Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Sewer Replacement No 39
0% in published scope
Public Works · Sewer, water or power · Design · Starts 15 May 2028, ends 14 Nov 2029
3 of the project's 4 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 23rd St, 24th St, 25th St, 3rd St, Alabama St, Armstrong Ave
- Planned bikeway
- Shared street, 0.78 mi on Hudson Ave, Underwood Ave, Kansas St, Keith St
- Would reach
- 4,015 residents (2020 census), 1 school would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 3 street segments that lack one. Closer in: 3,927 residents with none within about one block (440 feet) today would have one; 6,722 residents with none within about two blocks (880 feet) today would have one
- Scope
- “2692i”
- Dates
Start End Public consultation not published not published Construction May 2028 Nov 2029 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
2 decisions on the same streets, not naming this project
- Award Contract No. WW-757R, Laguna, Howard, and Mission Creek Combined Sewer Discharge Improvements, to the responsible bidder that submitted the lowest responsive bid, Pullman SST, Inc., in the amount of $7,296,786, wit…13 May 2025 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – RED ZONE A. 25th Street, south side, from Connecticut Street to 29 feet easterly (removes 1 parking space) B. 25th Street, south side, from 184 feet to 306 feet east of Connecticut Street (removes 6 parking s…8 Jul 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation. # (only 16(b) is reviewable by BOS)
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.
8 other projects on these street segments
- Bayview Community Based Transportation PlanSFMTA · Planning · 13 shared street segments
- WW-779 Various Locations Sewer Replacement No. 32Public Works · Design · 4 shared street segments
- Bayview Multimodal ProjectPublic Works · Design · 3 shared street segments
- Dogpatch-Central Waterfront Area Transit Connections StudySFMTA · Current · 3 shared street segments
- WD-2937 2425-003: 8-inch Ductile Iron Water Main Replacement on Underwood, Thomas, and Shafter Aves from 3rd St to Griffith StSFPUC · Design · 3 shared street segments
- PW Various Locations Sewer Replacement No 18Public Works · Construction · 2 shared street segments
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 2 shared street segments
- Bayview Community PathwaySFMTA · Planning · 2 shared street segments
How we built this: About the Data