improvement Project
Not stated
SFMTA · Bike, walk or safety · Implementation / Construction · Under way, ends 30 Apr 2028
All 2 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA lists it as a bike project, but does not say whether it builds that bikeway.
- Streets
- 34th Ave
- Planned bikeway
- Shared street, 0.53 mi on 34th Ave
- Would reach
- 749 residents (2020 census), 1 school, 1 library would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 2 street segments that lack one. Closer in: 1,244 residents with none within about one block (440 feet) today would have one; 971 residents with none within about two blocks (880 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation not published 2023 Construction Fall 2023 Early 2028 - Records
- SFMTA project page
City decisions naming this project
- Geary Boulevard Improvement Project - Surface Upgrades - Contract Award23 Jul 2026 · Public Works Commission
6 milestones and events from the project's own page
- Geary Community Advisory Committee Meeting - July 8, 20268 Jul 2026 · Project page event
- Geary Community Advisory Committee Meeting - April 8, 20268 Apr 2026 · Project page event
- Geary Community Advisory Committee Meeting - January 14, 202614 Jan 2026 · Project page event
- We're seeking Geary Community Advisory Committee members28 Oct 2025 · Project page notice
- Public Hearing: Tree Removal at 4200 Geary Boulevard, May 28, 202520 May 2025 · Project page notice
- Notice of Tree Removal at 4200 Geary Boulevard28 Mar 2025 · Project page notice
4 decisions on the same streets, not naming this project
- Award Contract No. WW-743, Geary Boulevard Sewer and Water Improvements Phase 2, to the responsible bidder that submitted the lowest responsive bid, Cratus, Inc., in the amount of $45,957,035, and with a duration of 1,03…25 Jun 2024 · SFPUC Commission
- Accept work performed by M Squared Construction, Inc., Contract No. WD-2692, 16-inch and 8-inch Ductile Iron Water Main Installation and Sewer Replacement on Geary Boulevard from 32nd to 48th Avenues, for a total contrac…23 Nov 2021 · SFPUC Commission · approve Consent Calendar items 10a, 10c, 10d, and 10e
- Accept work performed by JMB Construction, Inc. for Contract No. WW-674R, Geary Boulevard Sewer and Water Improvements; approve Modification No. 2 (final) decreasing the contract amount by $494,459, for a total contract …10 Aug 2021 · SFPUC Commission · approve Consent Calendar items 8a, 8b, and 8d
- Approve increase of $100,000 to the contract cost contingency, and increase of 70 calendar days to the contract duration contingency, for Contract No. WD- 2692, 16-Inch And 8-Inch Ductile Iron Water Main Installation, Se…11 May 2021 · SFPUC Commission · approve Consent Calendar items 8c, 8d, and 8g
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.
7 other projects on these street segments
- Geary BRT Sewer Improvements Phase 2Public Works · Construction · 10 shared street segments
- PW Geary BRT Phase 2Public Works · Design · 4 shared street segments
- WD-2708: Geary Street Phase 2SFPUC · Construction · 3 shared street segments
- WD-2936 8-, 12- & 16-inch Ductile Iron Water Main Replacement on Geary Boulevard from Stanyan Street to Presidio Avenue & on Post Street from Presidio Avenue to Scott Street & on Various Side StreetsSFPUC · Design · 2 shared street segments
- Various Locations Pavement Renovation No 78Public Works · Design · 2 shared street segments
- Anza Street Bike Lanes ProjectSFMTA · Planning · 1 shared street segment
- PW Various Locations Sewer Replacement (JV VL PR No 78)Public Works · Design · 1 shared street segment