Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Sewer Replacement No 34
0% in published scope
Public Works · Sewer, water or power · Design · Starts 1 Jun 2028, ends 31 May 2029
All 5 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- Bacon St, Bowdoin St, Brussels St, Burrows St, Colby St, Dartmouth St
- Planned bikeway
- Shared street, 0.81 mi on Girard St, Silliman St
- Would reach
- 1,178 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 5 street segments that lack one. Closer in: 2,706 residents, 1 school with none within about one block (440 feet) today would have one; 1,683 residents, 1 school with none within about two blocks (880 feet) today would have one
- Scope
- “2686i”
- Dates
Start End Public consultation not published not published Construction Jun 2028 May 2029 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.
7 other projects on these street segments
- Visitacion Valley and Portola Community Based Transportation PlanSFMTA · Planning · 13 shared street segments
- PW Various Locations Sewer Replacement (JV VL PR No 89)Public Works · Design · 2 shared street segments
- Various Locations Pavement Renovation No 89Public Works · Design · 2 shared street segments
- San Bruno Ave Pavement RenovationPublic Works · Design · 2 shared street segments
- Slow StreetsSFMTA · Construction · 2 shared street segments
- WD-2918 8-Inch Ductile Iron Water Main Replacement, Sewer Rehabilitation and Sewer Replacement on Harkness Ave., Goettingen St., Girard St., and Various LocationsSFPUC · Design · 1 shared street segment
- Somerset Slow StreetSFMTA · 1 shared street segment
How we built this: About the Data