Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Pavement Renovation Concrete No 94
0% in published scope
Public Works · Repaving · Planning · Starts 1 Feb 2031, ends 15 Apr 2032
All 3 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 25th St, Franconia St, Hamilton St, La Grande Ave, Maddux Ave, Mansell St
- Planned bikeway
- Separated bikeway, 0.26 mi on Mansell St
- Would reach
- 546 residents (2020 census), 1 school would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 3 street segments that lack one. Closer in: 1,334 residents, 2 schools with none within about one block (440 feet) today would have one; 1,207 residents, 2 schools with none within about two blocks (880 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation not published not published Construction Feb 2031 Apr 2032 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
1 decisions on the same streets, not naming this project
- ESTABLISH – RED ZONE A. 25th Street, south side, from Connecticut Street to 29 feet easterly (removes 1 parking space) B. 25th Street, south side, from 184 feet to 306 feet east of Connecticut Street (removes 6 parking s…8 Jul 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation. # (only 16(b) is reviewable by BOS)
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 3 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Visitacion Valley and Portola Community Based Transportation PlanSFMTA · Planning · 6 shared street segments
- Bayview Community Based Transportation PlanSFMTA · Planning · 4 shared street segments
- Dogpatch-Central Waterfront Area Transit Connections StudySFMTA · Current · 3 shared street segments
- District 11-Wide Traffic Calming ProjectSFMTA · 2 shared street segments
- Various Locations Sewer Replacement No 25Public Works · Design · 1 shared street segment
- WD-2918 8-Inch Ductile Iron Water Main Replacement, Sewer Rehabilitation and Sewer Replacement on Harkness Ave., Goettingen St., Girard St., and Various LocationsSFPUC · Design · 1 shared street segment
- 8-Inch Ductile Iron Water Main Replacement on Harkness, Goettingen, Brussels, Girard Streets and Various StreetsPublic Works · Design · 1 shared street segment
- Excelsior Neighborhood Traffic Calming ProjectSFMTA · Completed · 1 shared street segment
How we built this: About the Data