Laurel Heights/Jordan Park Traffic Calming Project

Not stated

SFMTA · Bike, walk or safety · Implementation / Construction · No start date published, no end date published

8 of the project's 14 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA lists it as a bike project, but does not say whether it builds that bikeway.

Streets
Euclid Ave, Arguello Blvd
Planned bikeway
Shared street, 1.4 mi on Euclid Ave
Separated bikeway, 0.26 mi on Arguello Blvd
Would reach
166 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 8 street segments that lack one. Closer in: 2,002 residents with none within about one block (440 feet) today would have one; 1,001 residents with none within about two blocks (880 feet) today would have one
Scope
None published.
Records
SFMTA project page

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

6 decisions on the same streets, not naming this project

Construction on these street segments

20262027202820292030todayStreet Resurfacing Program- BBSR Pav…WD-2936 8-, 12- & 16-inch Ductile Ir…PW Various Locations Sewer Replaceme…Various Locations Sewer Replacement …Street Resurfacing Program- BBSR Paving FY 26-27: construction 1 Jul 2026 to 7 Jul 2027WD-2936 8-, 12- & 16-inch Ductile Iron Water Main Replacement on Geary Boulevard from Stanyan Street to Presidio Avenue & on Post Street from Presidio Avenue to Scott Street & on Various Side Streets: construction 4 Feb 2027 to 4 Feb 2029PW Various Locations Sewer Replacement No 31: construction 7 Jun 2027 to 9 Jun 2028Various Locations Sewer Replacement No 33: construction 1 Jun 2028 to 31 May 20291 Jul 2026 – 7 Jul 20277 Jun 2027 – 9 Jun 20281 Jun 2028 – 31 May 20294 Feb 2027 – 4 Feb 2029

Construction start and end as each department publishes them; a dot where only one is published.

4 other projects on these street segments
3 documents on the project page