SF WorksMobility Improving The Bike Network Improving The Bike NetworkSafer School Trips Current Repaving Projects Other Bike PlansCurrent Repaving Projects

Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

Various Locations Sewer Replacement No 28

0% in published scope

Public Works · Sewer, water or power · Design · Starts 1 Mar 2027, ends 21 Aug 2028

Early enough to change: Public Works gives its phase as Design. No meeting on it is posted for the next 60 days.

4 of the project's 5 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
21st St, 22nd St, 23rd St, Coleridge St, Collingwood St, Corbett Ave
Planned bikeway
Shared street, 0.43 mi on Shotwell St, Corbett Ave
Bikeway of undecided type, 0.24 mi on 22nd St
Level 3 shared street, 0.082 mi on Stoneman St
Would reach
2,599 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 4 street segments that lack one. Closer in: 3,986 residents, 1 school with none within about one block (440 feet) today would have one; 2,907 residents with none within about two blocks (880 feet) today would have one
Scope
“2508i, WW-775”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionMar 2027Aug 2028
Records
Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

5 decisions on the same streets, not naming this project

Construction on these street segments

20242025202620272028202920302031todayVarious Locations Sewer Replacement …Contract 36 Traffic Signal Modificat…PW Various Locations Sewer Replaceme…Street Resurfacing Program- BBSR Pav…PW StreetResurfacingPro-BBSR Pavemen…2021-003 8-inch Ductile Iron Water M…Contract 36 Traffic Signal Modifications: construction Apr 2024 to 31 May 2026PW Various Locations Sewer Replacement No 16: construction 8 Sep 2025 to 9 Feb 2027Street Resurfacing Program- BBSR Paving FY 26-27: construction 1 Jul 2026 to 7 Jul 2027PW StreetResurfacingPro-BBSR Pavement Prese FY 26-27: construction 1 Jul 2026 to 7 Jul 20272021-003 8-inch Ductile Iron Water Main Replacement on Diamond St from 25th to 27th Street and Various Side Streets: construction 1 Dec 2028 to 30 Jun 2030Various Locations Sewer Replacement No 28: construction 1 Mar 2027 to 21 Aug 20281 Mar 2027 – 21 Aug 2028Apr 2024 – 31 May 20268 Sep 2025 – 9 Feb 20271 Jul 2026 – 7 Jul 20271 Jul 2026 – 7 Jul 20271 Dec 2028 – 30 Jun 2030

Construction start and end as each department publishes them; a dot where only one is published. 3 other projects on these street segments publish no construction dates.

8 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.