Parkmerced Project
Not stated
SFMTA · Bike, walk or safety · Planning · No start date published, no end date published
46 of the project's 52 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA lists it as a bike project, but does not say whether it builds that bikeway.
- Streets
- Lake Merced Blvd, Brotherhood Way, Vidal Dr, Gonzalez Dr, Font Blvd, Holloway Ave
- Planned bikeway
- Shared-use path, 4.3 mi on Lake Merced Blvd, Gonzalez Dr, Font Blvd, Vidal Dr
Separated bikeway, 2 mi on Brotherhood Way, Holloway Ave, Font Blvd
Shared street, 0.72 mi on Vidal Dr, Juan Bautista Cir, Garces Dr, Junipero Serra Blvd
Car-free street, 0.097 mi on Tapia Dr, Bucareli Dr - Scope
- None published.
- Records
- No SFMTA page for this project (sfmta.com answers “Content Not Found”, HTTP 403: Forbidden, though its project layer still lists one); closest official source: SF Planning, Parkmerced
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
3 decisions on the same streets, not naming this project
- Approve and recommend to the Board of Supervisors the conditional termination of certain sewer and water easements encumbering San Francisco Blocks 7332, 7333, 7333A, and 7333B located within Parkmerced near Lake Merced …24 May 2022 · SFPUC Commission · approve Item 14
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Holloway Avenue, north side, from 13 feet to 101 feet east of Arellano Avenue (82-foot station with red zones on either side) (Supervisor District 7)…4 Sep 2020 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Arballo Drive, west side, from 115 feet to 195 feet north of Garces Drive (73-foot bike share station with red zones on either side) (Supervisor Dist…12 Jun 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 3 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Muni Subway Expansion ProjectSFMTA · 7 shared street segments
- Lake Merced Quick-Build ProjectSFMTA · Completed · 6 shared street segments
- Brotherhood Way Pavement RenovationPublic Works · Planning · 5 shared street segments
- PEFWS Pipeline - 36- & 42-inch Welded Steel PipeSFPUC · Design · 3 shared street segments
- Holloway Ave and Lake Merced Blvd Pavement RenovationPublic Works · Planning · 2 shared street segments
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 1 shared street segment
- Various Locations Pavement Renovation No 68Public Works · Construction · 1 shared street segment
- District 11-Wide Traffic Calming ProjectSFMTA · 1 shared street segment