Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
WD-2923 (formerly WD-2764): 24-inch Water Main Rehabilitation from University Mound Reservoir to 3rd St
0% in published scope
SFPUC · Sewer, water or power · Construction · Under way, ends 1 Jun 2027
All 4 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- Bacon St, Egbert Ave, Neptune St, Phelps St, Thornton Ave, Williams Ave
- Planned bikeway
- Shared street, 0.3 mi on Williams Ave
- Would reach
- 2,077 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 4 street segments that lack one. Closer in: 1,830 residents with none within about one block (440 feet) today would have one; 3,427 residents with none within about two blocks (880 feet) today would have one
- Scope
- “Rehabilitating 24-inch on Bacon Street from San Bruno Ave to Bowdoin, Phelps from Egbert to Williams St, and on Williams from Phelps to 3rd St”
- Dates
Start End Public consultation not published not published Construction Dec 2024 Jun 2027 - Sources disagree
- The coordination feed gives construction starting 2024-12-16; SFPUC's project page text gives 2026-07 (“July 2026”).
The coordination feed gives construction ending 2027-06-01; SFPUC's project page text gives 2027-10 (“October 2027”). - Records
- SFPUC project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
- Award Contract No. WD-2923, 24-Inch Water Main Rehabilitation from University Mound Reservoir South to 3rd Street, to the responsible bidder that submitted the lowest responsive bid, Cratus, Inc., in the amount of $10,18…24 Feb 2026 · SFPUC Commission · approve the Consent Calendar
3 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 3rd Street, east side, from 42 feet to 116 feet south of the crosswalk at King Street (74-foot bike share station) (Supervisor District 6) (Approvab…5 Apr 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH - NO PARKING ANYTIME EXCEPT BICYCLES 3rd Street, east side, from 390 feet to 420 feet north of 23rd Street (Supervisor District 10) (Approvable by the City Traffic Engineer) Pallavi Panyam, [staff email removed…4 Jun 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- ESTABLISH – SIDEWALK BIKE SHARE STATION Egbert Avenue, north side, from Jennings Street to 72 feet easterly (70-foot bike share station) (Supervisor District 10) Laura Stonehill, [staff email removed — see the order] Pro…1 Nov 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published.
3 other projects on these street segments
- Bayview Community Based Transportation PlanSFMTA · Planning · 13 shared street segments
- PW StreetResurfacingPro-BBSR Pavement Prese FY 26-27Public Works · Construction · 5 shared street segments
- Various Locations Sewer Replacement No 39Public Works · Design · 1 shared street segment