Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
PW Various Locations Sewer Replacement (JV VL PR No 79)
Already built
Public Works · Sewer, water or power · Design · Under way, ends 17 Nov 2026
The project's one street segment on a planned bikeway street already has an all-ages bikeway.
- Streets
- De Haro St, Rhode Island St, Townsend St
- Planned bikeway
- Separated bikeway, 0.34 mi on Townsend St
- Scope
- “2371i”
- Dates
Start End Public consultation not published not published Construction Winter, 2026 Nov 2026 - Sources disagree
- The coordination feed gives construction starting 2025-09-04; Public Works' project page (Start “Winter, 2026”; text “Winter, 2026”), 2026-01, which is shown.
The start date has passed (2026-01) while the phase is still Design, per the coordination feed. - Records
- Public Works project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
- Award Various Locations Pavement Renovation No. 79 and Sewer Replacement to Michael O’Shaughnessy Construction, Inc. in the amount of $3,070,476.6024 Jul 2025 · Public Works Commission
3 decisions on the same streets, not naming this project
- Approve an increase of $215,000 to the contract cost contingency and an increase of 50 calendar days to the contract duration contingency for Contract No. WW-707R, Various Locations Sewer Replacement No. 11, with Basset …26 Sep 2023 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – TOW-AWAY, NO STOPPING ANYTIME Townsend Street, south side, from 3rd Street to 209 feet westerly (removes 5 general meter parking spaces) 26(b). ESTABLISH – CLASS IV BIKEWAY (PROTECTED BIKEWAY) Townsend Street…24 Jan 2020 · Engineering hearing · Approved by the City Traffic Engineer to send to send items 26(a) through 26(f) to the SFMTA Board for legislation. 26(g) and 26(h) amended as underlined per follow-up with public hearing attendees and approved by the City Traffic Engineer for implementation. # note applies to item 26(g). Public Com
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Townsend Street, north side, from 27 feet 124 feet west of 5th Street (expanding existing bike share station to the west by 15 feet) ♦ 11(b). ESTABLI…13 Sep 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: One comment in opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 3 other projects on these street segments publish no construction dates.
6 other projects on these street segments
- Various Locations Pavement Renovation No 79Public Works · Design · 3 shared street segments
- WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side StreetsSFPUC · Design · 1 shared street segment
- Dogpatch-Central Waterfront Area Transit Connections StudySFMTA · Current · 1 shared street segment
- Townsend Corridor Improvement ProjectSFMTA · Completed · 1 shared street segment
- 7th Street and 8th Street Safety ProjectsSFMTA · Completed · 1 shared street segment
- Bikeway HardeningSFMTA · Planning · 1 shared street segment
How we built this: About the Data