Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
PW Various Locations Sewer Replacement No 18
0% in published scope
Public Works · Sewer, water or power · Construction · Under way, ends 26 Oct 2026
All 2 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 19th St, 20th St, 21st St, 24th Ave, 24th St, 25th St
- Planned bikeway
- Shared street, 0.3 mi on Kansas St, Scott St
- Would reach
- 1,574 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 2 street segments that lack one. Closer in: 1,261 residents with none within about one block (440 feet) today would have one; 1,643 residents with none within about two blocks (880 feet) today would have one
- Scope
- “WW-730, 2255i”
- Dates
Start End Public consultation not published not published Construction Jun 2025 Oct 2026 - Records
- SFPUC contract page (WW-730 Various Locations Sewer Replacement No. 18) · Interagency coordination feed record (DataSF row)
City decisions naming this project
- Award Contract No. WW-730, Various Locations Sewer Replacement No. 18 to A. Ruiz Construction Co. & Associates, Inc., in the amount of $7,745,522 and with a duration of 480 consecutive calendar days (approximately one ye…24 Jun 2025 · SFPUC Commission · approve the Consent Calendar
4 decisions on the same streets, not naming this project
- Accept work performed by M. Squared Construction, Inc., under Contract No. WD- 2896, 12-Inch Ductile Iron Water Main Installation on Webster Street from Grove Street to Eddy Street; approve Modification No. 3 (Final) dec…10 Nov 2025 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – NO STOPPING ANY TIME, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 24th Avenue, west side, from 10 feet to 73 feet north of Quintara Street (63-foot station) (Supervisor District 4) (Approvable by the City …20 Sep 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase of up to 214 calendar days (approximately seven months) to the contract duration contingency for Contract No. WW-704, Various Locations Sewer Replacement No. 9, with JDB and Sons Construction, Inc., f…12 Mar 2024 · SFPUC Commission · approve the Consent Calendar
- Award Contract No. WD-2896, 12-Inch Ductile Iron Water Main Installation on Webster Street from Grove Street to Eddy Street, to the responsible bidder that submitted the lowest responsive bid, M. Squared Construction, In…9 Jan 2024 · SFPUC Commission · approve items 6a through 6i
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.
8 other projects on these street segments
- Various Locations Pavement Renovation No 87Public Works · Design · 5 shared street segments
- WD-2934 16-, 12- and 8-inch Ductile Iron Water Main Replacement on Andover to Nevada St from Tompkins to Crescent AveSFPUC · Design · 3 shared street segments
- WD-2922: 8-inch Ductile Iron Water Main Replacement on Lincoln Way and Irving St from Sunset Blvd to 19th Ave and Various Side StreetsSFPUC · Design · 3 shared street segments
- PW Various Locations Sewer Replacement No 17Public Works · Design · 3 shared street segments
- Various Locations Sewer Replacement No 39Public Works · Design · 2 shared street segments
- Street Resurfacing Program- BBSR Paving FY 26-27Public Works · Construction · 2 shared street segments
- Various Locations Pavement Renovation No 99Public Works · Planning · 2 shared street segments