Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

WW-779 Various Locations Sewer Replacement No. 32

0% in published scope

Public Works · Sewer, water or power · Design · Under way, ends 29 Oct 2027

All 3 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
19th St, Arkansas St, Berwick Pl, Bryant St, Carolina St, De Haro St
Planned bikeway
Shared street, 0.53 mi on Kansas St, Indiana St, Henry Adams St
Would reach
No one new would be within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 3 street segments that lack one. Closer in: 401 residents (2020 census) with none within about one block (440 feet) today would have one; 255 residents with none within about two blocks (880 feet) today would have one
Scope
“WW-779 Various Locations Sewer Replacement No. 32”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionJun 2025Oct 2027
Sources disagree
The start date has passed (2025-06-02) while the phase is still Design, per the coordination feed.
Records
Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

2 decisions on the same streets, not naming this project

Construction on these street segments

202520262027202820292030todayWW-779 Various Locations Sewer Repla…PW Various Locations Sewer Replaceme…PW As Needed Spot Sewer Replacement …WD-2919: 8- and 12-Inch Ductile Iron…Various Locations Sewer Replacement …Various Locations Sewer Replacement …PW Various Locations Sewer Replacement No 16: construction 8 Sep 2025 to 9 Feb 2027PW As Needed Spot Sewer Replacement No 47: construction 22 Sep 2025 to 26 Oct 2026WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side Streets: construction 13 Apr 2026 to 9 Dec 2027Various Locations Sewer Replacement No 32: construction 22 Jun 2027 to 28 Dec 2028Various Locations Sewer Replacement No 39: construction 15 May 2028 to 14 Nov 2029WW-779 Various Locations Sewer Replacement No. 32: construction 2 Jun 2025 to 29 Oct 20272 Jun 2025 – 29 Oct 20278 Sep 2025 – 9 Feb 202722 Sep 2025 – 26 Oct 202613 Apr 2026 – 9 Dec 202722 Jun 2027 – 28 Dec 202815 May 2028 – 14 Nov 2029

Construction start and end as each department publishes them; a dot where only one is published. 3 other projects on these street segments publish no construction dates.

8 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.