Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
PEFWS Pipeline Contract F- 24-Inch Water
Already built
SFPUC · Sewer, water or power · Planning · Starts 1 Jan 2028, ends 1 Jan 2030
2 of the project's 3 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 25th Ave, 27th Ave, 30th Ave, Lawton St, Ortega St
- Planned bikeway
- Shared street, 0.35 mi on Ortega St
- Would reach
- No one new would be within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 2 street segments that lack one. Closer in: 158 residents (2020 census) with none within about two blocks (880 feet) today would have one
- Scope
- “None”
- Dates
Start End Public consultation not published not published Construction Jan 2028 Jan 2030 - Sources disagree
- The coordination feed gives construction starting 2028-01-01; SFPUC's project page text gives 2027 (“2027”).
- Records
- SFPUC project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
5 decisions on the same streets, not naming this project
- ESTABLISH – RED ZONE ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES 25th Avenue North, north side, from 6 feet to 30 feet east of driveway at 4 25th Avenue North (Supervisor District 1) (Approvable by the City Traffic …18 Apr 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Award Grant Agreement No. PRO.0300 (G), Demonstration Garden Programming and Maintenance to Earth Island Institute, acting as the fiscal sponsor for Garden for the Environment, to operate a public demonstration garden an…11 Mar 2025 · SFPUC Commission · approve the Consent Calendar Item Nos. 6a, 6b, and 6c
- Award Contract No. WD-2844, 12-Inch Ductile Iron Water Main Installation on Parnassus Avenue, from Stanyan Street to 6th Avenue, on Lawton Street from 7th Avenue to Funston Avenue, and Various Street Locations, to the re…24 Sep 2024 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Ortega Street, south side, from 38 feet to 107 feet east of 40th Avenue (62-foot bike share station with red zones on either end) (Supervisor Distric…6 Jan 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Ortega Street, south side, from 38 feet to 107 feet east of 40th Avenue (62-foot bike share station with red zones on either end) (Supervisor Distric…18 Feb 2022 · Engineering hearing · Item withdrawn.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.
8 other projects on these street segments
- Sunset Irrigation Recycled WaterPublic Works · Design · 3 shared street segments
- WD-2922: 8-inch Ductile Iron Water Main Replacement on Lincoln Way and Irving St from Sunset Blvd to 19th Ave and Various Side StreetsSFPUC · Design · 3 shared street segments
- Central Sunset 6other · Planning · 3 shared street segments
- Various Locations Sewer Replacement No 37Public Works · Design · 3 shared street segments
- Noriega St and Quintara St Pavement RenovationPublic Works · Planning · 2 shared street segments
- WD-2877 As Needed Water Main Replacement No.3SFPUC · Design · 2 shared street segments
- Various Locations Sewer Replacement No 30Public Works · Design · 2 shared street segments
- PEFWS Pipeline Contract E - 24-inch GGP CrossingSFPUC · Planning · 1 shared street segment