SF WorksMobility Improving The Bike Network Improving The Bike NetworkSafer School Trips Current Repaving Projects Other Bike PlansCurrent Repaving Projects

Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

PW Various Locations Sewer Replacement (JV VL PR No 79)

Already built

Public Works · Sewer, water or power · Design · Under way, ends 17 Nov 2026

The project's one street segment on a planned bikeway street already has an all-ages bikeway.

Streets
De Haro St, Rhode Island St, Townsend St
Planned bikeway
Separated bikeway, 0.34 mi on Townsend St
Scope
“2371i”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionWinter, 2026Nov 2026
Sources disagree
The coordination feed gives construction starting 2025-09-04; Public Works' project page (Start “Winter, 2026”; text “Winter, 2026”), 2026-01, which is shown.
The start date has passed (2026-01) while the phase is still Design, per the coordination feed.
Records
Public Works project page · Interagency coordination feed record (DataSF row)

City decisions naming this project

3 decisions on the same streets, not naming this project

Construction on these street segments

2025202620272028todayPW Various Locations Sewer Replaceme…Bikeway HardeningVarious Locations Pavement Renovatio…WD-2919: 8- and 12-Inch Ductile Iron…Bikeway Hardening: construction 1 Jul 2025 to 30 Jun 2027Various Locations Pavement Renovation No 79: construction Jan 2026 to 17 Nov 2026WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side Streets: construction 13 Apr 2026 to 9 Dec 2027PW Various Locations Sewer Replacement (JV VL PR No 79): construction Jan 2026 to 17 Nov 2026Jan 2026 – 17 Nov 2026Jan 2026 – 17 Nov 202613 Apr 2026 – 9 Dec 20271 Jul 2025 – 30 Jun 2027

Construction start and end as each department publishes them; a dot where only one is published. 3 other projects on these street segments publish no construction dates.

6 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.