Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

Various Locations Sewer Replacement No 25

0% in published scope

Public Works · Sewer, water or power · Design · Starts 25 Feb 2027, ends 31 Mar 2028

Early enough to change: Public Works gives its phase as Design. No meeting on it is posted for the next 60 days.

The project's one street segment on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
Alpha St, Anderson St, Andover St, Ankeny St, Arleta Ave, Bache St
Planned bikeway
Shared street, 0.11 mi on Mendell St
Would reach
676 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's street segment that lack one. Closer in: 1,539 residents with none within about one block (440 feet) today would have one; 1,625 residents with none within about two blocks (880 feet) today would have one
Scope
“2505i, WW-772”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionFeb 2027Mar 2028
Records
Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

Construction on these street segments

202220232024202520262027202820292030todayVarious Locations Sewer Replacement …Bayview Community Based Transportati…Visitacion Valley and Portola Commun…WD-2934 16-, 12- and 8-inch Ductile …Street Resurfacing Program- BBSR Pav…PW StreetResurfacingPro-BBSR Pavemen…WD-2918 8-Inch Ductile Iron Water Ma…Bayview Multimodal ProjectWD-2934 16-, 12- and 8-inch Ductile Iron Water Main Replacement on Andover to Nevada St from Tompkins to Crescent Ave: construction 21 Apr 2025 to 31 Dec 2029Street Resurfacing Program- BBSR Paving FY 26-27: construction 1 Jul 2026 to 7 Jul 2027PW StreetResurfacingPro-BBSR Pavement Prese FY 26-27: construction 1 Jul 2026 to 7 Jul 2027WD-2918 8-Inch Ductile Iron Water Main Replacement, Sewer Rehabilitation and Sewer Replacement on Harkness Ave., Goettingen St., Girard St., and Various Locations: construction 13 Jul 2026 to 16 Feb 2029Bayview Multimodal Project: construction 30 Jun 2027 to 31 Dec 2028Bayview Community Based Transportation Plan: construction 2022 to end not publishedVisitacion Valley and Portola Community Based Transportation Plan: construction start not published to 31 May 2023Various Locations Sewer Replacement No 25: construction 25 Feb 2027 to 31 Mar 2028from 2022until 31 May 20231 Jul 2026 – 7 Jul 20271 Jul 2026 – 7 Jul 202725 Feb 2027 – 31 Mar 202821 Apr 2025 – 31 Dec 202913 Jul 2026 – 16 Feb 202930 Jun 2027 – 31 Dec 2028

Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.

8 other projects on these street segments