Holloway Ave and Lake Merced Blvd Pavement Renovation
0% in published scope
Public Works · Repaving · Planning · Starts 29 Aug 2032, ends 12 Nov 2033
20 of the project's 28 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- Buckingham Way, Cardenas Ave, Clearfield Dr, Denslowe Dr, Font Blvd, Holloway Ave
- Planned bikeway
- Separated bikeway, 8.1 mi on Lake Merced Blvd, Holloway Ave
Shared-use path, 0.66 mi on Lake Merced Blvd
Car-free street, 0.053 mi on Tapia Dr - Would reach
- 1,715 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 20 street segments that lack one. Closer in: 762 residents with none within about one block (440 feet) today would have one; 1,868 residents with none within about two blocks (880 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation not published not published Construction Aug 2032 Nov 2033 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
3 decisions on the same streets, not naming this project
- Approve and recommend to the Board of Supervisors the conditional termination of certain sewer and water easements encumbering San Francisco Blocks 7332, 7333, 7333A, and 7333B located within Parkmerced near Lake Merced …24 May 2022 · SFPUC Commission · approve Item 14
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 230 Buckingham Way, east side, from 247 feet to 322 feet south of the midblock crosswalk at 270 Buckingham Way (75-foot bike share station in the par…5 Nov 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Holloway Avenue, north side, from 13 feet to 101 feet east of Arellano Avenue (82-foot station with red zones on either side) (Supervisor District 7)…4 Sep 2020 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Lake Merced Quick-Build ProjectSFMTA · Completed · 15 shared street segments
- PEFWS Pipeline - 36- & 42-inch Welded Steel PipeSFPUC · Design · 5 shared street segments
- Winston Drive Quick-Build ProjectSFMTA · Implementation / Construction · 5 shared street segments
- Muni Subway Expansion ProjectSFMTA · 2 shared street segments
- Parkmerced ProjectSFMTA · Planning · 2 shared street segments
- Various Locations Sewer Replacement No 38Public Works · Design · 2 shared street segments
- Sunset Irrigation Recycled WaterPublic Works · Design · 1 shared street segment
- District 11-Wide Traffic Calming ProjectSFMTA · 1 shared street segment