Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Better Market Street
Builds 6%
SFMTA · Bike, walk or safety · Current · Under way, ends 30 Apr 2025
59 of the project's 84 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA's bikeway layer and project page show it building or upgrading 0.42 mi of the plan's bikeway.
- Streets
- Market St, Valencia St, Beale St, 11th St, Grove St, Page St
- Planned bikeway
- Shared street, 5 mi on Market St, Grove St, Page St, Mccoppin St
Separated bikeway, 3.8 mi on Market St, Valencia St, Beale St, 11th St
Bikeway of undecided type, 0.16 mi on Post St, Sutter St - Would reach
- 695 residents (2020 census), 3 schools would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 59 street segments that lack one. Closer in: 1,309 residents, 1 library with none within about one block (440 feet) today would have one; 459 residents, 3 schools with none within about two blocks (880 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation May 2011 2020 Construction Jan 2023 Apr 2025 - Sources disagree
- Public Works' page gives its status as In progress; SFMTA's project layer gives Current.
The published end date, 2025-04-30, has passed; SFMTA's project layer still gives it as Current. - Not yet checked
- The latest public consultation shown, 2020-12-31, was read from the words “2020” on SFMTA's project page by a model, and a person has not confirmed it.
- Records
- SFMTA project page · Public Works project page (Better Market Street)
City decisions naming this project
- PW Better Market Street Phase 1: Extend contract duration by 158 calendar days3 Jul 2025 · Delegated contract change (Public Works) · Contract change approved by the Director
- Better Market Street Phase 1: Extend contract duration by 150 calendar days10 Feb 2025 · Delegated contract change (Public Works) · Contract change approved by the Director
- ESTABLISH - NO TURN ON RED Spear Street, northbound, at Market Street (Approvable by the City Traffic Engineer) 21(b). ESTABLISH - RIGHT TURN ONLY EXCEPT BUSES, TAXIS, COMMERCIAL VEHICLES AND BIKES Spear Street, northbou…19 Aug 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Major Capital Project Update - Better Market Street – INFORMATION*24 May 2022 · SFCTA Board
- Major Capital Project Update – Better Market Street7 Dec 2021 · SFCTA Board
15 earlier
- Major Capital Update: Better Market Street9 Nov 2021 · SFCTA Board
- Major Capital Project Update: Better Market Street13 Jul 2021 · SFCTA Board
- [Final Approval] Allocate $11,634,000, in Prop K Funds, with Conditions, to San Francisco Public Works for Better Market Street - 5th to 8th Streets23 Feb 2021 · SFCTA Board
- Allocate $11,634,000, in Prop K Funds, with Conditions, to San Francisco Public Works for Better Market Street - 5th to 8th Streets9 Feb 2021 · SFCTA Board
- Major Capital Project Update – Better Market Street10 Nov 2020 · SFCTA Board
- Major Capital Project Update - Better Market Street27 Oct 2020 · SFCTA Board
- Major Capital Project Update - Better Market Street28 Jul 2020 · SFCTA Board
- Resolution authorizing Public Works to accept and expend a grant in the amount of $15,000,000 from the United States Department of Transportation for the FY 2018 Better Utilizing Investments to Leverage Development Trans…25 Feb 2020 · Board of Supervisors · ADOPTED Pass
- Resolution authorizing Public Works to accept and expend a grant in the amount of $15,000,000 from the United States Department of Transportation for the FY 2018 Better Utilizing Investments to Leverage Development Trans…12 Feb 2020 · Board of Supervisors, Budget and Finance Committee · RECOMMENDED Pass
- Resolution authorizing Public Works to accept and expend a grant in the amount of $15,000,000 from the United States Department of Transportation for the FY 2018 Better Utilizing Investments to Leverage Development Trans…14 Jan 2020 · Board of Supervisors
- Allocate $3,330,000 in Prop K Sales Tax Funds, with Conditions, to San Francisco Public Works for Better Market Street 5th to 8th Street Design and Bikeway Pilot17 Dec 2019 · SFCTA Board
- Allocate $3,330,000 in Prop K Sales Tax Funds, with Conditions, to San Francisco Public Works for Better Market Street 5th to 8th Street Design and Bikeway Pilot10 Dec 2019 · SFCTA Board
- Approving the Better Market Street Project, including the western variant15 Oct 2019 · SFMTA Board · ADOPTED — 7 ayes
- Major Capital Project Update - Better Market Street9 Jul 2019 · SFCTA Board
- Major Capital Project Update - Better Market Street9 Apr 2019 · SFCTA Board
61 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKESHARE STATION Polk Street, west side, from Filbert Street to 32 feet northerly (Supervisor District 3) (Approvable by the City Traffic Engineer)10 Jul 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKESHARE STATION Jones Street, west side, from Sacramento Street to 35 feet northerly (Supervisor District 3) (Approvable by the City Traffic Engineer)12 Jun 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKESHARE STATION Polk Street, west side, from Clay Street to 24 feet northerly (in existing red zone) Clay Street, north side, from Polk Street to 26 feet westerly (i…22 May 2026 · Engineering hearing · Corrected approval path. Approved by the City Traffic Engineer for implementation.
- Award Contract No. WW-795, Sansome Street Outfall Improvements, to the responsible bidder that submitted the lowest responsive bid, R&S Construction Management, Inc., in the amount of $3,322,700 and with a duration of 30…9 Dec 2025 · SFPUC Commission · approve the Consent Calendar
- Approving parking regulations and amending the Transportation Code, Division II, Section 801 to extend permit-restricted parking on Turk Street near 1011 Turk Street to support the San Francisco Department of Emergency M…2 Dec 2025 · SFMTA Board · ADOPTED — 6 ayes (Resolution 251202-115)
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, north side, from 30 feet to 125 feet west of 1st Street (Supervisor District 6) (Approvable by the City Traffic Engineer)14 Nov 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Accept work performed by M. Squared Construction, Inc., under Contract No. WD- 2896, 12-Inch Ductile Iron Water Main Installation on Webster Street from Grove Street to Eddy Street; approve Modification No. 3 (Final) dec…10 Nov 2025 · SFPUC Commission · approve the Consent Calendar
- Approving parking regulations and amending Transportation Code, Division II regarding permit parking and establishing commercial loading, passenger loading, short term parking, and blue zone parking on Grove Street, Van …15 Jul 2025 · SFMTA Board · ADOPTED — 6 ayes (Resolution 250715-066)
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Taylor Street, west side, from 5 feet to 58 feet north of Sacramento Street (Supervisor District 3) (Approvable by the City Traffic Engineer)16 May 2025 · Engineering hearing · Item on hold.
- Award Contract No. WW-757R, Laguna, Howard, and Mission Creek Combined Sewer Discharge Improvements, to the responsible bidder that submitted the lowest responsive bid, Pullman SST, Inc., in the amount of $7,296,786, wit…13 May 2025 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Sutter Street, south side, from 34 feet to 128 feet east of Montgomery Street (Supervisor District 3) (Approvable by the City Traffic Engineer) Perm…4 Apr 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, west side, from 35 feet to 87 feet north of 21st Street (52-foot station) (Supervisor District 9) (Approvable by the City Traffic Eng…7 Mar 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Drumm Street, west side, from 13 feet to 53 feet north of Market Street (Supervisor District 3) (Approvable by the City Traffic Engineer)7 Feb 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase of 155 calendar days to the duration contingency for Contract No. WW-705, Various Locations Sewer Replacement No. 10, with Mitchell Engineering, for SFPUC DECEMBER 10, 2024 MEETING MINUTES Page 6 of 1…10 Dec 2024 · SFPUC Commission · approve Item 13
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Sansome Street, east side, from 20 feet to 120 feet north of Sutter Street (Supervisor District 3) (Approvable by the City Traffic Engineer)6 Dec 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – BLUE ZONE 11th Street, west side, from 15 feet to 40 feet south of Folsom Street 11(b). ESTABLISH – GENERAL LOADING ZONE, 5 MIN, AT ALL TIMES, DAILY Folsom Street, south side, from 56 feet to 116 feet west of…2 Aug 2024 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- ESTABLISH – BLUE ZONE Folsom Street, south side, from 9 feet to 31 feet east of Mabini Street Folsom Street, south side, from 7 feet to 29 feet east of Hawthorne Street 10(b). ESTABLISH – METERED YELLOW ZONE, COMMERCIAL …2 Aug 2024 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- ESTABLISH – SIDEWALK BIKE SHARE STATION Market Street, north side, from 47 feet to 107 feet east of Bush Street (Supervisor District 3) (Approvable by the City Traffic Engineer) Laura Stonehill, [staff email removed — se…19 Jul 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase of 90 calendar days to the duration contingency and increase of $200,000 to the amount contingency for Contract No. WW-705, Various Locations Sewer Replacement No. 10, with Mitchell Engineering, for a…25 Jun 2024 · SFPUC Commission
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Polk Street, east side, from 10 feet to 23 feet south of Sacramento Street (Supervisor District 3) (Approvable by the City Traffic Engineer) Grant Brokl, [staff email remo…17 May 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 3rd Street, east side, from 42 feet to 116 feet south of the crosswalk at King Street (74-foot bike share station) (Supervisor District 6) (Approvab…5 Apr 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase of 185 calendar days to the contract duration contingency for Contract No. WW-705, Various Locations Sewer Replacement No. 10, with Mitchell Engineering, for a new contract duration limit of up to 570…26 Mar 2024 · SFPUC Commission · approve items 6a through 6e
- ESTABLISH – NO PARKING ANYTIME EXCEPT BICYCLES Mission Street, west side, from 47 feet to 60 feet south of 21st Street (removes General Metered Parking Space #2506) (Supervisor District 9) (Approvable by the City Traffic…22 Mar 2024 · Engineering hearing · Item withdrawn by staff.
- Accept work performed by Pipe and Plant Solutions, Inc., under Contract No. WW-675, 5th/18th/Upper Larkin Street Sewer Inspection; approve Modification No. 2 (Final) decreasing contract amount by $10,000, for a total con…12 Mar 2024 · SFPUC Commission · approve the Consent Calendar
- RESCIND – NO STOPPING, EXCEPT BICYCLES RESCIND – BIKE SHARE STATION Folsom Street, north side, from 105 feet to 185 feet west of Main Street (80-foot bike share station) 12(b). ESTABLISH – NO STOPPING, EXCEPT BICYCLES ES…8 Mar 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Award Contract No. WD-2896, 12-Inch Ductile Iron Water Main Installation on Webster Street from Grove Street to Eddy Street, to the responsible bidder that submitted the lowest responsive bid, M. Squared Construction, In…9 Jan 2024 · SFPUC Commission · approve items 6a through 6i
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Polk Street, west side, from 9 feet to 29 feet north of Sacramento Street (removes General Metered Parking Space #1601) (Supervisor District 3) (Approvable by the City Tra…8 Dec 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Polk Street, west side, from 31 feet to 96 feet south of Bush Street (62-foot station with red zones on either side) (Supervisor District 3) (Approv…22 Sep 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO RIGHT TURN, EXCEPT BICYCLES Market Street, eastbound, at Church Street (Approvable by the City Traffic Engineer) 10(b). ESTABLISH – TYPE IV BIKE LANE Church Street, southbound, from Market Street to 200 fe…7 Jul 2023 · Engineering hearing · Item 10(a) approved by the City Traffic Engineer for implementation. Item 10(b) approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- Accept work performed by D’Arcy & Harty Construction, Inc for Contract No. WW-712, New Montgomery, Jessie, Minna, and Mission Street Brick Sewer Rehabilitation, for a total contract amount of $6,891,778, and with a total…9 May 2023 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Taylor Street, west side, from 43 feet to 122 feet south of Columbus Avenue (Supervisor District 3) (Approvable by the City Traffic Engineer) Laura S…5 May 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase of $180,000 to the contract cost contingency, and an increase of 180 calendar days to the contract duration contingency, for Contract No. WW-675, 5th/18th/Upper Larkin Street Sewer Inspection; and aut…28 Feb 2023 · SFPUC Commission · approve Consent Calendar Items 6a through 6d
- RESCIND – NO PARKING ANY TIME EXCEPT BICYCLES ESTABLISH – GENERAL METERED PARKING Mission Street, west side, from 3 feet to 24 feet south of Kingston Street (restore parking meter #3424) 8(b). ESTABLISH – NO PARKING ANY …17 Feb 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – CLASS IV BIKEWAY (PARKING PROTECTED BIKEWAY) Main Street, northbound, east side, from Folsom Street to Market Street 12(b). ESTABLISH – NO RIGHT TURN ON RED, EXCEPT BICYCLES A. Main Street, northbound, at How…17 Feb 2023 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Mason Street, west side, from Bay Street to 67 feet southerly (Supervisor District 3) (Approvable by the City Traffic Engineer) Laura Stonehill, [sta…3 Feb 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- San Francisco Public Utilities Commission Employee Retirement Recognitions: Jack Lum, in recognition for his 35 years of exemplary service to the City and County of San Francisco. Alan Marshall, Enterprise Systems Manage…24 Jan 2023 · SFPUC Commission
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 5th Street, west side, from 6 feet to 92 feet south of Howard Street (86-foot bike share station with angled plates in floating buffer) (Supervisor D…8 Apr 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Approve an increase of $2,250,000 to the contract cost contingency, and an increase of 180 consecutive calendar days to the contract duration contingency for Contract No. WW-712, New Montgomery, Jessie, Minna, and Missio…8 Feb 2022 · SFPUC Commission · approve Item 10
- Approve an increase of 30 consecutive calendar days to the contract duration contingency for Contract No. WW-703, Mission Street, 16th to Cesar Chavez Street, Brick Sewer Rehabilitation; and authorize the General Manager…14 Dec 2021 · SFPUC Commission · approve Consent Calendar items 10a through 10g
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, north side, from 106 feet to 186 feet west of Main Street (73-foot bike share station with space on either end) 20(b). RESCIND – YELLO…5 Nov 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- RESCIND - GENERAL METERED PARKING ESTABLISH - NO PARKING ANYTIME EXCEPT BICYCLES (BIKE CORRAL) Hyde Street, east side, from 69 feet to 91 feet north of Golden Gate Avenue (Supervisor District 6) (Approvable by the City T…1 Oct 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Accept work performed by Ronan Construction, Inc. for Contract No. WW-671(I), Fillmore and Haight Street Intersection, AWSS, Pavement, and Sewer Replacement; approve Modification No. 5 (Final), increasing the contract am…28 Sep 2021 · SFPUC Commission · approve the Consent Calendar items 9a and 9c
- ESTABLISH – CLASS IV PROTECTED BIKEWAY Polk Street, southbound, from Grove Street to Hayes Street (Approvable by the City Traffic Engineer) 18(b). ESTABLISH – TOW AWAY NO STOPPING ANYTIME Polk Street, west side, from Gro…3 Sep 2021 · Engineering hearing · Items (a), (c), (d) and (e) approved by the City Traffic Engineer for implementation. Item (b) approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- RESCIND – RESIDENTIAL PERMIT PARKING AREA C ESTABLISH–RESIDENTIAL PERMIT PARKING AREA G (Eligibility only, no signs) 1211 Polk Street between Bush and Sutter Streets (Supervisor District 3) (Requires approval by the SFMT…3 Sep 2021 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- Accept work performed by Cratus, Inc. for Contract No. WD-2614, 8-Inch Ductile Iron Water Main Replacement on Green Street from Gough Street to Broderick Street; approve Modification No. 2 (Final), decreasing the contrac…8 Jun 2021 · SFPUC Commission · approve the Consent Calendar 8a through 8e
- Approve the plans and specifications, and award Contract No. WW-712, New Montgomery, Jessie, Minna, and Mission Streets Brick Sewer Rehabilitation, in the amount of $4,888,750, and with a duration of 390 consecutive cale…11 May 2021 · SFPUC Commission · approve Consent Calendar items 8c, 8d, and 8g
- 12(a). ESTABLISH – CLASS IV BIKEWAY (PROTECTED BIKEWAY) Golden Gate Avenue, eastbound, south side, between Polk Street and Taylor/Market Street 12(b). ESTABLISH – NO TURN ON RED EXCEPT BICYCLES Golden Gate Avenue, eastbo…16 Apr 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. # footnote applies to items #12(d), 12(e), 12(f), 12(g), 12(h) and 12(i).
- Approve an increase of 17 calendar days to the contract duration contingency for Contract No. WW-671(I), Fillmore and Haight Street Intersection, AWSS, Pavement, and Sewer Replacement, with Ronan Construction, Inc.; and …23 Mar 2021 · SFPUC Commission · approve Consent Calendar items 9a, 9b, and 9d
- Amending Transportation Code, Division II, Section 702 to reduce the speed limit on Market Street between Franklin Street and Steuart Street - designate a transit-only lane on Market Street RESCIND - RIGHT TURN ONLY, EXC…19 Jan 2021 · SFMTA Board · ADOPTED — 5 ayes, 2 nays
- ESTABLISH -- PASSENGER LOADING ZONE, AT ALL TIMES Turk Street, south side, from 94 feet to 194 feet east of Taylor Street 16(b). ESTABLISH -- BUS STOP Turk Street, north side, from Mason Street to 150 feet westerly (shif…4 Dec 2020 · Engineering hearing · Approved by the City Traffic Engineer for implementation. # footnote applies to item 16(a).
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, south side, from 183 feet to 250 feet west of 2nd Street (66-foot bike share station) (Supervisor District 6) Pallavi Panyam, [staff e…16 Oct 2020 · Engineering hearing · Approved by the City Traffic Engineer for implementation. The Environmental Review citation, Case 2015-005492ENV, is accurate since temporary station installation and/or relocation are included in the bike share system.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Hyde Street, east side, from Post Street to 82 feet southerly (72-foot station with red zones on either side) (Supervisor District 6) Project Contact…4 Sep 2020 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Ordinance ordering the vacation of the sidewalk portion of streets on the south side of Mission Street at the intersection of Mission and Fremont Streets and on the east side of Fremont Street at the same intersection to…10 Mar 2020 · Board of Supervisors · Passed
- Hearing of the Board of Supervisors sitting as a Committee of the Whole on March 3, 2020, at 3:00 p.m., to hold a public hearing to consider the proposed Ordinance (File No. 191253) ordering the vacation of the sidewalk …3 Mar 2020 · Board of Supervisors · Filed
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, south side, from 41 feet to 92 feet west of 7th Street (51-foot bike share station in the floating parking lane) (Supervisor District …15 Nov 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 7th Street, east side, from 17 to 106 feet north of King Street (70-foot bike share station in hatched area) (Supervisor District 6) Laura Stonehill,…18 Oct 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
- Approving various parking and traffic modifications along Mission Street associated with the Mission Street Excelsior Safety Project17 Sep 2019 · SFMTA Board · ADOPTED — 5 ayes
- TWO-WAY PROTECTED BIKEWAY AND TRANSIT-ONLY LANE ESTABLISH – MUNI AND GOLDEN GATE TRANSIT ONLY LANE Beale Street, southbound, from Market Street to Natoma Street (converts general purpose lane from Market to Mission and r…13 Sep 2019 · Engineering hearing · Approved by City Traffic Engineer to send to SFMTA Board for legislation after environmental clearance has been obtained. Public Comments: Comments received in support.
- Ordinance ordering the street vacation of the entirety of Seawall Lot 337 (located east of Third Street between China Basin Channel and Mission Rock Street, including China Basin Park) and portions of Terry A. Francois B…10 Sep 2019 · Board of Supervisors · Passed
- Hearing of the Board of Supervisors sitting as a Committee of the Whole on September 3, 2019, at 3:00 p.m., to hold a public hearing to consider the proposed Ordinance (File No. 190654) ordering the street vacation of th…3 Sep 2019 · Board of Supervisors · Filed
- Resolution declaring the intent of the Board of Supervisors to order the street vacation for the entirety of Seawall Lot 337 (located east of Third Street between China Basin Channel and Mission Rock Street, including Ch…16 Jul 2019 · Board of Supervisors · Passed
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 7 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Octavia Boulevard Enhancement ProgramSFMTA · Current · 28 shared street segments
- Raised Bikeway Demonstration ProjectSFMTA · Completed · 15 shared street segments
- 7th Street and 8th Street Safety ProjectsSFMTA · Completed · 12 shared street segments
- Upper Market Street Safety ProjectSFMTA · Implementation / Construction · 9 shared street segments
- 5th Street Improvement ProjectSFMTA · 8 shared street segments
- Safer Taylor StreetSFMTA · Completed · 8 shared street segments
- Active Beale StreetSFMTA · 7 shared street segments
- Second Street Improvement ProjectSFMTA · Completed · 7 shared street segments
How we built this: About the Data