Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Sewer Replacement No 25
0% in published scope
Public Works · Sewer, water or power · Design · Starts 25 Feb 2027, ends 31 Mar 2028
The project's one street segment on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- Alpha St, Anderson St, Andover St, Ankeny St, Arleta Ave, Bache St
- Planned bikeway
- Shared street, 0.11 mi on Mendell St
- Would reach
- 676 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's street segment that lack one. Closer in: 1,539 residents with none within about one block (440 feet) today would have one; 1,625 residents with none within about two blocks (880 feet) today would have one
- Scope
- “2505i, WW-772”
- Dates
Start End Public consultation not published not published Construction Feb 2027 Mar 2028 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.
8 other projects on these street segments
- Visitacion Valley and Portola Community Based Transportation PlanSFMTA · Planning · 8 shared street segments
- WD-2934 16- and 8-inch Ductile Iron Water Main Replacement on Andover to Peralta from Tompkins to Cortland AveSFPUC · Design · 7 shared street segments
- Bayview Community Based Transportation PlanSFMTA · Planning · 5 shared street segments
- WD-2934 16-, 12- and 8-inch Ductile Iron Water Main Replacement on Andover to Nevada St from Tompkins to Crescent AveSFPUC · Design · 4 shared street segments
- WD-2918 8-Inch Ductile Iron Water Main Replacement, Sewer Rehabilitation and Sewer Replacement on Harkness Ave., Goettingen St., Girard St., and Various LocationsSFPUC · Design · 4 shared street segments
- Street Resurfacing Program- BBSR Paving FY 26-27Public Works · Construction · 4 shared street segments
- PW StreetResurfacingPro-BBSR Pavement Prese FY 26-27Public Works · Construction · 3 shared street segments
- Bayview Multimodal ProjectPublic Works · Design · 2 shared street segments