Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Contract 65 New Traffic Signals
Not stated
SFMTA · Bike, walk or safety · Legislated · Under way, ends 30 Nov 2025
8 of the project's 15 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA lists it as a bike project, but does not say whether it builds that bikeway.
- Streets
- Sloat Blvd, Alemany Blvd, Skyline Blvd, Kezar Dr, 3rd Ave, Division St
- Planned bikeway
- Separated bikeway, 2.3 mi on Sloat Blvd, Alemany Blvd, Skyline Blvd, Division St
Shared street, 0.27 mi on 3rd Ave, Oakdale Ave
Shared-use path, 0.21 mi on Kezar Dr - Would reach
- 30 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 8 street segments that lack one. Closer in: 697 residents with none within about one block (440 feet) today would have one; 14 residents with none within about two blocks (880 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation not published not published Construction Fall 2022 - Fall 2025 Nov 2025 - Sources disagree
- Public Works' page gives its status as In progress; SFMTA's project layer gives Legislated.
The published end date, 2025-11-30, has passed; SFMTA's page still gives it as Implementation / Construction; SFMTA's project layer still gives it as Legislated. - Records
- SFMTA project page · Public Works project page (Contract No. 65 New Traffic Signals)
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
3 milestones and events from the project's own page
- ConstructionFall 2022 - Fall 2025 · Project page timeline · Pending
- Solicit Bids from ContractorsSummer 2022 - Fall 2022 · Project page timeline · Completed
- DesignSpring 2019 - Summer 2022 · Project page timeline · Completed
18 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKESHARE STATION Sloat Boulevard, south side, from 47th Avenue to 57 feet westerly (in the buffer adjacent to the two- way bikeway) (Supervisor District 7) (Approvabl…12 Jun 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approving protected bikeway and traffic modifications on Lincoln Way and Sloat Boulevard, endorsing the closure of the Upper Great Highway and adopting the closure and findings of Proposition K3 Dec 2024 · SFMTA Board · ADOPTED — 5 ayes, 1 nay (Resolution 241203-134)
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Sloat Boulevard, north side, from 10 feet to 20 feet east of 45th Avenue (Supervisor District 4 and 7) (Approvable by the City Traffic Engineer) Grant Brokl, [staff email …17 May 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase of 115 calendar days to the contract duration contingency for Contract No. WW-684, 45th, 46th, 47th Aves, Vicente and, Wawona Streets, and Sloat Blvd Sewer Replacement, with Precision Engineering, Inc…26 Mar 2024 · SFPUC Commission · approve items 6a through 6e
- ESTABLISH – CLASS IV BIKEWAY Sloat Boulevard, eastbound and westbound, from 47th Avenue to Skyline Boulevard (two-way protected bikeway on south side of roadway)* 10(b). RESCIND – CLASS II BIKEWAY Sloat Boulevard, eastbo…16 Jun 2023 · Engineering hearing · Lengthened and relocated taxi zone and adjusted passenger loading and blue zone locations based on public hearing feedback. Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- Approve the plans and specifications and award Contract No. WW-684, 45th, 46th, 47th Aves, Vicente, Wawona Streets and Sloat Blvd. Sewer Replacement, in the amount of $7,342,613, and with a duration of 375 consecutive ca…8 Nov 2022 · SFPUC Commission · approve the Consent Calendar, with the amendment to the date on the
- ESTABLISH – TRAFFIC SIGNAL 39th Avenue, Skyline Boulevard, and Sloat Boulevard (Supervisor Districts 4 and 7) (Approvable by the City Traffic Engineer) Corbin Skerrit, [staff email removed — see the order] A new traffic …23 Sep 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase of $2,250,000 to the contract cost contingency, and an increase of 180 consecutive calendar days to the contract duration contingency for Contract No. WW-712, New Montgomery, Jessie, Minna, and Missio…8 Feb 2022 · SFPUC Commission · approve Item 10
- Accept work performed by JDB & Sons Construction for Contract No. WW-611, Cutler Avenue, Lower Great Highway, Sloat Boulevard, and Wawona Street Sewer Replacement; approve Modification No. 6 (Final) decreasing the contra…23 Nov 2021 · SFPUC Commission · approve Consent Calendar items 10a, 10c, 10d, and 10e
- ESTABLISH – ESTABLISH - RIGHT LANES MUST TURN RIGHT ESTABLISH – NO LEFT TURNS, NO U-TURNS ESTABLISH – NO RIGHT TURN ON RED Lincoln Way, westbound at Upper Great Highway (Approvable by the City Traffic Engineer) 16(b). ES…4 Jun 2021 · Engineering hearing · Continued.
- Authorize the General Manager to execute a Project Partnership Agreement with the Army Corps of Engineers (ACOE) for the construction of the Ocean Beach Beneficial Use of Dredged Materials Project to place sand dredged f…23 Feb 2021 · SFPUC Commission · approve Consent Item 22
- Accept work performed by Marinship Development Interest, LLC, for Contract No. WW-694, Lincoln Way/48th Ave Diversion Structure Modification; approve Modification No. 1 (Final), decreasing the contract amount by $7,400, …9 Feb 2021 · SFPUC Commission · approve Consent Calendar items 9a through 9d
- Amending Transportation Code, Division II, Section 702 to reduce the speed limit on Market Street between Franklin Street and Steuart Street - designate a transit-only lane on Market Street RESCIND - RIGHT TURN ONLY, EXC…19 Jan 2021 · SFMTA Board · ADOPTED — 5 ayes, 2 nays
- ESTABLISH - CLASS IV BIKEWAY (TWO-WAY PROTECTED) Alemany Boulevard from Stoneybrook Ave/Cambridge Ave to Crescent Ave/Putnam Ave Installed a concrete barrier to protect the existing bikeway on Alemany Boulevard between S…8 Jan 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – TRAFFIC SIGNAL 9th Street, Division Street, and San Bruno Avenue (Supervisor Districts 6 and 10) Corbin Skerrit, [staff email removed — see the order] The proposed modification would install a new traffic sig…4 Sep 2020 · Engineering hearing · Approved by the City Traffic Engineer to send to the SFMTA Board for approval and implementation.
- Resolution approving the First Amendment to the Freeway Maintenance Agreement between the City and County of San Francisco and the California Department of Transportation, to include City's maintenance of bicycle lanes a…9 Jun 2020 · Board of Supervisors · Passed
- ESTABLISH – CLASS IV BIKEWAY (PARKING PROTECTED BIKEWAY) Division Street, eastbound, south side, between San Bruno Avenue and Vermont Street (curbside bike lane with buffer and floating parking) Division Street, westboun…21 Feb 2020 · Engineering hearing · Approved by the City Traffic Engineer to send to SFMTA Board for legislation. # footnote applies to item 12(c). Public Comments: No comments received.
- Hearing of persons interested in or objecting to a Statutory Exemption by the Planning Department under the California Environmental Quality Act issued September 1, 2022, for the proposed Municipal Transportation Agency …Undated · Board of Supervisors · Killed
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 7 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- District 11-Wide Traffic Calming ProjectSFMTA · 15 shared street segments
- Excelsior Neighborhood Traffic Calming ProjectSFMTA · Completed · 15 shared street segments
- Alemany Corridor Safety ProjectSFMTA · Completed · 13 shared street segments
- Alemany Boulevard Infrastructure Improvements ProjectPublic Works · In progress · 7 shared street segments
- Sloat and Skyline Intersection ImprovementSFMTA · Completed · 6 shared street segments
- Division/13th Street Safety ProjectSFMTA · Completed · 5 shared street segments
- Outer Sunset Traffic Management ProjectSFMTA · Completed · 5 shared street segments
- Lincoln Way Pavement RenovationPublic Works · Planning · 4 shared street segments