Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Clayton/Ashbury Traffic Island and Curb Ramps
0% in published scope
SFMTA · Bike, walk or safety · Planning · Under way, ends 10 Sep 2027
The project's one street segment on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope names bike work, but does not say whether it builds that bikeway.
- Streets
- Clayton St
- Planned bikeway
- Shared street, 0.34 mi on Clayton St
- Would reach
- 5,465 residents (2020 census), 1 school would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's street segment that lack one. Closer in: 2,325 residents with none within about one block (440 feet) today would have one; 4,246 residents with none within about two blocks (880 feet) today would have one
- Scope
- “Traffic Island Installation by BUF”
- Dates
Start End Public consultation not published not published Construction Sep 2026 Sep 2027 - Sources disagree
- The start date has passed (2026-09-09) while the phase is still Planning, per the coordination feed.
- Records
- Interagency coordination feed record (DataSF row)
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
2 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKESHARE STATION Clayton Street, west side, from Waller Street to 20 feet northerly (in existing red zone) Waller Street, south side, from Clayton Street to 21 feet w…24 Jul 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Accept work performed by M Squared Construction, Inc., under Contract No. WD-2811, 8- Inch and 16-Inch Ductile Iron Water Main Replacement on 17th Street from Clayton Street to Douglass Street and Various Side Streets; a…9 Jan 2024 · SFPUC Commission · approve items 6a through 6i
How we built this: About the Data