Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

PW Various Locations Sewer Replacement No 18

0% in published scope

Public Works · Sewer, water or power · Construction · Under way, ends 26 Oct 2026

All 2 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
19th St, 20th St, 21st St, 24th Ave, 24th St, 25th St
Planned bikeway
Shared street, 0.3 mi on Kansas St, Scott St
Would reach
1,574 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 2 street segments that lack one. Closer in: 1,261 residents with none within about one block (440 feet) today would have one; 1,643 residents with none within about two blocks (880 feet) today would have one
Scope
“WW-730, 2255i”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionJun 2025Oct 2026
Records
SFPUC contract page (WW-730 Various Locations Sewer Replacement No. 18) · Interagency coordination feed record (DataSF row)

City decisions naming this project

4 decisions on the same streets, not naming this project

Construction on these street segments

202420252026202720282029203020312032todayPW Various Locations Sewer Replaceme…PW Various Locations Sewer Replaceme…WD-2934 16-, 12- and 8-inch Ductile …Street Resurfacing Program- BBSR Pav…WD-2922: 8-inch Ductile Iron Water M…Various Locations Pavement Renovatio…Various Locations Sewer Replacement …Various Locations Pavement Renovatio…PW Various Locations Sewer Replacement No 17: construction 14 Nov 2024 to 15 Nov 2026WD-2934 16-, 12- and 8-inch Ductile Iron Water Main Replacement on Andover to Nevada St from Tompkins to Crescent Ave: construction 21 Apr 2025 to 31 Dec 2029Street Resurfacing Program- BBSR Paving FY 26-27: construction 1 Jul 2026 to 7 Jul 2027WD-2922: 8-inch Ductile Iron Water Main Replacement on Lincoln Way and Irving St from Sunset Blvd to 19th Ave and Various Side Streets: construction 7 Aug 2026 to 29 Sep 2030Various Locations Pavement Renovation No 87: construction 13 Mar 2027 to 26 May 2028Various Locations Sewer Replacement No 39: construction 15 May 2028 to 14 Nov 2029Various Locations Pavement Renovation No 99: construction 28 Mar 2030 to 10 Jun 2031PW Various Locations Sewer Replacement No 18: construction 25 Jun 2025 to 26 Oct 202625 Jun 2025 – 26 Oct 202614 Nov 2024 – 15 Nov 20261 Jul 2026 – 7 Jul 202713 Mar 2027 – 26 May 202815 May 2028 – 14 Nov 202928 Mar 2030 – 10 Jun 203121 Apr 2025 – 31 Dec 20297 Aug 2026 – 29 Sep 2030

Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.

8 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.