Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Pavement Renovation No 100
0% in published scope
Public Works · Repaving · Planning · Starts 29 Apr 2030, ends 12 Jul 2031
14 of the project's 15 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 23rd St, Apollo St, Argonaut Ave, Baldwin Ct, Bancroft Ave, Barneveld Ave
- Planned bikeway
- Shared street, 1.5 mi on Blanken Ave, Oakdale Ave, Phelps St, Kansas St
Separated bikeway, 0.25 mi on Evans Ave - Would reach
- 4,599 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 14 street segments that lack one. Closer in: 3,427 residents with none within about one block (440 feet) today would have one; 3,457 residents with none within about two blocks (880 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation not published not published Construction Apr 2030 Jul 2031 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
3 decisions on the same streets, not naming this project
- ESTABLISH – TOW–AWAY, NO PARKING ANY TIME A. Evans Avenue, south side, from Rankin Street to 193 feet easterly (removes 7 unmetered parking spaces in the vicinity of rail crossing) B. Evans Avenue, south side, from 483 f…14 Nov 2025 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- Award Contract No. WW-790, Evans Ave. and Mariposa St. Outfalls Improvements, to the responsible bidder that submitted the lowest responsive bid, Pullman SST, Inc., in the amount of $2,576,348, with a duration of 379 con…9 Sep 2025 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – TRAFFIC SIGNAL Oakdale Avenue and Loomis Street 3(b). ESTABLISH – NO TURN ON RED Oakdale Avenue, westbound, at Loomis Street 3(c). ESTABLISH – PERPENDICULAR PARKING Loomis Street, east side, from 10 feet nort…4 Sep 2020 · Engineering hearing · Approved by the City Traffic Engineer to send to the SFMTA Board for approval and implementation. Sustainable Streets Division
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Bayview Community Based Transportation PlanSFMTA · Planning · 23 shared street segments
- Visitacion Valley and Portola Community Based Transportation PlanSFMTA · Planning · 9 shared street segments
- Evans Avenue Quick-BuildSFMTA · Completed · 2 shared street segments
- Dogpatch-Central Waterfront Area Transit Connections StudySFMTA · Current · 2 shared street segments
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 2 shared street segments
- Contract 65 New Traffic SignalsSFMTA · Legislated · 2 shared street segments
- Various Locations Sewer Replacement No 39Public Works · Design · 1 shared street segment
- WW-779 Various Locations Sewer Replacement No. 32Public Works · Design · 1 shared street segment