Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Pavement Renovation No 105
0% in published scope
Public Works · Repaving · Planning · Starts 28 Oct 2033, ends 11 Jan 2035
3 of the project's 6 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 15th St, 18th St, 19th St, 20th St, 21st St, 25th St
- Planned bikeway
- Shared street, 0.27 mi on 20th St, Duncan St
Shared-use path, 0.17 mi on Brazil Ave
Level 3 shared street, 0.14 mi on Eugenia Ave - Would reach
- 3,330 residents (2020 census), 1 library would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 3 street segments that lack one. Closer in: 1,734 residents with none within about one block (440 feet) today would have one; 3,428 residents, 1 library with none within about two blocks (880 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation not published not published Construction Oct 2033 Jan 2035 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
6 decisions on the same streets, not naming this project
- ESTABLISH – SPEED CUSHIONS Noe Street, between 14th Street and Henry Street (1 3-lump cushion) Noe Street, between 15th Street and Beaver Street (1 3-lump cushion) 5(b). RESCIND – GREEN ZONE ESTABLISH – RED ZONE Noe Stre…16 Aug 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase in the amount of $2,500,000 to the cost contingency and an increase of 100 calendar days to the duration contingency for Contract No. WW-736, Castro and Mission Districts Sewer Improvements, with Prec…14 May 2024 · SFPUC Commission
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES 18th Street, north side, from 82 feet to 101 feet west of Guerrero Street (Supervisor District 8) (Approvable by the City Traffic Engineer) Jason Hyde, [staff email remove…8 Dec 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – RED ZONE A. 25th Street, south side, from Connecticut Street to 29 feet easterly (removes 1 parking space) B. 25th Street, south side, from 184 feet to 306 feet east of Connecticut Street (removes 6 parking s…8 Jul 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation. # (only 16(b) is reviewable by BOS)
- Hearing of persons interested in or objecting to the determination of exemption from environmental review under the California Environmental Quality Act issued as a Statutory Exemption by the Planning Department on June …13 Sep 2021 · Board of Supervisors · Filed without a hearing
- ESTABLISH - NO STOPPING EXCEPT BICYCLES ESTABLISH - BIKE SHARE STATION Brighton Avenue, east side, from 11 feet to 68 feet south of Ocean Avenue (53-foot station with red zones either side) (Supervisor District 7) Daniel…19 Mar 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 5 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Slow StreetsSFMTA · Construction · 6 shared street segments
- District 11-Wide Traffic Calming ProjectSFMTA · 5 shared street segments
- Dogpatch-Central Waterfront Area Transit Connections StudySFMTA · Current · 3 shared street segments
- WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side StreetsSFPUC · Design · 2 shared street segments
- Mission District Sewer Rehabilitation (VLLD2B)Public Works · Design · 2 shared street segments
- Noe Slow Street and Duboce Triangle Planning StudySFMTA · Planning · 2 shared street segments
- Excelsior Neighborhood Traffic Calming ProjectSFMTA · Completed · 2 shared street segments
- Valencia Bikeway ImprovementsSFMTA · Completed · 1 shared street segment