Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Dogpatch-Central Waterfront Area Transit Connections Study
0% in published scope
SFMTA · Bike, walk or safety · Current · No start date published, no end date published
115 of the project's 157 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA's page for it names no bike work.
- Streets
- Mariposa St, 4th St, Illinois St, 17th St, Kansas St, 16th St
- Planned bikeway
- Separated bikeway, 10 mi on Illinois St, 17th St, 16th St, Terry A Francois Blvd
Shared street, 5.7 mi on Kansas St, 22nd St, Indiana St, Maryland St
Bikeway of undecided type, 2 mi on 4th St, Mission Bay Blvd South, Mission Bay Blvd North
Level 3 shared street, 1.9 mi on Mariposa St, Connecticut St, Kansas St - Scope
- None published.
- Dates
Start End Public consultation Winter - Spring 2018 Winter - Spring 2018 Construction not published not published - Sources disagree
- The project page's timeline and event cards give the latest public consultation as 2018-05-31; the page's text gives 2018-11 (“November 2018”).
- Records
- SFMTA project page
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
4 milestones and events from the project's own page
- Report Back to Community on FindingsSummer 2018 · Project page timeline · Pending
- Dogpatch Transit Connections Open House6 Mar 2018 · Project page event
- Community Input and SurveyWinter - Spring 2018 · Project page timeline · Completed
- Transportation Data AnalysisFall 2017 - Winter 2018 · Project page timeline · Completed
20 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKESHARE STATION Owens Street, west side, from Gene Friend Way to 57 feet northerly (Supervisor District 6) (Approvable by the City Traffic Engineer)4 Sep 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – GENERAL METERED PARKING, NO TIME LIMIT, 9AM TO 6PM MONDAY THROUGH SATURDAY Arkansas Street, both sides, from 16th Street to 200 feet southerly 7(b). ESTABLISH – RESIDENTIAL PERMIT PARKING AREA X (Eligibility …26 Jun 2026 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- Award Contract No. WW-790, Evans Ave. and Mariposa St. Outfalls Improvements, to the responsible bidder that submitted the lowest responsive bid, Pullman SST, Inc., in the amount of $2,576,348, with a duration of 379 con…9 Sep 2025 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Wisconsin Street, west side, from 6 feet to 16 feet north of Coral Road (Supervisor District 10) (Approvable by the City Traffic Engineer) Grant Brokl, [staff email remove…16 May 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Award Contract No. WW-757R, Laguna, Howard, and Mission Creek Combined Sewer Discharge Improvements, to the responsible bidder that submitted the lowest responsive bid, Pullman SST, Inc., in the amount of $7,296,786, wit…13 May 2025 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Wisconsin Street, east side, from 10 feet to 19 feet south of Connecticut Street (Supervisor District 10) (Approvable by the City Traffic Engineer) Grant Brokl, [staff ema…18 Apr 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES 4th Street, east side, from 10 feet to 30 feet south of Mission Rock Street (Supervisor District 6) (Approvable by the City Traffic Engineer) Grant Brokl, [staff email rem…18 Apr 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase in the amount of $2,500,000 to the cost contingency and an increase of 100 calendar days to the duration contingency for Contract No. WW-736, Castro and Mission Districts Sewer Improvements, with Prec…14 May 2024 · SFPUC Commission
- Approving parking and traffic modifications along 17th Street between Potrero Avenue and Mississippi Street to improve transportation safety and connectivity5 Mar 2024 · SFMTA Board · ADOPTED — 7 ayes (Resolution 240305-020)
- Approving bicycle, parking and traffic modifications along Bayshore Boulevard and Cesar Chavez Street associated with the Cesar Chavez/Bayshore Boulevard/U.S. 101 Project16 Jan 2024 · SFMTA Board · ADOPTED — 6 ayes (Resolution 240116-006)
- Accept work performed by M Squared Construction, Inc., under Contract No. WD-2811, 8- Inch and 16-Inch Ductile Iron Water Main Replacement on 17th Street from Clayton Street to Douglass Street and Various Side Streets; a…9 Jan 2024 · SFPUC Commission · approve items 6a through 6i
- ESTABLISH – CLASS IV BIKEWAY 17th Street, eastbound and westbound, between Potrero Avenue and Mississippi Street (Approvable by the City Traffic Engineer) 4(b). ESTABLISH – STOP SIGNS 17th Street, eastbound and westbound…1 Sep 2023 · Engineering hearing · Item 4(a) corrected to reflect approvability by the City Traffic Engineer. Item 4(c) updated to TOW AWAY NO STOPPING ANY TIME as originally proposed. Items 4(a) through 4(s) approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- Accept work performed by Cratus, Inc. under Contract No. WD-2739, Pavement Renovation, Sewer Replacement, and Water Main Replacement on Castro Street and 26th Street, for a total contract amount of $15,404,492, and with …27 Jun 2023 · SFPUC Commission · approve the Consent Calendar
- Award Contract No. WD-2801, 8- and 12-Inch Ductile Iron Water Main Replacement, 16- Inch Earthquake Resistant Ductile Iron Water Main Installation, Sewer Replacement, and Pavement Renovation, from Mariposa Street to Cesa…14 Feb 2023 · SFPUC Commission · approve Consent Calendar items 6a through 6h
- ESTABLISH – RED ZONE A. 25th Street, south side, from Connecticut Street to 29 feet easterly (removes 1 parking space) B. 25th Street, south side, from 184 feet to 306 feet east of Connecticut Street (removes 6 parking s…8 Jul 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation. # (only 16(b) is reviewable by BOS)
- Approve an increase of 30 consecutive calendar days to the contract duration contingency for Contract No. WW-703, Mission Street, 16th to Cesar Chavez Street, Brick Sewer Rehabilitation; and authorize the General Manager…14 Dec 2021 · SFPUC Commission · approve Consent Calendar items 10a through 10g
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 4th Street, west side, from Gene Friend Way to 103 feet northerly (92-foot bike share station with red zones on each side of the station) (Supervisor…5 Nov 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Accept work performed by Mitchell Engineering for Contract No. WD-2719, 8-Inch Ductile Iron Pipe and 12-Inch Earthquake Resistant Ductile Iron Pipe Water Main Installation on 22nd Street from Fair Oaks Street to Hampshir…24 Aug 2021 · SFPUC Commission · approve Item 10
- ESTABLISH - NO PARKING ANYTIME EXCEPT BICYCLES 3rd Street, east side, from 390 feet to 420 feet north of 23rd Street (Supervisor District 10) (Approvable by the City Traffic Engineer) Pallavi Panyam, [staff email removed…4 Jun 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Approving temporarily prohibiting the use of northbound 4th Street between Berry and Channel Streets by all vehicles other than transit, buses, bicycles, taxis, and emergency vehicles RESCIND -NO THROUGH TRAFFIC AFTER BA…5 Jan 2021 · SFMTA Board · ADOPTED — 5 ayes
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side StreetsSFPUC · Design · 41 shared street segments
- Train Control Upgrade Project - Phase 1Public Works · Design · 20 shared street segments
- Terry Francois Boulevard Quick-BuildSFMTA · Completed · 19 shared street segments
- 3rd St from Mariposa St to Palou Ave Pavement RenovationPublic Works · Planning · 18 shared street segments
- Mission Bay Blvd Quick-Build ProjectSFMTA · Implementation / Construction · 18 shared street segments
- WW-779 Various Locations Sewer Replacement No. 32Public Works · Design · 14 shared street segments
- 16th St, 17th St, and 18th St Pavement RenovationPublic Works · Planning · 12 shared street segments
- Minnesota Slow StreetSFMTA · Legislated · 11 shared street segments