Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
18th St and Valencia St Pavement Renovation
0% in published scope
Public Works · Repaving · Planning · Starts 28 Dec 2032, ends 13 Mar 2034
4 of the project's 19 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 18th St, Valencia St
- Planned bikeway
- Separated bikeway, 2.8 mi on Valencia St
- Would reach
- 0 residents (2020 census), 2 schools would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 4 street segments that lack one. Closer in: 1,446 residents, 1 school with none within about one block (440 feet) today would have one; 253 residents, 3 schools with none within about two blocks (880 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation not published not published Construction Dec 2032 Mar 2034 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
14 decisions on the same streets, not naming this project
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Valencia Street, east side, from 175 feet to 195 feet south of 21st Street (for 20-foot corral) (Supervisor District 9) (Approvable by the City Traffic Engineer) Grant Bro…4 Sep 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approving revisions to the side-running protected bikeway and parking and traffic modifications on Valencia Street between 15th and 23rd streets Approving revisions to the side-running protected bikeway and parking and t…15 Apr 2025 · SFMTA Board · ADOPTED — 7 ayes (Resolution 250415-036)
- ESTABLISH – NO STOPPING ANY TIME, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION A. Valencia Street, west side, from 90 feet to 149 feet south of 18th Street (59-foot bike share station) B. Valencia Street, west side, fr…7 Feb 2025 · Engineering hearing · Revised description. Approved by the City Traffic Engineer for implementation.
- Hearing of persons interested in or objecting to the Statutory Exemption determination by the Planning Department under the California Environmental Quality Act issued on November 4, 2024, for the proposed Municipal Tran…28 Jan 2025 · Board of Supervisors · Filed
- Approving a side-running protected bikeway and parking and traffic modifications on Valencia Street between 15th and 23rd streets and side streets, as set forth in Items A through NN, to improve safety for all modes of t…19 Nov 2024 · SFMTA Board · ADOPTED — 6 ayes (Resolution 241119-129)
- Receiving an update on the Valencia Bikeway Project, also known as the Mid-Valencia Bikeway Pilot, which seeks to improve safety, preserve economic vitality, and ensure movement and access of goods and people on Valencia…18 Jun 2024 · SFMTA Board · ADOPTED — 5 ayes (Resolution 240618-071)
- Approve an increase in the amount of $2,500,000 to the cost contingency and an increase of 100 calendar days to the duration contingency for Contract No. WW-736, Castro and Mission Districts Sewer Improvements, with Prec…14 May 2024 · SFPUC Commission
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Valencia Street, east side, from 60 feet to 119 feet north of the northern crosswalk at Duncan Street (59-foot bike share station) (Supervisor Distri…2 Feb 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES 18th Street, north side, from 82 feet to 101 feet west of Guerrero Street (Supervisor District 8) (Approvable by the City Traffic Engineer) Jason Hyde, [staff email remove…8 Dec 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approving a center-running protected bikeway and traffic modifications using reversible and/or adjustable elements and curb regulations to provide more access for people and goods on Valencia Street between 15th and 23rd…4 Apr 2023 · SFMTA Board · ADOPTED — 6 ayes (Resolution 230404-029)
- Approving various routine parking and traffic modifications on Valencia Street, Mission Street, 26th Street, Oakdale Avenue, Kimball Place, and Spear Street2 Aug 2022 · SFMTA Board · ADOPTED — 4 ayes (Resolution 220802-074)
- Hearing of persons interested in or objecting to the determination of exemption from environmental review under the California Environmental Quality Act issued as a Statutory Exemption by the Planning Department on June …13 Sep 2021 · Board of Supervisors · Filed without a hearing
- RESCIND – GENERAL METERED PARKING ESTABLISH – NO PARKING ANYTIME EXCEPT BICYCLES (BIKE CORRAL) Valencia Street, west side, from 10 feet to 30 feet north of 19th Street (removes general metered space #770) (Approvable by …3 Sep 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Approving a parking protected bikeway and parking and traffic modifications, along Valencia Street between Market and 15th streets as part of the Valencia Street Improvement Project as follows Approving a parking protect…16 Jun 2020 · SFMTA Board · ADOPTED — 4 ayes
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.
4 other projects on these street segments
- Mission District Sewer Rehabilitation (VLLD2B)Public Works · Design · 7 shared street segments
- Valencia Bikeway ImprovementsSFMTA · Completed · 7 shared street segments
- PW Various Locations Sewer Replacement No 16Public Works · Construction · 1 shared street segment
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 1 shared street segment
How we built this: About the Data