Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Jackson Square Parking and Traffic Improvements
0% in published scope
SFMTA · Transit or parking · phase not published · Under way, ends 31 Dec 2026
The project's one street segment on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA's page for it names no bike work.
- Streets
- Sansome St
- Planned bikeway
- Separated bikeway, 0.067 mi on Sansome St
- Would reach
- 1,333 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's street segment that lack one. Closer in: 351 residents, 1 school with none within about one block (440 feet) today would have one; 134 residents with none within about two blocks (880 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation Summer 2026 Summer 2026 Construction Late 2026 Late 2026 - Records
- SFMTA project page
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
4 milestones and events from the project's own page
- SFMTA Board HearingSeptember 1, 2026 · Project page timeline · Pending
- Engineering Public HearingAugust 7, 2026 · Project page timeline · Pending
- Community Outreach BeginsSummer 2026 · Project page timeline · Pending
- Planned ImplementationLate 2026 · Project page timeline · Pending
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 3 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Battery/Sansome Quick-Build ProjectSFMTA · Completed · 4 shared street segments
- Front St and Sansome St Pavement RenovationPublic Works · Design · 4 shared street segments
- Chinatown and SOMA Large Diameter Sewer ImprovementsPublic Works · Design · 2 shared street segments
- Broadway, Pacific Ave and Vallejo St Pavement RenovationPublic Works · Planning · 2 shared street segments
- Front Street, Sansome Street, 1st Street, and Montgomery Street Pavement Sewer ReplacementPublic Works · Design · 2 shared street segments
- Kearny St, Montgomery St and Washington St Pavement RenovationPublic Works · Design · 2 shared street segments
- Various Locations Pavement Renovation Under Overhead Contact System No 1Public Works · Planning · 1 shared street segment
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 1 shared street segment
How we built this: About the Data