Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
PW Various Locations Sewer Replacement (JV VL PR No 89)
0% in published scope
Public Works · Sewer, water or power · Design · Starts 28 Jan 2027, ends 12 Apr 2028
4 of the project's 6 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- Amazon Ave, Bacon St, Barneveld Ave, Brussels St, Burrows St, Cambridge St
- Planned bikeway
- Shared street, 0.8 mi on Somerset St, Silliman St, Cambridge St, Rolph St
- Would reach
- 7,279 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 4 street segments that lack one. Closer in: 3,669 residents, 1 school with none within about one block (440 feet) today would have one; 4,685 residents, 1 school with none within about two blocks (880 feet) today would have one
- Scope
- “2476i”
- Dates
Start End Public consultation not published not published Construction Jan 2027 Apr 2028 - Records
- Public Works contract page (Various Locations Pavement Renovation No. 89 and Sewer Replacement) · Interagency coordination feed record (DataSF row) · When the bid page closes at award, the closest official source: Public Works paving map
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Various Locations Pavement Renovation No 89Public Works · Design · 30 shared street segments
- Visitacion Valley and Portola Community Based Transportation PlanSFMTA · Planning · 11 shared street segments
- Slow StreetsSFMTA · Construction · 5 shared street segments
- Various Locations Sewer Replacement No 34Public Works · Design · 2 shared street segments
- Silver Ave Pavement RenovationPublic Works · Planning · 2 shared street segments
- District 11-Wide Traffic Calming ProjectSFMTA · 2 shared street segments
- Various Locations Sewer Replacement No 25Public Works · Design · 1 shared street segment
- Excelsior Neighborhood Traffic Calming ProjectSFMTA · Completed · 1 shared street segment
How we built this: About the Data