Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
FASIP - Western SOMA and Northern Mission District Sewer System
0% in published scope
SFPUC · Sewer, water or power · Design · Under way, ends 31 Jan 2027
The project's one street segment on a planned bikeway street already has an all-ages bikeway.
- Streets
- 11th St, 14th St, Erie St
- Planned bikeway
- Separated bikeway, 0.24 mi on 11th St
- Scope
- “Categorical exemption”
- Dates
Start End Public consultation December 2 December 2 Construction Feb 2026 Jan 2027 - Sources disagree
- The coordination feed gives construction starting 2026-02-01; SFPUC's project page text gives 2023 (“late 2023”).
The coordination feed gives construction ending 2027-01-31; SFPUC's project page text gives 2030 (“2030”).
The start date has passed (2026-02-01) while the phase is still Design, per the coordination feed. - Records
- SFPUC project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
2 decisions on the same streets, not naming this project
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES 14th Street, north side, from 37 feet to 53 feet east of Woodward Street (for 16-foot corral) 12(b). RESCIND – RED ZONE 14th Street, north side, from Woodward Street to 10…4 Sep 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – BLUE ZONE 11th Street, west side, from 15 feet to 40 feet south of Folsom Street 11(b). ESTABLISH – GENERAL LOADING ZONE, 5 MIN, AT ALL TIMES, DAILY Folsom Street, south side, from 56 feet to 116 feet west of…2 Aug 2024 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Western SOMA and Northern Mission Districts Sewer Replacement WW-719DPublic Works · Design · 14 shared street segments
- Various Locations Pavement Renovation No 87Public Works · Design · 6 shared street segments
- Various Locations Pavement Renovation Under Overhead Contact System No 4Public Works · Planning · 5 shared street segments
- PW FOLSOM AREA STORMWATER IMPROVEMENT PROJECTPublic Works · Design · 3 shared street segments
- 11th Street Safety Improvements ProjectPublic Works · Planning · 3 shared street segments
- Shotwell Slow StreetSFMTA · 2 shared street segments
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 1 shared street segment
- Slow StreetsSFMTA · Construction · 1 shared street segment