SF WorksMobility Improving The Bike Network Improving The Bike NetworkSafer School Trips Current Repaving Projects Other Bike PlansCurrent Repaving Projects

Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

Various Locations Pavement Renovation No 105

0% in published scope

Public Works · Repaving · Planning · Starts 28 Oct 2033, ends 11 Jan 2035

Early enough to change: Public Works gives its phase as Planning; its project page may list a contact. No meeting on it is posted for the next 60 days.

3 of the project's 6 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
15th St, 18th St, 19th St, 20th St, 21st St, 25th St
Planned bikeway
Shared street, 0.27 mi on 20th St, Duncan St
Shared-use path, 0.17 mi on Brazil Ave
Level 3 shared street, 0.14 mi on Eugenia Ave
Would reach
3,330 residents (2020 census), 1 library would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 3 street segments that lack one. Closer in: 1,734 residents with none within about one block (440 feet) today would have one; 3,428 residents, 1 library with none within about two blocks (880 feet) today would have one
Scope
None published.
Dates
StartEnd
Public consultationnot publishednot published
ConstructionOct 2033Jan 2035
Records
Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

6 decisions on the same streets, not naming this project

Construction on these street segments

202520262027202820292030203120322033203420352036todayVarious Locations Pavement Renovatio…Noe Slow Street and Duboce Triangle …WD-2919: 8- and 12-Inch Ductile Iron…Mission District Sewer Rehabilitatio…Noe Slow Street and Duboce Triangle Planning Study: construction Jul 2025 to 30 Nov 2025WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side Streets: construction 13 Apr 2026 to 9 Dec 2027Mission District Sewer Rehabilitation (VLLD2B): construction 7 Jun 2027 to 6 Jun 2028Various Locations Pavement Renovation No 105: construction 28 Oct 2033 to 11 Jan 2035Jul 2025 – 30 Nov 202513 Apr 2026 – 9 Dec 20277 Jun 2027 – 6 Jun 202828 Oct 2033 – 11 Jan 2035

Construction start and end as each department publishes them; a dot where only one is published. 5 other projects on these street segments publish no construction dates.

8 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.