Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
12th Avenue Slow Street
Builds 100%
SFMTA · Bike, walk or safety · Legislated · Under way, no end date published
All 4 of the project's street segments on planned bikeway streets already have an all-ages bikeway.
- Streets
- 12th Ave
- Planned bikeway
- Shared street, 1 mi on 12th Ave
- Scope
- None published.
- Dates
Start End Public consultation not published not published Construction 2021 not published - Records
- SFMTA project page
City decisions naming this project
- Approving corridors for closure to through traffic and for inclusion in the Slow Streets Program to be in effect until 120 days after the conclusion of the COVID-19 Emergency as follows: 1. 12th Avenue from Lincoln Way t…6 Apr 2021 · SFMTA Board · ADOPTED — 6 ayes
4 decisions on the same streets, not naming this project
- Award Grant Agreement No. PRO.0300 (G), Demonstration Garden Programming and Maintenance to Earth Island Institute, acting as the fiscal sponsor for Garden for the Environment, to operate a public demonstration garden an…11 Mar 2025 · SFPUC Commission · approve the Consent Calendar Item Nos. 6a, 6b, and 6c
- Approving protected bikeway and traffic modifications on Lincoln Way and Sloat Boulevard, endorsing the closure of the Upper Great Highway and adopting the closure and findings of Proposition K3 Dec 2024 · SFMTA Board · ADOPTED — 5 ayes, 1 nay (Resolution 241203-134)
- Award Contract No. WD-2844, 12-Inch Ductile Iron Water Main Installation on Parnassus Avenue, from Stanyan Street to 6th Avenue, on Lawton Street from 7th Avenue to Funston Avenue, and Various Street Locations, to the re…24 Sep 2024 · SFPUC Commission · approve the Consent Calendar
- Accept work performed by Marinship Development Interest, LLC, for Contract No. WW-694, Lincoln Way/48th Ave Diversion Structure Modification; approve Modification No. 1 (Final), decreasing the contract amount by $7,400, …9 Feb 2021 · SFPUC Commission · approve Consent Calendar items 9a through 9d
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.
6 other projects on these street segments
- Lincoln Way Pavement RenovationPublic Works · Planning · 4 shared street segments
- Slow StreetsSFMTA · Construction · 4 shared street segments
- Joint - MTA Lead - Judah St Pavement RenovationPublic Works · Planning · 4 shared street segments
- N-JudahSFMTA · Planning · 2 shared street segments
- Various Locations Sewer Replacement No 30Public Works · Design · 1 shared street segment
- Various Locations Sewer Replacement No 37Public Works · Design · 1 shared street segment
1 documents on the project page
How we built this: About the Data