PW Various Locations Sewer Replacement No 21
Already built
Public Works · Sewer, water or power · Design · Starts 2 Oct 2026, ends 2 Oct 2027
All 3 of the project's street segments on planned bikeway streets already have an all-ages bikeway.
- Streets
- 15th Ave, 16th Ave, 19th Ave, 28th Ave, 34th Ave, 36th Ave
- Planned bikeway
- Shared street, 0.5 mi on 34th Ave, Cabrillo St
- Scope
- “2469i”
- Dates
Start End Public consultation not published not published Construction Oct 2026 Oct 2027 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
4 decisions on the same streets, not naming this project
- Award Grant Agreement No. PRO.0300 (G), Demonstration Garden Programming and Maintenance to Earth Island Institute, acting as the fiscal sponsor for Garden for the Environment, to operate a public demonstration garden an…11 Mar 2025 · SFPUC Commission · approve the Consent Calendar Item Nos. 6a, 6b, and 6c
- Award Contract No. WD-2844, 12-Inch Ductile Iron Water Main Installation on Parnassus Avenue, from Stanyan Street to 6th Avenue, on Lawton Street from 7th Avenue to Funston Avenue, and Various Street Locations, to the re…24 Sep 2024 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 15th Avenue, north side, from 5 feet to 67 feet west of Portola Drive (62-foot bike share station) (Supervisor District 7) (Approvable by the City T…22 Mar 2024 · Engineering hearing · Item withdrawn.
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Balboa Street, south side, from 92 feet to 113 feet west of 6th Avenue (removes General Metered Parking Space #511) (Supervisor District 1) (Approvable by the City Traffic…8 Dec 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Various Locations Sewer Replacement #21Public Works · Design · 23 shared street segments
- PEFWS Pipeline Contract E - 24-inch GGP CrossingSFPUC · Planning · 3 shared street segments
- Slow StreetsSFMTA · Construction · 3 shared street segments
- PW StreetResurfacingPro-BBSR Pavement Prese FY 26-27Public Works · Construction · 2 shared street segments
- WD-2885 8-Inch Ductile Iron Water Main Replacement, Sewer Replacement, and Paving Renovation on Fulton Street from Great Highway to 31st Avenue and Various LocationsSFPUC · Design · 2 shared street segments
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 1 shared street segment
- Street Resurfacing Program- BBSR Paving FY 26-27Public Works · Construction · 1 shared street segment
- Geary BRT Sewer Improvements Phase 2Public Works · Construction · 1 shared street segment