Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Central Embarcadero Safety Project
Builds 19%
SFMTA · Bike, walk or safety · Design · Under way, ends 31 Dec 2028
13 of the project's 20 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA's bikeway layer and project page show it building or upgrading 0.62 mi of the plan's bikeway.
- Streets
- The Embarcadero, Howard St
- Planned bikeway
- Separated bikeway, 4.9 mi on The Embarcadero, Howard St
- Scope
- None published.
- Dates
Start End Public consultation 2014 2019 Construction 2026-2028 Dec 2028 - Sources disagree
- The project page's timeline gives construction starting 2026; the page's text gives 2027 (“early 2027”).
The start date has passed (2026) while the phase is still Design, per the project page's timeline (the stage after the last one marked Completed: “2023-2025 Design”). - Not yet checked
- The latest public consultation shown, 2019-12-31, was read from the words “2019” on SFMTA's project page by a model, and a person has not confirmed it.
- Records
- SFMTA project page
City decisions naming this project
- Adopting a Resolution of Local Support for the programming of $34,277,000 of One Bay Area Grant Cycle 3 funds for the Central Embarcadero Safety Project7 Mar 2023 · SFMTA Board · ADOPTED — 6 ayes (Resolution 230307-021)
- Embarcadero Enhancement Program and Central Embarcadero Safety Project1 Jun 2021 · SFMTA Board
4 milestones and events from the project's own page
- Construction2026-2028 · Project page timeline · Pending
- Design2023-2025 · Project page timeline · Pending
- Preliminary Engineering2019-2022 · Project page timeline · Completed
- Planning2014-2018 · Project page timeline · Completed
27 decisions on the same streets, not naming this project
- Award Contract No. WW-757R, Laguna, Howard, and Mission Creek Combined Sewer Discharge Improvements, to the responsible bidder that submitted the lowest responsive bid, Pullman SST, Inc., in the amount of $7,296,786, wit…13 May 2025 · SFPUC Commission · approve the Consent Calendar
- Approving Class IV protected bikeway on Howard Street between The Embarcadero and 4th Street; and approving various traffic and parking modifications ESTABLISH – LEFT LANE MUST TURN LEFT – Howard Street, westbound, from …16 Apr 2024 · SFMTA Board · ADOPTED — 7 ayes (Resolution 240416-044)
- RESCIND – CLASS IV BIKEWAY (PARKING PROTECTED BIKEWAY) Howard Street, westbound, north side, between The Embarcadero and 4th Street (curbside bike lane with buffer and floating parking) 12(b). ESTABLISH – CLASS IV BIKEWA…2 Feb 2024 · Engineering hearing · Noted approval path. Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- Approve an increase of $215,000 to the contract cost contingency and an increase of 50 calendar days to the contract duration contingency for Contract No. WW-707R, Various Locations Sewer Replacement No. 11, with Basset …26 Sep 2023 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH - NO PARKING ANY TIME, EXCEPT BICYCLES Howard Street, south side, from 45 feet to 66 feet east of 2nd Street (Supervisor District 6) (Approvable by the City Traffic Engineer) Jason Hyde, [staff email removed — …19 May 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Accept work performed by D’Arcy & Harty Construction, Inc for Contract No. WW-712, New Montgomery, Jessie, Minna, and Mission Street Brick Sewer Rehabilitation, for a total contract amount of $6,891,778, and with a total…9 May 2023 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION North Point Street, south side, from 9 feet to 93 feet east of Columbus Avenue (Supervisor District 3) (Approvable by the City Traffic Engineer) Laur…3 Feb 2023 · Engineering hearing · Held pending the outcome of further stakeholder discussion.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Brannan Street, south side, from 229 feet to 297 feet west of 7th Street (62-foot bike share station with red zone on western end) (Supervisor Distri…19 Aug 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Howard Street, north side, from 19 feet to 54 feet east of Grace Street (35-foot bike share station in floating parking lane) (Supervisor District 6)…4 Mar 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Approve an increase of $2,250,000 to the contract cost contingency, and an increase of 180 consecutive calendar days to the contract duration contingency for Contract No. WW-712, New Montgomery, Jessie, Minna, and Missio…8 Feb 2022 · SFPUC Commission · approve Item 10
- Approve an increase of 30 consecutive calendar days to the contract duration contingency for Contract No. WW-703, Mission Street, 16th to Cesar Chavez Street, Brick Sewer Rehabilitation; and authorize the General Manager…14 Dec 2021 · SFPUC Commission · approve Consent Calendar items 10a through 10g
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Brannan Street, south side, from 130 feet to 188 feet west of 5th Street (52-foot bike share station with red zones on either side) (Supervisor Distr…5 Nov 2021 · Engineering hearing · Continued pending further discussions.
- Approving a protected bikeway and parking restrictions on Washington Street between Drumm Street and the Embarcadero and turn restrictions at the intersections of the Embarcadero with Broadway and Washington Street as se…21 Sep 2021 · SFMTA Board · ADOPTED — 6 ayes (Resolution 210921-108)
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION North Point Street, north side, from 141 feet to 225 feet east of Powell Street (75-foot bike share station with red zones on either side) (Approvabl…18 Jun 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Approve the plans and specifications, and award Contract No. WW-712, New Montgomery, Jessie, Minna, and Mission Streets Brick Sewer Rehabilitation, in the amount of $4,888,750, and with a duration of 390 consecutive cale…11 May 2021 · SFPUC Commission · approve Consent Calendar items 8c, 8d, and 8g
- Approving the following traffic modifications 102 A. ESTABLISH –TOW-AWAY, NO PARKING ANYTIME –Howard Street, north side, from Beale Street to 51 feet westerly5 Jan 2021 · SFMTA Board · ADOPTED — 5 ayes (Resolution 210105-002)
- RESCIND – METERED YELLOW COMMERCIAL LOADING ZONE, 7 AM TO 6 PM, MONDAY THROUGH FRIDAY Battery Street, west side, from 13 feet to 89 feet north of California Street (4 spaces) 10(b). ESTABLISH – NO STOPPING EXCEPT BICYCLE…16 Oct 2020 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Brannan Street, south side, from 262 feet to 319 feet east of 6th Street (53-foot bike share station) 24(b). ESTABLISH – WHITE ZONE, PASSENGER LOADIN…12 Jun 2020 · Engineering hearing · On hold for further color curb analysis. # footnote applies to items 24(b) and 24(c). Public Comments: Comments received in opposition.
- Ordinance ordering the vacation of the sidewalk portion of streets on the south side of Mission Street at the intersection of Mission and Fremont Streets and on the east side of Fremont Street at the same intersection to…10 Mar 2020 · Board of Supervisors · Passed
- Hearing of the Board of Supervisors sitting as a Committee of the Whole on March 3, 2020, at 3:00 p.m., to hold a public hearing to consider the proposed Ordinance (File No. 191253) ordering the vacation of the sidewalk …3 Mar 2020 · Board of Supervisors · Filed
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Brannan Street, south side, from 65 feet to 166 feet west of Colin P. Kelly Jr. Street (92-foot bike share station with red zones on either side) (Su…21 Feb 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Objection to expanding the station received.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION North Point Street, north side, from 4.5 feet to 61 feet west of Grant Avenue (53-foot bike share station with red zones at either end) (Supervisor D…7 Feb 2020 · Engineering hearing · On hold for further discussions with Fisherman’s Wharf Community Benefit District and bike rental companies. Public Comments: Comments received in opposition.
- ESTABLISH – TOW-AWAY, NO STOPPING ANYTIME Townsend Street, south side, from 3rd Street to 209 feet westerly (removes 5 general meter parking spaces) 26(b). ESTABLISH – CLASS IV BIKEWAY (PROTECTED BIKEWAY) Townsend Street…24 Jan 2020 · Engineering hearing · Approved by the City Traffic Engineer to send to send items 26(a) through 26(f) to the SFMTA Board for legislation. 26(g) and 26(h) amended as underlined per follow-up with public hearing attendees and approved by the City Traffic Engineer for implementation. # note applies to item 26(g). Public Com
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Battery Street, east side, from 37 feet to 126 feet south of Filbert Street (89-foot bike share station) (Supervisor District 3) Laura Stonehill, [st…6 Dec 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Brannan Street, south side, from 89 feet to 155 feet west of 7th Street (62-foot bike share station with red zones on either side) (Supervisor Distri…18 Oct 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
- Approving various parking and traffic modifications along Mission Street associated with the Mission Street Excelsior Safety Project17 Sep 2019 · SFMTA Board · ADOPTED — 5 ayes
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Townsend Street, north side, from 27 feet 124 feet west of 5th Street (expanding existing bike share station to the west by 15 feet) ♦ 11(b). ESTABLI…13 Sep 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: One comment in opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 5 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- SF Bay Ferry Downtown Ferry Terminal Electrification Projectother · Design · 11 shared street segments
- The Embarcadero 2020 Quick-Build ProjectsSFMTA · Project Evaluation · 10 shared street segments
- Northern Waterfront Electrical Improvements (NWEI)SFPUC · Planning · 10 shared street segments
- Stormwater Trash CapturePublic Works · Design · 7 shared street segments
- Transbay Howard Streetscape Improvement ProjectSFMTA · Implementation / Construction · 7 shared street segments
- Howard Street Quick-Build ProjectSFMTA · Completed · 6 shared street segments
- Brannan Street Safety ProjectSFMTA · Completed · 5 shared street segments
- Train Control Upgrade Project - Phase 1Public Works · Design · 4 shared street segments
How we built this: About the Data