Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Pavement Renovation No 99
0% in published scope
Public Works · Repaving · Planning · Starts 28 Mar 2030, ends 10 Jun 2031
4 of the project's 6 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 23rd St, 24th St, 25th St, 26th St, Benton Ave, Castro St
- Planned bikeway
- Shared street, 0.8 mi on Diamond St, Jersey St, Sanchez St
- Would reach
- 1,160 residents (2020 census), 1 school would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 4 street segments that lack one. Closer in: 1,135 residents, 1 school with none within about one block (440 feet) today would have one; 1,383 residents with none within about two blocks (880 feet) today would have one
- Scope
- “Resurfacing along Bosworth St.,Chenery St., and other locations.”
- Dates
Start End Public consultation not published not published Construction Mar 2030 Jun 2031 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
6 decisions on the same streets, not naming this project
- Approve an increase in the amount of $450,000 to the cost contingency and an increase of 60 calendar days to the duration contingency for Contract No. WD-2843, 16-, 12-, and 8-Inch Ductile Iron Water Main Replacement on …14 May 2024 · SFPUC Commission
- Award Contract No. WD-2765, 8-Inch and 16-Inch Ductile Iron Water Main Replacement on Jersey Street from Douglass Street to Church Street and Various Street Locations, to the responsible bidder that submitted the lowest …9 Apr 2024 · SFPUC Commission · approve the Consent Calendar
- Accept work performed by M Squared Construction, Inc., under Contract No. WD-2811, 8- Inch and 16-Inch Ductile Iron Water Main Replacement on 17th Street from Clayton Street to Douglass Street and Various Side Streets; a…9 Jan 2024 · SFPUC Commission · approve items 6a through 6i
- Accept work performed by Cratus, Inc. under Contract No. WD-2739, Pavement Renovation, Sewer Replacement, and Water Main Replacement on Castro Street and 26th Street, for a total contract amount of $15,404,492, and with …27 Jun 2023 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – RED ZONE A. 25th Street, south side, from Connecticut Street to 29 feet easterly (removes 1 parking space) B. 25th Street, south side, from 184 feet to 306 feet east of Connecticut Street (removes 6 parking s…8 Jul 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation. # (only 16(b) is reviewable by BOS)
- Accept work performed by Mitchell Engineering for Contract No. WD-2719, 8-Inch Ductile Iron Pipe and 12-Inch Earthquake Resistant Ductile Iron Pipe Water Main Installation on 22nd Street from Fair Oaks Street to Hampshir…24 Aug 2021 · SFPUC Commission · approve Item 10
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.
5 other projects on these street segments
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 4 shared street segments
- 2021-003 8-inch Ductile Iron Water Main Replacement on Diamond St from 25th to 27th Street and Various Side StreetsSFPUC · Planning · 3 shared street segments
- PW Various Locations Sewer Replacement No 18Public Works · Construction · 2 shared street segments
- Slow StreetsSFMTA · Construction · 2 shared street segments
- PW Hoffman Avenue Sewer Replacement (JV w PUC WD-2875)Public Works · Construction · 1 shared street segment