Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
WW-779 Various Locations Sewer Replacement No. 32
0% in published scope
Public Works · Sewer, water or power · Design · Under way, ends 29 Oct 2027
All 3 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 19th St, Arkansas St, Berwick Pl, Bryant St, Carolina St, De Haro St
- Planned bikeway
- Shared street, 0.53 mi on Kansas St, Indiana St, Henry Adams St
- Would reach
- No one new would be within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 3 street segments that lack one. Closer in: 401 residents (2020 census) with none within about one block (440 feet) today would have one; 255 residents with none within about two blocks (880 feet) today would have one
- Scope
- “WW-779 Various Locations Sewer Replacement No. 32”
- Dates
Start End Public consultation not published not published Construction Jun 2025 Oct 2027 - Sources disagree
- The start date has passed (2025-06-02) while the phase is still Design, per the coordination feed.
- Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
2 decisions on the same streets, not naming this project
- ESTABLISH – GENERAL METERED PARKING, NO TIME LIMIT, 9AM TO 6PM MONDAY THROUGH SATURDAY Arkansas Street, both sides, from 16th Street to 200 feet southerly 7(b). ESTABLISH – RESIDENTIAL PERMIT PARKING AREA X (Eligibility …26 Jun 2026 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- ESTABLISH – RESIDENTIAL PERMIT PARKING AREA X 88 Arkansas Street 4(b). RESCIND – 4-HOUR PARKING, MON-SAT FROM 8 AM TO 6 PM ESTABLISH – 2-HOUR PARKING, MON-SAT FROM 8 AM TO 10 PM, EXCEPT FOR VEHICLES WITH AREA X PERMITS A…17 May 2024 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 3 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Various Locations Sewer Replacement No 32Public Works · Design · 49 shared street segments
- Dogpatch-Central Waterfront Area Transit Connections StudySFMTA · Current · 14 shared street segments
- WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side StreetsSFPUC · Design · 7 shared street segments
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 4 shared street segments
- Various Locations Sewer Replacement No 39Public Works · Design · 4 shared street segments
- Arkansas Sewer Replacement (JV w PUC WD-2919)Public Works · Design · 4 shared street segments
- PW Various Locations Sewer Replacement No 16Public Works · Construction · 3 shared street segments
- Slow StreetsSFMTA · Construction · 2 shared street segments