Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Geneva-San Jose Intersection Study
No known overlap
SFMTA · Bike, walk or safety · Current · No start date published, no end date published
None of the project's street segments is on the Biking and Rolling Plan's network. It is listed because SFMTA tags the project Bike.
- Streets
- 19th Ave, 3rd St, Geneva Ave, Jose Ave
- Planned bikeway
- Nothing on these street segments.
- Scope
- None published.
- Dates
Start End Public consultation 26 Oct 2016 26 Oct 2016 Construction not published not published - Sources disagree
- The project page's timeline and event cards give the latest public consultation as 2016-10-26; the page's text gives 2019-11-19 (“November 19, 2019”).
- Records
- SFMTA project page
City decisions naming this project
- Update on the Geneva/San Jose Intersection Study22 Oct 2019 · SFCTA Board
3 milestones and events from the project's own page
- Pop up: San Jose at Geneva Avenue19 Nov 2019 · Project page event
- Pop up: San Jose at Geneva Avenue14 Nov 2019 · Project page event
- San Jose-Geneva Intersection Study Open House26 Oct 2016 · Project page event
5 decisions on the same streets, not naming this project
- ESTABLISH - CLASS 2 BIKE LANE Geneva Avenue, both directions, between Prague Street and Brookdale Avenue Dusson Yeung, [staff email removed — see the order] (Supervisor Districts 10 & 11) Upgrade narrow shoulders to 5-fo…16 Apr 2021 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Geneva Avenue, north side, from 20 feet to 86 feet east of Moscow Street (62-foot station with red zones on either end) (Supervisor District 11) Laur…6 Dec 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
- Ordinance ordering the street vacation of the entirety of Seawall Lot 337 (located east of Third Street between China Basin Channel and Mission Rock Street, including China Basin Park) and portions of Terry A. Francois B…10 Sep 2019 · Board of Supervisors · Passed
- Hearing of the Board of Supervisors sitting as a Committee of the Whole on September 3, 2019, at 3:00 p.m., to hold a public hearing to consider the proposed Ordinance (File No. 190654) ordering the street vacation of th…3 Sep 2019 · Board of Supervisors · Filed
- Resolution declaring the intent of the Board of Supervisors to order the street vacation for the entirety of Seawall Lot 337 (located east of Third Street between China Basin Channel and Mission Rock Street, including Ch…16 Jul 2019 · Board of Supervisors · Passed
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.
6 other projects on these street segments
- Balboa Park Station Area and Plaza ImprovementsSFMTA · Current · 7 shared street segments
- District 11-Wide Traffic Calming ProjectSFMTA · 7 shared street segments
- Geneva Avenue Traffic Signal ProjectPublic Works · In progress · 4 shared street segments
- Excelsior Neighborhood Traffic Calming ProjectSFMTA · Completed · 2 shared street segments
- PW - M & J Lines - Muni Forward ProjectPublic Works · Design · 2 shared street segments
- M Ocean View Transit and Safety ProjectSFMTA · Quick-Build Implementation and Detailed Design · 1 shared street segment
2 documents on the project page
How we built this: About the Data