Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
5th Street Improvement Project
Builds 53%
SFMTA · Bike, walk or safety · phase not published · Under way, no end date published
6 of the project's 13 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA's bikeway layer and project page show it building or upgrading 0.62 mi of the plan's bikeway.
- Streets
- Townsend St, Market St, 5th St
- Planned bikeway
- Separated bikeway, 0.97 mi on Townsend St, 5th St
Shared street, 0.55 mi on Market St - Would reach
- 0 residents (2020 census), 3 schools would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 6 street segments that lack one. Closer in: 333 residents with none within about one block (440 feet) today would have one; 67 residents, 3 schools with none within about two blocks (880 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation January 2018 11 Dec 2019 Construction Fall 2019 not published - Sources disagree
- SFMTA's page gives an earlier phase's construction end, 2023-10 (“Fall 2023”), and dates later work to 2027-04 with no construction end, so no end is shown.
The project page's timeline and event cards give the latest public consultation as 2019-12-11; the page's text gives 2019-04-20 (“April 20, 2019”). - Records
- SFMTA project page
City decisions naming this project
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, south side, from 235 feet to 340 feet east of 5th Street (105-foot bike share station in the parking lane) (Supervisor District 6) Lau…15 Nov 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
- Approving parking protected bicycle lanes and various parking and traffic modifications along 5th Street between Market Street and Townsend Street associated with the 5th Street Improvement Project as follows Approving p…17 Sep 2019 · SFMTA Board · ADOPTED — 5 ayes
7 milestones and events from the project's own page
- District 6 Bicycle and Pedestrian Safety Open House11 Dec 2019 · Project page event
- 5th Street Improvement Project Office Hours (Weekend)20 Apr 2019 · Project page event
- 5th Street Improvement Project Office Hours (Weekday)16 Apr 2019 · Project page event
- Open House #2 in (Winter 2018 – Spring 2019)April 2019 · Project page timeline
- Community office hours in (Winter 2018 – Spring 2019)April 2019 · Project page timeline
- Stakeholder Workshop in (Winter 2018 – Spring 2019)November 2018 · Project page timeline
- Open House #1 in (Winter 2018 – Spring 2019)January 2018 · Project page timeline
18 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 3rd Street, east side, from 42 feet to 116 feet south of the crosswalk at King Street (74-foot bike share station) (Supervisor District 6) (Approvab…5 Apr 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase of $215,000 to the contract cost contingency and an increase of 50 calendar days to the contract duration contingency for Contract No. WW-707R, Various Locations Sewer Replacement No. 11, with Basset …26 Sep 2023 · SFPUC Commission · approve the Consent Calendar
- Accept work performed by D’Arcy & Harty Construction, Inc for Contract No. WW-712, New Montgomery, Jessie, Minna, and Mission Street Brick Sewer Rehabilitation, for a total contract amount of $6,891,778, and with a total…9 May 2023 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Brannan Street, south side, from 229 feet to 297 feet west of 7th Street (62-foot bike share station with red zone on western end) (Supervisor Distri…19 Aug 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 5th Street, west side, from 6 feet to 92 feet south of Howard Street (86-foot bike share station with angled plates in floating buffer) (Supervisor D…8 Apr 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Approve an increase of $2,250,000 to the contract cost contingency, and an increase of 180 consecutive calendar days to the contract duration contingency for Contract No. WW-712, New Montgomery, Jessie, Minna, and Missio…8 Feb 2022 · SFPUC Commission · approve Item 10
- Approve an increase of 30 consecutive calendar days to the contract duration contingency for Contract No. WW-703, Mission Street, 16th to Cesar Chavez Street, Brick Sewer Rehabilitation; and authorize the General Manager…14 Dec 2021 · SFPUC Commission · approve Consent Calendar items 10a through 10g
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Brannan Street, south side, from 130 feet to 188 feet west of 5th Street (52-foot bike share station with red zones on either side) (Supervisor Distr…5 Nov 2021 · Engineering hearing · Continued pending further discussions.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Brannan Street, south side, from 262 feet to 319 feet east of 6th Street (53-foot bike share station) 24(b). ESTABLISH – WHITE ZONE, PASSENGER LOADIN…12 Jun 2020 · Engineering hearing · On hold for further color curb analysis. # footnote applies to items 24(b) and 24(c). Public Comments: Comments received in opposition.
- Ordinance ordering the vacation of the sidewalk portion of streets on the south side of Mission Street at the intersection of Mission and Fremont Streets and on the east side of Fremont Street at the same intersection to…10 Mar 2020 · Board of Supervisors · Passed
- Hearing of the Board of Supervisors sitting as a Committee of the Whole on March 3, 2020, at 3:00 p.m., to hold a public hearing to consider the proposed Ordinance (File No. 191253) ordering the vacation of the sidewalk …3 Mar 2020 · Board of Supervisors · Filed
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Brannan Street, south side, from 65 feet to 166 feet west of Colin P. Kelly Jr. Street (92-foot bike share station with red zones on either side) (Su…21 Feb 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Objection to expanding the station received.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Brannan Street, south side, from 89 feet to 155 feet west of 7th Street (62-foot bike share station with red zones on either side) (Supervisor Distri…18 Oct 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
- Approving various parking and traffic modifications along Mission Street associated with the Mission Street Excelsior Safety Project17 Sep 2019 · SFMTA Board · ADOPTED — 5 ayes
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Townsend Street, north side, from 27 feet 124 feet west of 5th Street (expanding existing bike share station to the west by 15 feet) ♦ 11(b). ESTABLI…13 Sep 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: One comment in opposition.
- Ordinance ordering the street vacation of the entirety of Seawall Lot 337 (located east of Third Street between China Basin Channel and Mission Rock Street, including China Basin Park) and portions of Terry A. Francois B…10 Sep 2019 · Board of Supervisors · Passed
- Hearing of the Board of Supervisors sitting as a Committee of the Whole on September 3, 2019, at 3:00 p.m., to hold a public hearing to consider the proposed Ordinance (File No. 190654) ordering the street vacation of th…3 Sep 2019 · Board of Supervisors · Filed
- Resolution declaring the intent of the Board of Supervisors to order the street vacation for the entirety of Seawall Lot 337 (located east of Third Street between China Basin Channel and Mission Rock Street, including Ch…16 Jul 2019 · Board of Supervisors · Passed
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 5 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Better Market StreetSFMTA · Current · 8 shared street segments
- 5th St Safety Improvement ProjectPublic Works · Planning · 5 shared street segments
- DTX - Downtown Rail Extensionother · Design · 2 shared street segments
- Chinatown and SOMA Large Diameter Sewer ImprovementsPublic Works · Design · 2 shared street segments
- Turk Street Safety ProjectSFMTA · Completed · 2 shared street segments
- Townsend Corridor Improvement ProjectSFMTA · Completed · 1 shared street segment
- Various Locations Pavement Renovation No 62Public Works · Construction · 1 shared street segment
- 85 Bluxome Stother · Planning · 1 shared street segment
How we built this: About the Data