Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

Dogpatch-Central Waterfront Area Transit Connections Study

0% in published scope

SFMTA · Bike, walk or safety · Current · No start date published, no end date published

115 of the project's 157 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA's page for it names no bike work.

Streets
Mariposa St, 4th St, Illinois St, 17th St, Kansas St, 16th St
Planned bikeway
Separated bikeway, 10 mi on Illinois St, 17th St, 16th St, Terry A Francois Blvd
Shared street, 5.7 mi on Kansas St, 22nd St, Indiana St, Maryland St
Bikeway of undecided type, 2 mi on 4th St, Mission Bay Blvd South, Mission Bay Blvd North
Level 3 shared street, 1.9 mi on Mariposa St, Connecticut St, Kansas St
Scope
None published.
Dates
StartEnd
Public consultationWinter - Spring 2018Winter - Spring 2018
Constructionnot publishednot published
Sources disagree
The project page's timeline and event cards give the latest public consultation as 2018-05-31; the page's text gives 2018-11 (“November 2018”).
Records
SFMTA project page

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

4 milestones and events from the project's own page
20 decisions on the same streets, not naming this project

Construction on these street segments

20252026202720282029203020312032203320342035todayWW-779 Various Locations Sewer Repla…WD-2919: 8- and 12-Inch Ductile Iron…Mission Bay Blvd Quick-Build Project16th St, 17th St, and 18th St Paveme…WW-779 Various Locations Sewer Replacement No. 32: construction 2 Jun 2025 to 29 Oct 2027WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side Streets: construction 13 Apr 2026 to 9 Dec 2027Mission Bay Blvd Quick-Build Project: construction Jul 2026 to 31 Aug 202616th St, 17th St, and 18th St Pavement Renovation: construction 30 Aug 2033 to 13 Nov 20342 Jun 2025 – 29 Oct 202713 Apr 2026 – 9 Dec 2027Jul 2026 – 31 Aug 202630 Aug 2033 – 13 Nov 2034

Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.

8 other projects on these street segments
4 documents on the project page

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.