Mission District Sewer Rehabilitation (VLLD2B)

0% in published scope

Public Works · Sewer, water or power · Design · Starts 7 Jun 2027, ends 6 Jun 2028

Early enough to change: Public Works gives its phase as Design. No meeting on it is posted for the next 60 days.

10 of the project's 28 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
14th St, 15th St, 17th St, 18th St, 19th St, 22nd St
Planned bikeway
Separated bikeway, 1.3 mi on 17th St, Valencia St, Fell St
Shared street, 1.1 mi on Sanchez St, Steiner St, Waller St, Page St
Bikeway of undecided type, 0.97 mi on 17th St
Would reach
No one new would be within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 10 street segments that lack one. Closer in: 228 residents (2020 census) with none within about one block (440 feet) today would have one
Scope
“2652I”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionJun 2027Jun 2028
Records
Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer System Upgrades

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

11 decisions on the same streets, not naming this project

Construction on these street segments

202420252026202720282029203020312032203320342035todayMission District Sewer Rehabilitatio…Contract 36 Traffic Signal Modificat…14-009 8-, and 24-inch Ductile Iron …PW As Needed Spot Sewer Replacement …FASIP Harrison/Treat Box Sewer and C…Page Slow Street18th St and Valencia St Pavement Ren…Contract 36 Traffic Signal Modifications: construction Apr 2024 to 31 May 202614-009 8-, and 24-inch Ductile Iron Water Main Replacement on Page Street from Stanyan to Fillmore Streets: construction 1 Jun 2025 to 20 Jan 2027PW As Needed Spot Sewer Replacement No 47: construction 22 Sep 2025 to 26 Oct 2026FASIP Harrison/Treat Box Sewer and Connecting Auxiliary Sewers: construction 1 Jan 2026 to 31 Aug 2029Page Slow Street: construction 1 Sep 2026 to 31 Dec 202718th St and Valencia St Pavement Renovation: construction 28 Dec 2032 to 13 Mar 2034Mission District Sewer Rehabilitation (VLLD2B): construction 7 Jun 2027 to 6 Jun 20287 Jun 2027 – 6 Jun 2028Apr 2024 – 31 May 20261 Jun 2025 – 20 Jan 202722 Sep 2025 – 26 Oct 20261 Jan 2026 – 31 Aug 20291 Sep 2026 – 31 Dec 202728 Dec 2032 – 13 Mar 2034

Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.

8 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.