Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

Various Locations Pavement Renovation No 99

0% in published scope

Public Works · Repaving · Planning · Starts 28 Mar 2030, ends 10 Jun 2031

Early enough to change: Public Works gives its phase as Planning; its project page may list a contact. No meeting on it is posted for the next 60 days.

4 of the project's 6 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
23rd St, 24th St, 25th St, 26th St, Benton Ave, Castro St
Planned bikeway
Shared street, 0.8 mi on Diamond St, Jersey St, Sanchez St
Would reach
1,160 residents (2020 census), 1 school would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 4 street segments that lack one. Closer in: 1,135 residents, 1 school with none within about one block (440 feet) today would have one; 1,383 residents with none within about two blocks (880 feet) today would have one
Scope
“Resurfacing along Bosworth St.,Chenery St., and other locations.”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionMar 2030Jun 2031
Records
Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

6 decisions on the same streets, not naming this project

Construction on these street segments

20252026202720282029203020312032todayVarious Locations Pavement Renovatio…PW Various Locations Sewer Replaceme…PW As Needed Spot Sewer Replacement …2021-003 8-inch Ductile Iron Water M…PW Various Locations Sewer Replacement No 18: construction 25 Jun 2025 to 26 Oct 2026PW As Needed Spot Sewer Replacement No 47: construction 22 Sep 2025 to 26 Oct 20262021-003 8-inch Ductile Iron Water Main Replacement on Diamond St from 25th to 27th Street and Various Side Streets: construction 1 Dec 2028 to 30 Jun 2030Various Locations Pavement Renovation No 99: construction 28 Mar 2030 to 10 Jun 203125 Jun 2025 – 26 Oct 202622 Sep 2025 – 26 Oct 202628 Mar 2030 – 10 Jun 20311 Dec 2028 – 30 Jun 2030

Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.

5 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.